Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Amendment 0004 - Eaker Center Electrical Outlets RFQ

Closed
FA330026Q7592Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

Solicitation FA330026Q7592 is a firm-fixed-price contract for the installation of new electrical outlets at the Ira C. Eaker Center for Leadership Development (Building G832) at Maxwell AFB, Gunter Annex, Alabama. The project requires the installation of fifteen 120-volt quad receptacles, consisting of five wall-mounted and ten flush floor-mounted brass units, across eight locations including various seminar rooms and the open area next to Room 125. The work is intended to support instructional electronics and must comply with the National Electrical Code, OSHA safety standards, and Department of the Air Force requirements. The magnitude of construction is estimated between $25,000 and $100,000, with labor rates governed by Davis-Bacon Act wage determination AL20260093. This procurement is a 100% Total Small Business Set-Aside under NAICS 238210, limited to small businesses within a 250-mile radius of the performance location. Award will be based on technical acceptability and price, utilizing a pass/fail evaluation of the offeror's technical solution. Interested parties must be active in the System for Award Management and submit signed quotes on company letterhead to the designated contracting officials by 12:00 PM CST on September 25, 2026. The contractor is responsible for all labor, materials, and testing to ensure proper grounding and polarity, with a performance timeline generally ranging from seven to 37 calendar days depending on the specific statement of work version. Invoicing must be processed through the Wide Area WorkFlow system.

General Info

Small business contract for installing electrical outlets at Maxwell AFB, Alabama.

NAICS

238210 - Electrical Contractors and Other Wiring Installation Contractors

Place of Performance

Montgomery, AL, 36112, USA

Set-Aside

SBA

Documents

16

Attachment 4 - G832 Reference Room Photos

DOCX, High priority: read this firstspecifications
High

FA330026Q7592 Electrical Outlets G832

PDF, High priority: read this first5 pages · rfq
High

FA330026Q7592 - Electrical Outlets G832 (Amended 0005)

PDF, High priority: read this firstrfq
High

FA330026Q7592 - Electrical Outlets G832 (Amendment 0002)

PDF, High priority: read this firstrfq
High

FA330026Q7592 Electrical Outlets RFQ

PDF, High priority: read this first4 pages · rfq
High

G832 Left Side of the BLDG Electrical Guide - 6A Condominium Platform One

PDF, High priority: read this firstspecifications
High

G832 Provisions and Clauses

PDF, High priority: read this firstprovisions-and-clauses
High

G832 Right Side of the BLDG Electrical Guide

PDF, High priority: read this firstspecifications
High

Map of 832 April 2026 w electrical closets

PDF, High priority: read this firstspecifications
High

SOW - Electrical Outlet Install BLDG 832 (Amended)

PDF, High priority: read this firstsow
High

SOW - Electrical Outlet Install BLDG 832 (Amended 2.0)

PDF, High priority: read this firstsow
High

SOW Electrical Outlet Install BLDG 832 (Amended 3.0)

PDF, High priority: read this first9 pages · sow
High

SOW – Electrical Outlet Install, Bldg 832 (G832)

PDF, High priority: read this firstsow
High

WD2015-4607 Alabama Wage Determination No. 2015-4607

PDF, High priority: read this firstwage-determination
High

WGD AL20260093 Wage Determination - Building

PDF, High priority: read this first5 pages · wage-determination
High

Eaker+Center+Electrical+Outlets++-+Combined+Synopsis_Solicitation-+Final+20260904.cfb

X-CFB

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

7 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice title changed. The notice description changed.

Notice updated

Response deadline changed from Sep 15, 2026 to Sep 18, 2026. The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Sep 18, 2026 to Sep 24, 2026.

Notice updated

Response deadline changed from Sep 24, 2026 to Sep 25, 2026. The notice title changed. The notice description changed.

Notice updated

Response deadline time changed from 5:00 PM UTC to 9:00 PM UTC on Sep 25, 2026. The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3300 42 Cons Cc
Contacts2 people available
OfficeMAXWELL AFB, AL, 36112-6334, USA
Office AddressMAXWELL AFB, AL, 36112-6334, USA

Full Description

Show more

This project involves the installation of new electrical outlets in eight (8) locations. Rooms 125, 128, 140, Seminar Rooms 1-4 and the open area next to Room 125 in building G832. The purpose of these outlets is to support instructional activities by providing reliable power sources for classroom electronics, including laptops, projectors, document cameras, and other teaching equipment.


This solicitation will be issued as a 100% Total Small Business set-aside and made available on the System for Award Management (SAM) website at https://sam.gov.  Please, note that this requirement will be limited to Small Businesses within a 250 mile radius of the work performance location, and potential offerors will be required to respond to the attached statement of work (SOW).  There will be no amount charged for solicitation documents and respondents will not be reimbursed for any costs incurred in responding to official solicitation.  It is the responsibility of the interested parties to review this site frequently for any updates/amendments to any and all documents.


The resultant contract shall be resultant of the Total Small Business Set-Aside Socioeconomic Program.  The magnitude of construction is between $25,000 and $100,000 IAW Federal Acquisition Regulation (FAR) 36.204 – Disclosure of the magnitude of construction projects.  The applicable wage rate for this project is Davis-Bacon Act WD# AL20260093 (BUILDING).  See Attachment 8.


Quotes are due 25 Sep 2026 at 12:00PM CST.


Amendment 0004 -


- Combo Synopsis Solicitation Amended 2.0 20260924


- Attachment 8 - WGD AL20260093 Building


Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS