Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

E26-00165 NOE

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Napa County Planning, Building, and Environmental Services Department has issued a Notice of Exemption for project E26-00165, which authorizes the installation of a new irrigation well for Double Vee Properties LLC at 1160 Larkmead Lane in St. Helena, California. This project increases the total number of on-site wells from three to four, specifically increasing irrigation wells from two to three following the demolition of a previously utilized well. The installation is designed to maintain current water withdrawal levels without increasing the net site water demand. The new well will support on-site vineyard irrigation and provide water to be hauled for landscaping and vineyard irrigation at 2355 Pickett Road and 825 Fulton Road, including dust control. Additionally, the well serves as a failsafe for emergency conditions such as pump or casing failures and provides a critical water source for smoke mitigation and fire suppression. The project is granted a Categorical Exemption under CEQA Guidelines Section 15303 Class 3 for the construction of small structures, as it is determined to have no significant adverse impact on the environment or groundwater resources. Compliance is further supported by a Water Availability Analysis deemed technically adequate by the Napa County Engineering Division and verification that the site is not listed as a hazardous waste site under Government Code Section 65962.5.

General Info

Napa County authorized Double Vee Properties to install one new irrigation well in St. Helena.

Agency

California → Napa County

Place of Performance

Larkmead Lane and State Highway 29, St. Helena, CA, 94559

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Napa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Napa County
Office AddressN/A
Contacts
Dana Eleanor MorrisonSupervising Planner - Conservation

Full Description

Show more
Larkmead Lane Groundwater Permit Notice of Exemption, permit number E26-00195. The project is a request for a ground water permit to allow for the installation of a new irrigation well to be incorporated into the existing water system at 1160 Larkmead Lane. Installation of the proposed well would increase the total number of on-site wells from three to four (i.e., increasing from two to three wells for irrigation, as one previously utilized well has been demolished) without increasing the quantity of water withdrawn or applied for beneficial use. Water from the irrigation wells would continue to be used for vineyard irrigation on-site and hauled for vineyard and landscaping irrigation to a property located at 2355 Pickett Road and to a property located at 825 Fulton Road for dust control. There are no additional proposed water demands at the project site, Pickett site, or Fulton site with construction of the proposed irrigation well and the new well would not result in a net increase in site water demand. The pre-existing well would continue to provide supplemental water, as a back-up supply, to both Pickett and Fulton, non-contiguous properties, as has historically been implemented to maximize the efficient use of water subject to availability. Additionally, the proposed well would provide a source of failsafe water in the event of quasi emergency conditions (e.g., pump failure, casing issues), and vice versa, and also provide an additional source of water for potential fire suppression and smoke mitigation.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business set-asides, including Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone certified firms. Interested parties must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer infrastructure improvements, including the open cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter, as well as 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include the installation of standard and doghouse manholes, interior drop assemblies, and the completion of the CSO regulator fit out and outfall. Site preparation tasks consist of clearing and grubbing over 5,100 square yards of wooded areas, seeding, fine grading, and select tree removal. Key project deliverables also include the implementation of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the maintenance of flows and bypass for all pipes and manholes. Specialized requirements include the procurement of railroad insurance.
Cleary Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, identified as Project No. SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the Notice to Proceed. The contract is administered by the City of Belmont with Willis Engineers serving as the representative. Award will be granted to the responsible bidder submitting the lowest responsive bid, with specific evaluation criteria focusing on bidder qualifications, financial ability, and the submission of required Good Faith Efforts and Table A forms. The project mandates strict adherence to ANSI/AWWA and ASTM standards for materials and requires performance and payment bonds. Additionally, the contract establishes socioeconomic participation goals, including an EPA MBE goal of 10.9 percent and a combined State of North Carolina MBE/WBE goal of 10 percent. Payment is processed via Applications for Payment and becomes due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking qualified DBE, MBE, WBE, and SBE subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of open and covered concrete structures, relining or replacing steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additional technical requirements include the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to electrical and instrumentation systems, motor control center component replacement, and modifications to sluice and slide gates. The project also encompasses the installation of access platforms, rerouting sump pump discharge lines, excavation, trench work, and surveying. This solicitation is set aside for small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of bid for reimbursement. Requested services and supplies include lead abatement, rebar, metals fabrication, painting, trucking, concrete resurfacing, and FRP reinforcing systems. Quotes are due by November 17, 2026, with the final bid date set for November 18, 2026.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS