This Sources Sought opportunity from Department Of Defense was posted on December 9, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dworshak Powerhouse Roof Replacement

Closed
W912EF26RSS05Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project covers approximately 800 gross square feet and requires the design and installation of a framing system, a 60 mil EPDM single-ply roofing system with a 3% slope, and three LED strip light fixtures, including one emergency backup. All work must comply with OSHA 29 CFR Part 1926, the Architectural Barriers Act Accessibility Standard of 2007, and Job Corps sustainability guidelines. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be awarded based on overall best value. Interested bidders must conduct a physical site visit and submit a signed attendance roster to be considered. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout, and a bid bond equal to 20% of the base bid for any quote equal to or exceeding $25,000. Awarded contractors must provide performance and payment bonds for projects over $25,000, maintain specific insurance minimums, and adhere to California prevailing wage rates with weekly certified payroll reporting. Additionally, contracts valued at $40,000 or more are subject to FFATA reporting requirements.
Inland Empire Job Corps

POSTED

about 10 hours ago

DEADLINE

in 13 days
NAICS: 238160
New
SLED
26-11166 IFB Parapet Flashing Installation
Solicitation # 26-11166
Greene County, Missouri, is soliciting bids under solicitation number 26-11166 for the installation of new roof flashing on the parapet wall of the Historic Courthouse located at 940 N Boonville Ave., Springfield, MO. The scope of work includes the removal of existing metal flashing, seals, and damaged underlayment, followed by the inspection and repair of the roof deck and insulation. The contractor is required to install 3/4 inch exterior grade plywood fastened to the masonry cap, a 60mil TPO roof membrane, and weldable metal flashing using high-performance elastomeric or polyurethane adhesives to ensure a permanent watertight seal. The contract will be awarded to the lowest responsive responsible bidder, with evaluation factors including prior work experience and the proposed time of completion. Bidders must submit their proposals via the Greene County Electronic Bidding Portal by the specified deadline. Required submission documents include a manually signed title page, an Experience Statement demonstrating completion of comparable projects, an E-Verify Signature Page, and a Federal Tax ID. For contracts exceeding 5,000 dollars, a notarized affidavit is required. The successful contractor must provide performance and payment bonds at 110 percent of the contract value and comply with the Missouri Domestic Product Procurement Act, Clean Air and Clean Water Acts, and prevailing wage statutes if the project exceeds 75,000 dollars. Final acceptance of the work will be conducted at the destination by an authorized representative of the County.
Greene County

POSTED

about 12 hours ago

DEADLINE

in 23 days
NAICS: 238160
New
Federal
26Z1AY6_Replace Roofing_FCC Butner
Solicitation # 15B10627PR000102
The Federal Bureau of Prisons is conducting market research through a Sources Sought Notice for a firm-fixed-price construction contract to replace the roofing system at the Federal Correctional Complex (FCC) Butner in North Carolina. The project involves the complete removal and disposal of approximately 35,000 square feet of flat EPDM roofing and 27,000 square feet of pitched shingle roofing. The contractor will install a new 80-mil TPO flat roof system with tapered EPS insulation and a 30-year Class A asphalt shingle system on pitched areas, ensuring all penetrations, drains, and flashing are watertight and manufacturer-approved. The estimated project magnitude is between 1,000,000 and 5,000,000 dollars, with an estimated performance period of 637 calendar days. This opportunity is specifically seeking 8(a) contractors under NAICS code 238160, with a small business size standard of 19.0 million dollars in average annual receipts. The awarded prime contractor must provide all labor, materials, and equipment, maintain a 20-year non-prorated watertight warranty, and adhere to NRCA standards and FAR 28.102 for performance and payment bonds. Due to the secure nature of the facility, all personnel must undergo criminal background checks and security clearance investigations, which may take up to 35 days. Interested 8(a) firms must be registered in SAM and respond by adding their names to the Interested Vendors List and submitting a Market Research Questionnaire by October 26, 2026.
Fao

POSTED

about 14 hours ago

DEADLINE

in 6 days

General Info

NAICS

238160 - Roofing Contractors

Place of Performance

ID, 83520, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → US Army Engineer District Walla Wal
Contacts2 people available
OfficeWALLA WALLA, WA, 99362-1876, USA
Office AddressWALLA WALLA, WA, 99362-1876, USA

Full Description

Show more

Dworshak Powerhouse Roof Replacement


Sources Sought Notice: W912EF26RSS05




The US Army Corps of Engineers, Walla Walla District is seeking interested business sources for a construction project entitled: Dworshak Dam Powerhouse Roof Replacement.  The work is located at Dworshak Dam in Ahsahka, Idaho, along the Clearwater River north fork near Orofino, ID.  This will be a firm-fixed-price construction contract. The projected magnitude of construction for this project is between $5,000,000 and $10,000,000. 100% performance and payment bonds will be required.  The expected period of performance will be approximately 300 days in duration for the removal and installation of roofing over the powerhouse (roof A), engineering office (roof B), elevator and stair penthouse (roof C), and circuit breaker gallery and entry (roofs D & E) at Dworshak Dam.  The government expects to award a contract in January 2027, with an approximate on-site installation work window of May 2027 through November 2027.  The North American Industry Classification System (NAICS) code for this project is 238160 – Roofing Contractors and the associated small business size standard is $19.0 million. 



This sources sought notice is a tool to identify businesses with the capability to accomplish the work.  This is not a solicitation. 



Responses to this sources sought notice should include the following information: 



  1. A list of no more than five (5), project examples that were completed in the last 10 years which demonstrate experience in removing and installation roofing material as listed in the Summary Scope of Work. If any of the experience is that of a subcontractor, please specify that information in your response.
     
    1. For each project submitted, provide a brief narrative statement of the work involved, how it relates to the described herein and your firm’s role in the project, the dollar value, and the completion date.
       
    2. Include a statement detailing any special qualifications and certifications, applicable to the scope of this project, held by your firm and/or in-house personnel.



  1. Provide a statement of your firm’s business size status (HUBZone, Service Disabled Veteran Owned, 8(a), small disadvantaged, or woman-owned) with regards to the NAICS code listed above. 


  1. Provide the percentage of work you (as the prime) intend to perform. If you intend to subcontract a major portion of the work (defined as at least 20% of the work), please include this information in your response.


  1. Provide a statement that your firm intends to submit an offer on the project when it is advertised.


  1. Provide a statement of your firm’s bonding capacity.  A statement from your surety is NOT required.


  1. CAGE Code and UEI number.


This sources sought notice is for market research and planning purposes only and is not to be construed as a commitment by the Government to pay for information submitted in response to this request. Respondents will not be notified of the results of the market analysis and debriefings will not be available. It is the reader's responsibility to monitor the Government Point of Entry (GPE) via sam.gov. Contract Opportunities for any resultant or future solicitation package(s) that may be issued.



Submit this information to Preston Jones, Contract Specialist, via email to Preston.E.Jones@usace.army.mil and Jani Long, Contracting Officer, at Jani.C.Long@usace.army.mil.  Your response to this notice must be received on or before 3:00 PM PST on January 7, 2026.




Summary of Scope of Work:



Dworshak Dam



The powerhouse construction was completed in 1975 and includes five low-sloped roof areas totaling approximately 26,200 square feet. The existing single-ply membrane is a 50-mil reinforced acrylonitrile butadiene rubber (NBD) membrane installed over rigid insulation board and vapor retarder. Two roof areas have concrete roof deck, and three roof areas have metal roof deck. The structural integrity of the metal decks appeared sound by visual inspection while walking on the roof and examination from below.



Two roof areas have high voltage electrical equipment that requires all work in those areas to be completed within a predetermined outage period. Additionally, one roof area has a portion of the roof that has microwave telecommunication equipment that requires all work in that area to be completed within two contractor coordinated outage periods.



The scope of the work is to provide a durable waterproofing system for the Dworshak powerhouse and ancillary roofs. This will be achieved by removing the existing roofing system in its entirety down to the structural roof decks, followed by the installation of a new fully adhered roofing assembly to include gypsum roof sheathing, a vapor retarder, polyisocyanurate foam roof insulation, cover board, and 90-mil EPDM membrane. A 2-year installer warranty and a 30-year manufacturer warranty are required.



Fall protection guardrails constructed from fiber-reinforced plastic (FRP) will be installed to the parapet walls of the powerhouse and elevator penthouse roofs to ensure a safe work environment for maintenance personnel conducting preventative maintenance activities on the roofs. 



Fabricated metal stairs will be installed to replace existing ladder access to two roof areas.



The mechanical air conditioning unit for the elevator machine room will be replaced with a new split heat pump system with indoor air handler and outdoor condenser unit.



Roof parapet heights above the parking lot/roadway range from 36 feet high to 75 feet high. Cranes and/or telescopic boom lifts will be necessary to deliver material on to the roof surfaces. High voltage equipment and overhead transmission lines will limit placement and reach of equipment. Demolished materials may be removed using cranes, telescopic boom lifts, or debris chutes.



All on-site work shall be performed in accordance with the Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1).

Establish and manage an effective on-site Safety and Health program in accordance with EM 385-1-1 that will require the development and submission of a comprehensive project specific Accident Prevention Plan for Government acceptance. In addition, develop and submit for Government acceptance Activity Hazard Analyses for each phase of work and a project specific Fall Protection Plan that comply with EM 385-1-1.

A Site Safety and Health Officer (SSHO) employed by the prime contractor is required for each shift of the contractor's on-site operations. The SSHO shall possess a minimum of 5-years’ experience in construction safety on similar projects, shall have completed the 30-Hour OSHA Construction Safety training within the last 5 years, and shall have completed at least 24 hours of safety training from accredited safety training sources each year for the past 5 years.

Establish and manage an effective Contractor Quality Control (CQC) System that will require the development and submission of a comprehensive project specific CQC Plan for Government acceptance. A CQC System Manager employed by the prime contractor is required to be on-site for each shift of the Contractor's operations. The CQC System Manager must possess a minimum of 5 years relevant experience in a supervisory or management position such as Quality Control Manager, Quality Assurance Manager, or Construction Manager directly involved in the management of construction quality at the project site. In addition, the CQC System Manager shall have completed the course entitled “Construction Quality Management for Contractors” within the last 5 years.

Use the Government-furnished Resident Management System (RMS) – Contractor Mode to record, maintain, and submit various information throughout the contract period. RMS is a Windows-based program capable of operating on a stand-alone personal computer or on a network. The Government will make the quality control system (QCS) software available to the Contractor at time of notice to proceed.

The project involves the development and management of Contractor furnished submittals for items such as pre-construction plans, product data, test reports, and contract close-out documentation as required by the technical specifications of the contract.

Miscellaneous work within the project includes the delivery of As-Built Drawings, O&M Manuals, Contractor- Prepared Shop Drawings, and spare parts to the customer.


Contracting Office Address: Attn: CECT-NWW / 201 North 3rd Avenue / Walla Walla, Washington 99362-1876



Place of Performance: USACE – Dworshak Dam, Ahsahka, Idaho

More opportunities from Department Of Defense → US Army Engineer District Walla Wal

Same awarding agency

NAICS: 332812
New
Federal
Dworshak Skeleton Bay Draft Tube Bulkhead Rehabilitation
Solicitation # W912EF27QA002
The US Army Corps of Engineers, Walla Walla District, is soliciting a firm fixed price contract for the rehabilitation of twelve draft tube bulkheads and associated seal keeper bars at Dworshak Dam. This total small business set-aside project requires the contractor to provide all personnel, materials, equipment, and supervision necessary for the pickup, dry-blast cleaning to white metal, weld repair, and new coating application of the bulkheads. The work must be performed in accordance with strict industry standards, including AWS D1.1 for welding and SSPC SP 5 / NACE No. 1 for surface preparation. Deliverables are scheduled across multiple units, with specific return dates such as January 23, 2027, for Unit 4 and April 19, 2027, for Unit 5. The contractor must be a certified SSPC QP 3 painting contractor or hold an AISC Complex Coatings endorsement and provide a third-party certified coatings inspector at the SSPC-PCI Level 2 or NACE CIP Level 2. Quality assurance is paramount, requiring detailed inspection reports for each bulkhead and the use of magnetic flux thickness gages per ASTM D7091. The government reserves the right to conduct quality assurance inspections at the contractor's facility. Proposals are due by October 30, 2026, and will be evaluated based on price and other factors to determine the most advantageous offer. All shipping is required to be FOB destination to the Dworshak Project Office in Ahsahka, Idaho.
Metal Coating, Engraving (except Jewelry and Silverware), and Allied Services to Manufacturers

POSTED

5 days ago

DEADLINE

in 10 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS