Duncan Hill Treated Water Improvements Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Duncan Hill Treated Water Improvement Project, identified by project number 3110005-011C, is led by the Placer County Water Agency and funded by the State Water Board. Located in the unincorporated community of Ophir within Placer County, California, the project involves the installation of approximately 1.5 miles of treated water pipeline across Millertown Road, Calnick Lane, Voyiatzes Road, Duncan Hill Road, and Ophir Road. The scope of work also includes the installation of 560 feet of pipeline beneath non-native grasslands and the placement of two pressure-reducing stations along the project alignment to ensure proper system operation. The project is classified under NAICS code 237110 and was forecasted for June 15, 2026. Environmental compliance is a critical component of the project, as it adheres to a Mitigated Negative Declaration adopted under CEQA guidelines. This includes strict adherence to specific mitigation measures and a formal mitigation monitoring and reporting program to ensure no significant environmental effects occur. Key administrative contacts for the project include Heather Trejo of the Placer County Water Agency and Robyn Mendoza of the State Water Board.

General Info

State Water Board funds 1.5-mile pipeline project with two pressure stations in Placer County.

Agency

California → Placer County Water Agency

Place of Performance

Ophir Rd, Duncan Hill Rd, Voyiatzes Rd, Millertown Rd, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Placer County Water Agency
Contacts2 people available
OfficeN/A
Organization / Agency
California → Placer County Water Agency
Office AddressN/A
Contacts
Robyn MendozaEnvironmental Scientist
Heather TrejoEnvironmental Scientist

Full Description

Show more
The State Water Board is funding the Project referred to internally as Duncan Hill Treated Water Improvement Project. The Project involves the installation of approximately 1.5 miles of treated pipeline within Millertown Road, Calnick Lane, Voyiatzes Road, Duncan Hill Road and Ophir Road, and 560 feet of pipeline that would be installed beneath non-native grasslands. Additionally, two pressure-reducing stations would be installed along the proposed Project alignment for the system to operate properly. PROJECT NUMBER: 3110005-011C

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, was posted on November 10, 2026, with a response deadline of December 4, 2026. The opportunity is open to various SBA-certified small business categories, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The scope of work involves comprehensive sewer infrastructure improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of sanitary sewer pipes ranging from 6 to 30 inch PVC and 18 to 24 inch DIP, the construction of standard and doghouse manholes, and the execution of 24-inch diameter DIP trenchless crossings with associated launch and receiving shafts. Additional requirements include the fit out of a CSO regulator, outfall installation, and site work such as clearing 5,130 square yards of wooded areas, seeding, and fine grading. Contractors must also provide specialized services including SWPPP implementation and maintenance, geotechnical instrumentation and monitoring, and railroad insurance. The project involves significant excavation work, including extra depth excavation for pipes and manholes, as well as the abandonment of existing pipes and manholes. Interested firms should contact John Connelly at Cleary Construction for bid documents and to discuss subcontracting opportunities.
Cleary Construction, Inc.

POSTED

about 8 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. The project requires all necessary labor, materials, and equipment to ensure a fully functional system, with specific technical requirements including AC paving, pipe and fitting installation, jack and bore operations, cold planing, demolition, potholing, welding, and the implementation of SWPPP. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, as well as other certified partners such as MBE, SBE, WBE, SBRA, and LSAF. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for the project are Destiny and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the provided bid documents and agency specifications.
Norstar Plumbing and Engineering, Inc

POSTED

about 8 hours ago

DEADLINE

in 8 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS