Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

DWA/CVWD Interconnection No. 2

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The DWA/CVWD Interconnection No. 2 project, managed by the Desert Water Agency, involves the construction and operation of a potable water pipeline in Cathedral City, California. The system is designed to facilitate the transfer of water from the Coachella Valley Water District to the Desert Water Agency at a capacity of up to 2,500 gallons per minute. The scope of work includes installing approximately 1,450 linear feet of thermoplastic pipe beneath the Whitewater River Channel at the Cimarron Golf Resort, connecting the line to an existing CVWD 12-inch waterline at a well site and a DWA 12-inch waterline within a DWA easement, along with the installation of all necessary valves and appurtenances. The project is subject to a Mitigated Negative Declaration under CEQA, requiring adherence to a specific mitigation monitoring and reporting program. Key operational requirements include strict compliance with Cathedral City noise ordinances and Cal/OSHA sound emission standards, as well as local traffic regulations. Special provisions are in place for archaeological discoveries, requiring a total work stoppage within a 50-foot radius of any find and notification of the Senior Engineer, Adrian Biggs. Additionally, the project allows for a tribal monitor approved by the Agua Caliente Band of Cahuilla Indians to be present during ground-disturbing activities such as trenching and initial drilling.

General Info

DWA and CVWD to build 1,450-ft water pipeline connecting two 12-inch lines at 2,500 GPM maximum capacity.

Agency

California → Desert Water Agency

Place of Performance

Ramon Road, Landau Boulevard, Cathedral City, CA, 92234

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Desert Water Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Desert Water Agency
Office AddressN/A
Contacts
Adrian BiggsSenior Engineer

Full Description

Show more
DWA/CVWD Interconnection No. 2 (the Project) consists generally of constructing and operating a potable water pipeline between an existing Coachella Valley Water District (CVWD) pipeline and an existing Desert Water Agency (DWA) pipeline to facilitate the transfer of water from CVWD's potable water system to DWA's potable water system at a capacity of up to 2,500 gallons per minute. The Project includes approximately 1,450 linear feet of thermoplastic pipe installed beneath the Whitewater River Channel at a location occupied by the Cimarron Golf Resort, connection of the pipe to an existing CVWD 12-inch waterline at an existing CVWD well site, connection of the pipeline to an existing DWA 12-inch waterline located within an easement held by DWA, and installation of associated valves, piping, and appurtenances. Project facilities will be operated as needed to transfer water from CVWD's potable water system to DWA's potable water system, as coordinated and agreed by both DWA and CVWD.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, was posted on November 10, 2026, with a response deadline of December 4, 2026. The opportunity is open to various SBA-certified small business categories, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. The scope of work involves comprehensive sewer infrastructure improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of sanitary sewer pipes ranging from 6 to 30 inch PVC and 18 to 24 inch DIP, the construction of standard and doghouse manholes, and the execution of 24-inch diameter DIP trenchless crossings with associated launch and receiving shafts. Additional requirements include the fit out of a CSO regulator, outfall installation, and site work such as clearing 5,130 square yards of wooded areas, seeding, and fine grading. Contractors must also provide specialized services including SWPPP implementation and maintenance, geotechnical instrumentation and monitoring, and railroad insurance. The project involves significant excavation work, including extra depth excavation for pipes and manholes, as well as the abandonment of existing pipes and manholes. Interested firms should contact John Connelly at Cleary Construction for bid documents and to discuss subcontracting opportunities.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 23 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. The project requires all necessary labor, materials, and equipment to ensure a fully functional system, with specific technical requirements including AC paving, pipe and fitting installation, jack and bore operations, cold planing, demolition, potholing, welding, and the implementation of SWPPP. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, as well as other certified partners such as MBE, SBE, WBE, SBRA, and LSAF. Interested parties must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for the project are Destiny and Nathan Plummer of Norstar Plumbing and Engineering, Inc. All work must be performed in strict accordance with the provided bid documents and agency specifications.
Norstar Plumbing and Engineering, Inc

POSTED

about 5 hours ago

DEADLINE

in 8 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS