Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

DWA/CVWD Interconnection No. 2

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The DWA/CVWD Interconnection No. 2 project, managed by the Desert Water Agency, involves the construction and operation of a potable water pipeline in Cathedral City, California. The system is designed to facilitate the transfer of water from the Coachella Valley Water District to the Desert Water Agency at a capacity of up to 2,500 gallons per minute. The scope of work includes installing approximately 1,450 linear feet of thermoplastic pipe beneath the Whitewater River Channel at the Cimarron Golf Resort, connecting the line to an existing CVWD 12-inch waterline at a well site and a DWA 12-inch waterline within a DWA easement, along with the installation of all necessary valves and appurtenances. The project is subject to a Mitigated Negative Declaration under CEQA, requiring adherence to a specific mitigation monitoring and reporting program. Key operational requirements include strict compliance with Cathedral City noise ordinances and Cal/OSHA sound emission standards, as well as local traffic regulations. Special provisions are in place for archaeological discoveries, requiring a total work stoppage within a 50-foot radius of any find and notification of the Senior Engineer, Adrian Biggs. Additionally, the project allows for a tribal monitor approved by the Agua Caliente Band of Cahuilla Indians to be present during ground-disturbing activities such as trenching and initial drilling.

General Info

DWA and CVWD to build 1,450-ft water pipeline connecting two 12-inch lines at 2,500 GPM maximum capacity.

Agency

California → Desert Water Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Ramon Road, Landau Boulevard, Cathedral City, CA, 92234

Set-Aside

NONE

Documents

(1)

DWA-CVWD Interconnection No 2 Notice of Determination

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Desert Water Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Desert Water Agency
Office AddressN/A
Contacts
Adrian BiggsSenior Engineer

Full Description

Show more
DWA/CVWD Interconnection No. 2 (the Project) consists generally of constructing and operating a potable water pipeline between an existing Coachella Valley Water District (CVWD) pipeline and an existing Desert Water Agency (DWA) pipeline to facilitate the transfer of water from CVWD's potable water system to DWA's potable water system at a capacity of up to 2,500 gallons per minute. The Project includes approximately 1,450 linear feet of thermoplastic pipe installed beneath the Whitewater River Channel at a location occupied by the Cimarron Golf Resort, connection of the pipe to an existing CVWD 12-inch waterline at an existing CVWD well site, connection of the pipeline to an existing DWA 12-inch waterline located within an easement held by DWA, and installation of associated valves, piping, and appurtenances. Project facilities will be operated as needed to transfer water from CVWD's potable water system to DWA's potable water system, as coordinated and agreed by both DWA and CVWD.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 10 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 10 hours ago

DEADLINE

in about 22 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS