Eagan Gymnasium Flooring Resurface

Open
25-0273-PRState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Florissant, Missouri, is soliciting sealed bids from qualified flooring contractors to sand, refinish, and repaint the wood gymnasium floor at the James J. Eagan Civic Center. The scope of work includes mechanical sanding, minor repairs to water-damaged areas, and the application of a commercial-grade finishing system. A critical component of the project is the layout and painting of eight game-line configurations for basketball, volleyball, and pickleball across three courts, using specific colors for each sport. Additionally, the contractor must replace the gymnasium base and install new aluminum door thresholds. The project is scheduled to begin on February 8, 2027, with final cleanup and inspection completed by March 19, 2027, though this timeline may be adjusted due to phased ceiling work. The contract will be awarded to the lowest qualified bidder based on a firm lump-sum base bid. Bidders must provide a detailed project schedule, warranty information, and evidence of comparable experience. Key compliance requirements include the submission of a performance bond within two weeks of the executed contract, adherence to State of Missouri labor provisions and prevailing wage rates, and verification of E-Verify participation. Contractors must also provide certified payrolls with monthly billing and certify that they are not engaging in a boycott of the State of Israel. Final acceptance is contingent upon a successful walkthrough with the City, the removal of all debris, and the submission of all closeout documentation.

General Info

Bids for sanding, refinishing, and painting the James J. Eagan Civic Center gym.

Place of Performance

MO, USA

Set-Aside

NONE

Documents

10
DOC, High priority: read this firstcontract-document
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High
PDF, High priority: read this first7 pages · instructions-to-bidders
High
PDF, High priority: read this firstwage-determination
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first1 page · wage-determination
High
PDF, Low priority2 pages · certification
Low
PDF, Low priority1 page · affidavit
Low
PNG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyMissouri → Parks and Recreation
Contacts2 people available
OfficeFlorissant, MO, 63031, USA
Office AddressFlorissant, MO, 63031, USA
Contacts
Jimmy KirincichDirector of Parks and Recreation
Melanie BringerPurchasing

Interested Companies (2)

ePlanColumbia, MO
The Builders, a chapter of the AGCJefferson City, MO

Full Description

Show more
General work description: The City of Florissant, Missouri, is soliciting sealed bids from qualified flooring contractors to sand, refinish, and repaint the existing wood gymnasium floor at the James J. Eagan Civic Center. The project shall include the preparation and refinishing of the existing gymnasium floor, necessary minor repairs, installation of new gymnasium base and door thresholds, and the layout and painting of basketball, volleyball, and pickleball game lines on all three courts. All work shall be completed by qualified personnel experienced in commercial gymnasium flooring systems and athletic court finishes. Site Location: James J. Eagan Civic Center 1 James J. Eagan Drive Florissant, MO 63033 Site Visits: Contact: Jimmy Kirincich Director of Parks and Recreation Phone: +1 (555) 000-0000 Email: contact@example.gov SCOPE OF WORK: The successful contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, and incidentals necessary to complete the following work. A. Floor Preparation and Sanding Inspect the existing gymnasium floor and identify visible damage, worn finish, water-damaged areas, loose boards, and other conditions that may affect the project. Mechanically sand the existing wood gymnasium floor to remove the existing finish and prepare the surface for refinishing. Complete the sanding process in a manner that produces a uniform surface suitable for application of a new gymnasium floor finish. Perform minor surface preparation necessary to achieve a professional finished product. Remove sanding dust and debris generated by the contractor's work before applying finish materials. Notify the City of any significant concealed damage, deterioration, or repairs beyond the anticipated scope before proceeding with additional work. B. Floor Repairs Include replacement or repair of one damaged individual floorboard. Include repair of one approximately 1-foot-by-4-foot water-damaged floor area. Use replacement materials compatible with the existing wood flooring system, thickness, species, and appearance to the extent reasonably available. Ensure repaired areas are securely installed, properly sanded, and finished to blend with the surrounding floor. Identify any additional repairs required beyond the included work and provide separate pricing for such repairs before authorization by the City. C. Floor Finishing and Protective Coating Apply a complete gymnasium floor finishing system appropriate for an athletic wood floor. Provide a durable, uniform finish designed for indoor athletic use, including basketball, volleyball, and pickleball. Use commercial-grade materials specifically intended for gymnasium floors and compatible with the existing wood flooring. Apply all sealers, stains, finish coats, and other materials in accordance with the manufacturer's written instructions. Coordinate the application of game lines with the finishing process to ensure proper adhesion, appearance, and durability. Allow sufficient curing time before reopening the gymnasium for use. Provide the City with product data sheets, maintenance instructions, and recommended cure times for all finish materials. Color of stain should be approved by the city prior to purchasing. The contractor shall identify the proposed finish manufacturer, product name, application system, and number of coats in the bid submission. D. Athletic Game Lines — All Three Courts The contractor shall lay out and paint new game lines for on each of the three gymnasium courts, for a total of eight court layouts. Basketball: One complete basketball game-line layout on each of the three courts. Volleyball: One complete volleyball game-line layout on two of the courts. Pickleball: One complete pickleball game-line layout on each of the three courts. All game lines shall be measured, laid out, and painted in accordance with the applicable sport dimensions and the City's approved layout. Sport Color Finish Basketball Black Standard, High Contract Volleyball Royal Blue Medium-Dark Blue Pickleball Green Medium-to-Dark Green The contractor shall: Verify existing court dimensions and field conditions before beginning work. Confirm all court layouts and line colors with the City before applying paint. Use commercial-grade, gymnasium-compatible line paint that is compatible with the specified floor finish. Apply clean, straight, clearly defined lines with consistent widths and no excessive bleeding, overspray, or irregular edges. Ensure that all lines are properly incorporated into the floor finishing system. Provide a proposed line-color schedule and court-layout drawing for City approval before painting. Ensure that the completed layouts provide clear differentiation between basketball, volleyball, and pickleball markings. No game lines shall be painted until the City has approved the proposed layout and colors in writing. E. Gymnasium Base and Door Thresholds Remove and replace existing gymnasium base as necessary to accommodate the refinishing project. Furnish and install new vented gymnasium base compatible with the existing floor system and facility conditions. Furnish and install new aluminum thresholds at all gymnasium doorways included in the project. Ensure the base and thresholds are securely installed, properly aligned, and free of sharp edges or trip hazards. Coordinate installation with the floor sanding and finishing process to prevent damage to newly finished surfaces. F. Final Cleaning and Project Closeout Remove contractor-generated debris, unused materials, and equipment from the work area. Leave the gymnasium floor and immediate work area clean and ready for City inspection. Provide written confirmation of the date the floor may safely be walked on and the date it may be returned to full athletic use. Provide all finish product information, warranties, care instructions, and maintenance recommendations. Complete a final walkthrough with the City's designated representative and correct deficiencies identified during the inspection. MATERIALS AND WORKMANSHIP All materials shall be new, commercial-grade products specifically designed for use on indoor athletic wood flooring. All work shall be performed in accordance with the flooring and finish manufacturers' written requirements and applicable industry standards. The contractor shall be responsible for protecting existing walls, doors, equipment, bleachers, and other facility components from damage caused by the work. Any damage caused by the contractor shall be repaired at the contractor's expense. Substitutions of specified or proposed materials shall require prior written approval from the City. SITE INSPECTION AND EXISTING CONDITIONS Bidders shall inspect the gymnasium before submitting a bid to evaluate the existing flooring, court layouts, access, doorways, base, and general project conditions. Bidders shall verify all measurements and quantities necessary to prepare an accurate proposal. Any dimensions or quantities provided by the City are for bidding purposes and shall be field-verified by the contractor. Questions regarding existing conditions or the scope of work shall be submitted to the City through Opengov bid questions before the bid deadline. PROJECT SCHEDULE AND FACILITY COORDINATION The contractor shall provide a proposed project schedule identifying the anticipated start date, duration of work, finishing and curing periods, and expected completion date. All work shall be coordinated with the City's Parks and Recreation Department. The contractor shall not begin work until authorized by the City and shall not reopen the gymnasium for athletic use until the finish manufacturer's required curing period has been satisfied and the City has approved the completed work. Any proposed work outside the City's approved schedule must receive prior written authorization. Timeline: The contractor shall complete all work within the following project period: Start Date: February 8, 2027 Final Cleanup and Inspection: Completed by March 19, 2027 Time frames are subject to change due to this being a phased project with ceiling removal and painting prior to flooring resurface. Contractor should include their own estimated project timeline with bid BID SUBMISSION REQUIREMENTS Bidders shall provide the following information: Total lump-sum price for completion of the base bid scope- See electronic pricing table. Manufacturer and product information for all proposed finish and line-paint materials. Proposed project schedule and estimated duration. List of exclusions, assumptions, and anticipated additional costs, if any. Description of warranty coverage for labor, materials, finish, and painted game lines. Relevant experience completing comparable gymnasium flooring projects. References for similar completed projects. Confirmation that the bidder has inspected the site or understands the site-inspection requirements. Performance bond is required within two week of fully executed contract. Any work necessary to complete the stated scope shall be included in the base bid unless specifically identified as an exclusion and accepted by the City in writing. PRICING AND ALTERNATES Bidders shall provide a firm lump-sum base bid for all work described in this document. Any additional repairs, major floor preparation, or work outside the base scope shall be listed separately with unit prices or a not-to-exceed amount, as applicable. Additional work shall not proceed without written authorization from the City. The City reserves the right to accept or reject proposed alternates and to award the project in accordance with applicable City procurement requirements. WARRANTY The contractor shall provide written warranty information covering workmanship, finish application, and game-line adhesion and durability. The bid shall identify the duration of each warranty, the conditions covered, exclusions, and the process for requesting warranty service. FINAL ACCEPTANCE The project shall be considered complete upon satisfactory completion of all specified work, removal of contractor-generated debris, submission of required closeout documentation, and written acceptance by the City of Florissant. The City reserves the right to identify and require correction of incomplete work, defects, or deficiencies that do not conform to the approved scope and specifications. GENERAL CONDITIONS The contractor shall comply with all applicable federal, state, and local laws, codes, and regulations. The contractor shall maintain a safe and orderly work area throughout the project. The contractor shall be responsible for its employees, subcontractors, equipment, and materials. No additional work or charges shall be incurred without prior written approval from the City. The City reserves the right to reject any or all bids and to waive informalities in accordance with applicable procurement requirements. Alternates-Logo Installation: See attachments for logo The Contractor shall provide separate lump-sum pricing for the following: Alternate 1: Installation of an approximately 8-foot diameter City of Florissant center-court logo. Alternate 2: Installation of an approximately 10-foot diameter City of Florissant center-court logo. Pricing shall include all labor, materials, equipment, layout, painting, surface preparation, and protective finish associated with the completed logo installation.

Similar Contracts

Same NAICS industry code

NAICS: 238330
New
SLED
Replacement of Gym Floor at Elizabeth Shelton School
Solicitation # 2027-12
The City of Shelton is soliciting competitive bids for the replacement of the gymnasium floor at Elizabeth Shelton School, located at 138 Willoughby Road, Shelton, CT. The scope of work involves the complete demolition and replacement of the existing floor, with a preference for an alternative system to hardwood, such as a pad and pour polyurethane system. The project includes the abatement of asbestos-containing materials if present and requires the provision of manufacturer and workmanship warranties upon completion. The contract will be awarded to the lowest responsible firm based on a combination of fee, experience, qualifications, and the ability to perform work safely and in accordance with applicable laws. Bids must be submitted through the City's e-Procurement portal by 11:00 am on December 4, 2026. Requirements for the selected contractor include the provision of performance and payment bonds, evidence of insurance, and compliance with prevailing wage schedules and 49 CFR 29, Subpart C. Additionally, the contractor must adhere to non-discrimination and affirmative action provisions, make good faith efforts to employ minority business enterprises, and ensure all personnel undergo background checks by the Shelton Police Department. The City reserves the right to terminate the contract for convenience or in the event of non-appropriation of funds.
Board of Education

POSTED

about 15 hours ago

DEADLINE

in 28 days
View Details

More opportunities from Missouri → Parks and Recreation

Same awarding agency

NAICS: 238320
New
SLED
Eagan Civic Center Gymnasium Painting
Solicitation # 25-0272-PR
The City of Florissant is seeking a qualified painting contractor for solicitation 25-0272-PR to repaint the gymnasium at the James J. Eagan Civic Center. The project involves painting the ceiling black and applying a base color to the walls, complemented by three accent color stripes and an optional 12-foot by 12-foot Parks and Recreation logo. The scope includes comprehensive site preparation, the use of commercial-grade washable paints, and the implementation of floor protection using 3/4 inch plywood for equipment. Work is scheduled to begin on January 18, 2027, with final cleanup by February 5 and total completion by February 8, 2027. The contract will be awarded to the lowest qualified bidder based on a weighted evaluation of pricing, technical capability, schedule, scope accuracy, and warranty. Awardees must provide a performance bond from a Missouri-authorized surety, comply with state and federal prevailing wage rates, and maintain required insurance naming the City of Florissant as an additional insured. Bidders must also submit an E-Verify work authorization affidavit and certify compliance with the Anti-Discrimination Against Israel Act. Payment terms are net 30, with invoices submitted to the Department of Finance accompanied by certified payrolls. Final acceptance is contingent upon a City inspection to ensure the work is free of defects and meets all specified quality standards.
Painting and Wall Covering Contractors

POSTED

3 days ago

DEADLINE

in 18 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement