Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Subcontract opportunity from Department Of The Interior was posted on September 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Earthwork and Site Preparation

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
South Operation Center (SOC) Digester Demolition
Solicitation # 26-114
Solicitation 26-114 is an Invitation For Bid issued by the City of Naperville for the South Operation Center (SOC) Digester Demolition. The project involves the demolition and removal of an abandoned digester located at 1800 S. Washington Street, including the filling of the excavation, site restoration, ancillary landscaping, and the installation of security fencing. The scope also requires the identification, handling, and legal off-site disposal of special waste, such as contaminated soil and construction debris, with specific requirements for the packaging and transportation of asbestos-containing materials. The contract will be awarded to the lowest responsible bidder based on criteria including technical capacity, integrity, past performance, and financial resources. The work must be completed by December 31, 2027, with construction operations limited to Monday through Friday from 7:00 a.m. to 4:00 p.m. A contingency allowance of $25,000 is provided for unforeseen work, while failure to achieve final completion is subject to liquidated damages of $250 per calendar day. The contractor is required to provide performance and payment bonds equal to the contract price and must comply with the State of Illinois Prevailing Wage Act and 2010 ADA Standards. Bids must be submitted electronically by December 11, 2026, and include a bid deposit equal to 10% of the total bid. All work must adhere to standards set by IDOT, the City of Naperville, ISPE, FHWA, AASHTO, ANSI, NEMA, and CFR 29 Part 1910.
Public Utilities (Water) | DPU-W

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 238910
New
Federal
Karup, Denmark DABS-FEV Laydown Site Construction
Solicitation # W912GB27RA010
The United States Army Corps of Engineers Europe District is seeking a Firm-Fixed-Price construction contract to establish a new laydown area at Karup Air Base in Denmark. This Design-Bid-Build project aims to support Base Expeditionary Airfield Resources for the beddown of 550 personnel using Deployable Air Base System sets, specifically the Alaska Small Shelter System. The scope of work includes the construction of a gravel bed covering approximately 30,957 square meters, concrete pads for various shelters, and necessary site improvements. The facility will accommodate 72 billet shelters, as well as specialized shelters for latrines, showers, laundry, a 550-person kitchen, command operations, and morale, welfare, and recreation. The project involves specific utility requirements, where domestic water and wastewater extensions will be handled by a host-nation-directed sole-source local contractor, while electrical power will be provided via DABS generator sets rather than a utility grid. The anticipated contract value is between $1 million and $5 million, with a construction duration of 365 calendar days starting around late September 2027. This is an unrestricted, full and open competitive procurement using a best-value approach, selecting the highest technically rated proposal that offers a fair and reasonable price. Interested offerors must be authorized to perform construction work in Denmark, maintain active SAM registration, and satisfy all bonding and permitting requirements.
W2SD Endist Europe

POSTED

about 6 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

This subcontract for Earthwork and Site Preparation involves providing excavation, grading, and hauling services for prime contractors on National Park Service projects located at Bryce Canyon National Park. The scope of work includes clearing, grubbing, and excavation for retaining wall footings, as well as grading for sidewalk and ramp areas using specialized equipment such as excavators, dozers, and graders. The final objective is to deliver a fully graded and excavated site that is ready for concrete placement. Managed by the Dsc Contracting Services Division under the Department of the Interior, the project falls under NAICS code 238910. All work must be performed in strict compliance with Utah permitting requirements. The solicitation was posted on September 18, 2026, with a response deadline of October 19, 2026.

General Info

Earthwork and site preparation subcontract for National Park Service projects at Bryce Canyon.

NAICS

238910 - Site Preparation Contractors

Place of Performance

CO

Set-Aside

NONE

Documents

This scope was carved out of 140P2026R0065.

The full solicitation package (17 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Z--BRCA 310427 Southbound Shuttle Stop

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Dsc Contracting Services Division
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs excavation, grading, and hauling for prime contractors on National Park Service projects at Bryce Canyon National Park. Executes clearing, grubbing, and excavation for retaining wall footings and grading for sidewalk and ramp areas using excavators, dozers, and graders. Requires compliance with Utah permitting. Delivers a graded and excavated site ready for concrete placement.

More opportunities from Department Of The Interior → Dsc Contracting Services Division

Same awarding agency

NAICS: 237990
New
Federal
Y--Timucuan Ecological and Historic Preserve TIMU-335
Solicitation # 140P2026R0081
Solicitation 140P2026R0081 is a Small Business Set-Aside, Firm-Fixed-Price contract issued by the National Park Service for the stabilization of the Kingsley Plantation shoreline at the Timucuan Ecological and Historic Preserve in Jacksonville, Florida. The project, estimated between $1 million and $5 million, involves repairing and extending a seawall damaged by Hurricane Ian. The scope of work includes selective demolition, the installation of a new weatherable rigid vinyl sheet pile wall with tie rods and deadman walls, the addition of a structural FRP composite sheet pile wall extension to the east, and various civil works such as excavation, limestone riprap installation, and spartina sea grass restoration. The mandatory performance period is 259 calendar days, with work required to begin within 10 days of award. Award selection will be based on the Best Value Continuum Tradeoff Process, where non-price factors—including technical approach, schedule, management approach, safety, project experience, key personnel experience, and past performance—are combined to be significantly more important than price. Due to the sensitive location, the contractor must adhere to strict environmental protection procedures to protect marine mammals, sea turtles, and endangered species, and must comply with the Marine Mammal Protection Act and the Endangered Species Act. Key personnel requirements include a Project Manager, Job Site Superintendent, Quality Control Manager, and Safety Manager. Invoicing is processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform, requiring a signed cover letter from the Contracting Officer's Representative.
Other Heavy and Civil Engineering Construction

POSTED

about 6 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237110
New
Federal
Y--HAVO 326181 Rehabilitate Rainshed&Water Treatment
Solicitation # 140P2026R0091
Solicitation 140P2026R0091 is a firm-fixed-price construction project issued by the National Park Service Denver Service Center to rehabilitate the Rainshed and Water Treatment System at Hawaii Volcanoes National Park. The primary scope of work includes rehabilitating the park's rainwater catchment and water treatment infrastructure, replacing Building 43 with a new metal building, and replacing Building 241 with a new open-air and CMU structure. The project also includes several optional line items, such as replacing the perimeter fence and ground catchment pavement. The performance period is 610 calendar days, with a scheduled window from November 1, 2026, to July 3, 2028. The government will award the contract using a best value tradeoff process, evaluating technical approach, management approach, construction schedule, past performance, and proposed pricing. Key requirements include compliance with the Davis-Bacon Act for prevailing wages, Buy American Act and Build America Buy America standards, and the submission of bid, performance, and payment bonds. Technical specifications cover a wide range of disciplines, including civil, structural, electrical, and mechanical engineering, with specific mandates for ADA compliance and the use of at least 10 percent recycled content by cost. Invoicing must be processed electronically through the Invoice Processing Platform with required documentation including a signed COR cover letter and current construction schedules.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 14 days
View Details
NAICS: 237110
Federal
Y--GRTE 237343 - Rehab 4 Lazy F Ranch
Solicitation # 140P2026R0098
Solicitation 140P2026R0098 is a Total Small Business Set-Aside for the rehabilitation of the historic 4 Lazy F Ranch in Grand Teton National Park, Wyoming. The project scope involves extensive structural, utility, and preservation work on one lodge, eight cabins, one garage, two outbuildings, and a water well structure to convert them into employee housing. Key technical requirements include the installation of a new sanitary sewer collection system, lift station, and water distribution for domestic and fire service, as well as the expansion of the parking lot to include ADA spaces. The project is estimated to have a construction magnitude exceeding 10 million dollars, with a base performance period of 303 calendar days, potentially extending to 669 days depending on the selected CLINs. The government will award the contract using the Best Value Continuum Tradeoff Process, evaluating proposals based on technical approach, project experience, schedule, and past performance, with non-price factors being equally important to price. Contractors must adhere to strict environmental and safety regulations, including potential seasonal closures from February 1 to August 15 for bald eagle nesting and protections for roosting bats. Additionally, the project requires the management of hazardous materials, as surveys have identified potential asbestos and lead-based paint across the facilities. Proposals must be submitted electronically to the Contracting Officer, Tony Jasper, by the specified deadline, and the successful bidder will be required to provide bid, performance, and payment bonds.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 14 days
View Details
NAICS: 221320
Federal
Y--GRCA 257282 - Replace Wastewater Plant at South Ri
Solicitation # 140P2026R0101
Solicitation 140P2026R0101 is an unrestricted full and open competition Invitation for Bid issued by the National Park Service, DSC Contracting Services Division, for the replacement of the South Rim Wastewater Treatment Plant at Grand Canyon National Park, Arizona. The project involves the construction of a GD Membrane Bio-Reactor wastewater treatment plant, including new treatment facilities, administrative and support buildings, and process systems. The scope of work encompasses complete demolition and removal of existing infrastructure, site preparation, grading, paving, fencing, and improvements to the facility access road. A critical requirement is that the existing plant must remain in permitted operation until the new facility is accepted by the government, and the contractor must provide a 12-month operational support period. The contract is a firm-fixed-price acquisition with a magnitude exceeding 100 million dollars. The mandatory period of performance is 1095 calendar days, scheduled from February 1, 2027, to February 1, 2030. Award will be based on a multi-factor, best-value tradeoff process evaluating technical experience, technical approach, key personnel experience, and price. Required deliverables include a detailed commissioning plan covering startup sequencing, operator training, and regulatory coordination. The contractor must furnish performance and payment bonds and comply with union prevailing wage rates, Department of the Interior cybersecurity requirements, and ADA/ABA accessibility standards.
Sewage Treatment Facilities

POSTED

9 days ago

DEADLINE

in 12 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS