East County Service Center

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Contra Costa County is proposing the construction of the East County Service Center, a centralized facility located on a 7.86-acre site at Technology Way and Brentwood Boulevard in Brentwood, California. The project features a three-story, 120,000 gross square foot building with a maximum height of 58 feet, designed to house approximately 10 County departments and support 441 employees. The structure will utilize a mass timber super structure with glass-fiber reinforced concrete exterior siding and is targeting a minimum of LEED Silver certification. Key sustainable features include a fully electric design, a rooftop photovoltaic system connected to a 688-kilowatt battery back-up system, and a hybrid HVAC system combining a heat pump with approximately 60 geothermal wells. The site development includes 409 parking stalls, 108 EV-capable spaces, and 58 bicycle parking spaces, along with a public plaza, stormwater treatment basins, and a 180-foot passenger drop-off zone. Infrastructure improvements involve significant concrete and asphalt paving and modifications to the vehicular circulation system at Brentwood Boulevard and Business Center Drive to comply with City standards. Construction is anticipated to span from early 2026 to the end of 2027, divided into six phases ranging from site mobilization and rough grading to final architectural coatings. The project is subject to strict environmental and cultural compliance under the California Environmental Quality Act. All construction personnel must undergo Cultural Awareness Training, and the contract includes a standard inadvertent discovery clause requiring the immediate cessation of work within a 100-foot radius if archaeological or Tribal cultural resources are uncovered. Additionally, the project requires a burrowing owl relocation plan approved by the CDFW at least 30 days prior to ground-disturbing activities and mandates 24-hour OSHA training certifications for safety.

General Info

Contra Costa County will build a sustainable 120,000 square foot service center in Brentwood.

Agency

California → Contra Costa County

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Technology Way south of Sand Creek Road, between Business Circle Drive and Brentwood Boulevard, Brentwood, CA, 94513

Set-Aside

NONE

Documents

(4)

CP#25-39 East County Service Center Initial Study/Mitigated Negative Declaration

PDFenvironmental-assessment

CP#25-39 East County Service Center SCH Summary Form

PDFenvironmental-summary

CP#25-39 Notice of Intent to Adopt Mitigated Negative Declaration for East County Service Center

PDFnotice-of-intent

CP#25-39 East County Service Center Notice of Completion

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Contra Costa County
Office AddressN/A
Contacts
Shravan SundaramEnvironmental Analyst
Syd SotoodehSenior Planner

Full Description

Show more
The County proposes construction of a new East County Service Center (proposed project) at Technology Way and Brentwood Boulevard in the city of Brentwood, East Contra Costa County (see Figure 1). The project site is a flat, grassy undeveloped lot with no trees, buildings, or utilities. A gravel staging area exists in the northwest portion of the project site. The new facility would house multiple County departments and provide a centralized service center for residents of East Contra Costa County, which is one of the fastest-growing regions within the county. The new three-story building would provide approximately 120,000 gross square feet of usable space and have a maximum height of approximately 58 feet, including the mechanical penthouse and mechanical roof equipment (see Figures 2 and 3). The building would include a lobby area, administrative offices for approximately 10 County departments, conference rooms, building support rooms, and other amenities. There will be two main entrances to the lobby area: one for the public and one for staff only. Additionally, there will be four entrances on the side of the building: two for the public and two for staff only. Sixteen restrooms are proposed, including 6 for the public and 10 for staff use. Two public elevators, two staff-only elevators, and three stair towers (one with roof access) would provide access to the upper floors. One open staircase would lead from the main lobby to the second-level lobby area. The on-site staff would have access to the roof terraces on the second and third levels; the terraces would have a pedestal paver system. Table 1-1 provides an overview of the proposed project. Table 1-1: Proposed Project Overview Feature-Overview Project Site: 7.86 acres at Technology Way and Brentwood Boulevard in the City of Brentwood Building Gross Square Footage: 120,000 Gross Square Feet Building Height: 3 stories. Approximate 58 feet high, including the mechanical penthouse and mechanical roof equipment Employees: Approximately 441 County Staff Members Vehicular Parking: 409 parking stalls (286 for staff, 79 for visitors, and 44 for fleet vehicles) Bicycle Parking: 58 spaces (22 long-term spaces and 36 short-term spaces) Sustainability: Leadership in Energy and Environmental Design (LEED) Silver rating, at a minimum The building is designed with a mass timber super structure and with glass-fiber reinforced concrete exterior siding. There is a glass curtain wall system in prime locations on the building façade for enhanced natural light and views, supplemented by punched windows in all other locations. The project will employ metal panel cladding siding in a few locations with metal fin architectural accents: this vocabulary complements other modern County buildings. The proposed project would be fully electric and includes a rooftop photovoltaic system to supply on-site renewable energy. The photovoltaic system would be connected to an approximately 688-kilowatt battery back-up system. The battery back-up system would be located in the vehicle parking area south of the proposed building. In addition, the proposed building would include a hybrid heating, ventilation, and air-conditioning (HVAC) system consisting of both a geothermal system and a heat pump. The geothermal system would include approximately 60 wells which would be drilled down to a maximum of 400 feet. The wells would contain HVAC piping that carries fluid to depth for heat transfer with the ground, allowing for energy efficient heating and cooling. The pumphouse would be located west of the proposed building and the wells would be located throughout the vehicle parking areas. The heat pump would be located on the roof of the proposed building. The proposed project would achieve, at a minimum, a Leadership in Energy and Environmental Design (LEED) Silver rating. The project site would be developed with stormwater treatment basins, pedestrian walkways, and a public plaza along the north façade that would wrap around the corner entry. These treatment features are expected to decrease the rate and volume of stormwater runoff. A trellis or gazebo would be provided for outdoor functions. A covered area outside the conference rooms would be located at the east end of the building. There would be a 180-foot passenger drop-off zone with permeable pavers running parallel to the public plaza on the north side of the building adjacent to a secure child play area. An approximately 8-foot-tall fence would be installed along the perimeter of the staff and fleet vehicle parking areas and at the east end of the building. Regarding site improvements, the proposed project would include approximately 43,000 square feet of concrete paving, 10,000 square feet of sidewalk, and 1,200 linear feet of curbing. Regarding roadways and parking, the proposed project would include approximately 160,000 square feet of asphalt concrete paving, 11,000 linear feet of concrete curbing, and 500 square feet of permeable pavers. A planned public plaza and right-of-way planting would require approximately 42,000 square feet of paving. Landscaping is planned for approximately 28,000 square feet of the project site. New plantings would include a mix of native, drought-tolerant plants. There are currently no trees on the project site; thus, the proposed project would not require the removal of any trees. Access and Parking The East County Service Center would be accessed by the public from Technology Way, with staff-only gated entrances on Business Center Drive and Brentwood Boulevard. The proposed project would include approximately 409 parking stalls, with 286 stalls for employees, 79 stalls for visitors, and 44 stalls for fleet vehicles (see Figure 2 and Table 1-1). The project would include 108 EV-capable spaces, with 82 Type 2 electric vehicle (EV) chargers and 4 DC fast charging stations. The proposed project would also include 17 covered bike parking spaces for staff members and four spaces for the public. In addition, the proposed project would include the following modifications to the vehicular circulation system on public roadways in the vicinity: Brentwood Boulevard at Technology Way – Northbound Left-Turn Movement (NB-L): The existing raised median would be modified to allow the extension of the turn pocket and increase the storage capacity. Brentwood Boulevard at Sand Creek Road – Eastbound Right-Turn Movement (EB-R): Modify roadway painting to use the existing available spacing between the turn pocket’s western terminus and the eastern limit of an existing driveway 30 feet west of the western terminus of the turn pocket. Business Center Drive at Sand Creek Road – Eastbound Left-Turn Movement (EB-L): Modify the existing raised median to allow the extension of the turn pocket and increase the storage capacity. Modifications (e.g., access points, modifications to the circulation system, utility connections, etc.) within the public right-of-way would be constructed to comply with City standards. Occupancy The proposed project would result in approximately 441 County employees working at the project site, including approximately 150 relocated employees from other County facilities. Construction Schedule and Construction Activities Project construction is anticipated to begin in early 2026 and be completed by the end of 2027, a period of approximately 20?months. The phases of project construction include: Phase 1: Site mobilization and site preparation, which would take approximately 1 month. Phase 2: Rough grading, site utilities, and geothermal work, which would take approximately 10 weeks. Phase 3: Foundations, which would take approximately 6 weeks. Phase 4: Construction of the building, which would take approximately 15 months. Phase 5: Paving and landscaping, which would take approximately 1?month. Phase 6: Application of architectural coatings, which would take approximately 1 month. Construction grading is anticipated to affect the entire project site (i.e., approximately 7.86 acres, or 340,000 square feet). Approximately 2,200 cubic yards of soil would be off-hauled over the course of project construction. The maximum depth of excavation for the project is up to 400 feet for the proposed geothermal system; no dewatering during construction of the project would be required.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is soliciting interest from Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations to receive a free American Water Works Association (AWWA) M36 water audit. The program is designed to help entities identify water loss objectives, particularly those failing to meet the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants can receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be prepared to enter into a contract within 15 to 30 days of the grant award. Responses to this Request for Interest are due by October 21, 2026.
BWR00 - Bureau of Water Resources

POSTED

about 18 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS