Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Colorado was posted on July 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

East Metro Solar Inverter Replacement

Closed
RFP 126DE001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
Transformer Oil Testing Services
Solicitation # RFP-VC-26-010
The Inland Empire Utilities Agency is soliciting proposals under RFP-VC-26-010 for professional transformer oil testing services to enhance the reliability, safety, and maintainability of its transformers. The scope of work is divided into three primary areas: conducting visual and infrared thermographic inspections on energized transformers to identify thermal anomalies, installing standardized external oil sampling devices for safer collection, and performing detailed oil testing analysis. Additionally, the selected contractor must evaluate existing nitrogen blanket systems to ensure positive pressure and provide on-site training for up to 20 agency staff members on inspection methods and defect identification. All work must adhere to strict industry standards, including NETA MTS, IEEE, NFPA 70E, and ASTM D923, with infrared inspections performed by ASNT Level 1 certified technicians or higher. The agency intends to make a single award to the most capable offeror based on their past performance, staffing plan, personnel availability, and cost-effectiveness. Qualified proposers must have completed at least two similar projects within the last five years, including at least one for a utility or industrial facility. Proposals must be submitted electronically via PlanetBids by December 23, 2026, and must include a detailed project approach, company profile, and required certifications such as a Non-Collusion Statement and Workers Compensation Certificate. The resulting contract will utilize fixed pricing with a not-to-exceed limit, and payments will be processed electronically via ACH within 30 days of invoice approval by the Project Manager.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in about 2 months
NAICS: 238210
New
Centennial JCC Emergency Lighting Replacement, Upgrade, Testing & Maintenance Services
Solicitation # centennial-jcc-emergency-lighting-replacement-upgrade-testing-maintenance-services
Management and Training Corporation is soliciting bids for a fixed-price, single lump sum contract to provide emergency lighting replacement, upgrade, testing, and maintenance services at the Centennial Job Corps Center in Nampa, Idaho. The project involves the inspection, testing, repair, and certification of emergency lighting systems to ensure compliance with NFPA 101 (2024 Edition) and NFPA 70 standards. The selected electrical contractor will be responsible for inventorying all fixtures, performing functional power-cut tests, applying durable tracking labels, and integrating recurring maintenance into the facility's Computerized Maintenance Management System. The estimated contract value ranges from $25,000 to $100,000, with a performance period of 30 business days following the written Notice to Proceed. Bids are due by December 1, 2026, and must be submitted via email to Sandra Clore. A mandatory physical site visit and signature on the attendance roster are required prior to bid submission. For bids equal to or greater than $25,000, contractors must provide a bid bond guarantee of 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. The award will be based on overall best value. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. The contract mandates strict adherence to federal labor and safety regulations, including the Davis-Bacon Act, Service Contract Labor Standards, and Executive Order 14026 regarding minimum wages. Contractors must provide paid sick leave per EO 13706 and display required bilingual employee rights and wage determination notices. Compliance with various FAR clauses is required, including those regarding the Buy American Act, whistleblower rights, and the prevention of trafficking in persons. Final acceptance and payment are contingent upon a substantial completion inspection and the resolution of a final punch list.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The East Metro Solar Inverter Replacement contract seeks to replace four non-functional solar inverters at a rooftop photovoltaic system in Denver, Colorado, which currently houses 22 inverters at end of life with no possibility of repair. The existing AC and DC wiring remains intact and will be reused, ensuring minimal disruption and cost efficiency during the replacement process. The project is critical to restoring reliable electricity generation from the solar array, and the work must be completed promptly to maintain system functionality. The solicitation is issued by the Colorado Capital Programs agency under RFP 126DE001, with submissions due by August 12, 2026. The contracting office is located in Denver, and the place of performance is also in Colorado. Primary point of contact is Richard Rost, Manager of Facilities Engineering, with Patrick Naulty as the Procurement Specialist II available for additional inquiries.

General Info

Replace four faulty solar inverters at Denver rooftop system; reuse existing wiring; due August 12, 2026.

Documents

10

Exhibit A Drawings - East Metro Solar Inverter Replacement 2026

PDF, High priority: read this firstsow
High

Goal Determination Letter for East Metro Solar Inverter Replacement RFP

PDF, High priority: read this firstdetermination-and-findings
High

ICE for East Metro Solar Inverter Replacement

PDF, High priority: read this firstindependent-cost-estimate
High

Procurement Initiation Form - East Metro Solar Inverter Replacement 2026

PDF, High priority: read this firstprocurement-initiation-form
High

RFP 126DE001 East Metro Solar Inverter Replacement

PDF, High priority: read this firstrfp
High

RFP 126DE001 East Metro Solar Inverter Replacement

PDF, High priority: read this firstrfp
High

SOW East Metro Solar Inverter Replacement 2026

PDF, High priority: read this firstsow
High

Exhibit B Reference Pictures for East Metro Solar Inverter Replacement 2026

PDF, Low priorityexhibit-b
Low

Liquidated Damages Memo for East Metro Solar Inverter Replacement

PDF, Low priorityother
Low

List of Certified Firms for East Metro Solar Inverter Replacement

XLSX, Low priorityvendor-list
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyColorado → Capital Programs
Contacts2 people available
OfficeDenver, CO, 80202, USA
Organization / AgencyColorado → Capital Programs
Office AddressDenver, CO, 80202, USA
Contacts
Richard RostManager, Facilities Engineering
Patrick NaultyProcurement Specialist II

Interested Companies (3)

Sturgeon ElectricHenderson, Colorado
Seven OutsourceNewark, DE
Coffman EngineersNewport Beach, CA

Full Description

Show more
The existing photovoltaic system on the roof comprises of total 22 roof top solar inverters. Inverters are at the end of their useful life, non-existent and non-repairable. It is critical that these (4) inverters are installed at this time and repowered to ensure reliable generation of electricity from a fully functional solar panel system. AC and DC Wiring has been disconnected from the inverters and left in place. Refer to Exhibit B for additional information.

More opportunities from Colorado → Capital Programs

Same awarding agency

NAICS: 561720
New
SLED
Bus Shelter Maintenance Services (15% SBE Goal)
Solicitation # 126DM016
The Regional Transportation District (RTD) is soliciting proposals for a fixed-price contract to provide custodial services, graffiti removal, and snow removal at various locations, including Group 3 shelters, North and South Federal shelters, and the Federal and Colfax and Federal and Evans transfer centers. The contract features a three-year base period starting December 1, 2026, with two optional one-year extensions. A key requirement of this solicitation is a 15% Small Business Enterprise (SBE) participation goal, and proposers must provide detailed SBE enclosures or document good faith efforts to meet this target. Proposals are due by November 16, 2026, and will be evaluated primarily on cost, which accounts for 40% of the total score. The scope of work requires daily servicing of transfer centers and weekly cleanings for other shelters, including trash removal, glass cleaning, and the remediation of health hazards. The contractor must adhere to strict performance standards, including a one-hour response time for RTD requests and corrective actions. Technical requirements include the submission of detailed custodial, graffiti, snow removal, staffing, and quality control plans, as well as a transportation maintenance and safety plan compliant with the Manual on Uniform Traffic Control Devices. Contractors are also mandated to use GPS tracking for vehicles and comply with prevailing wage laws and non-discrimination statutes. Payment is issued within 30 days of invoice approval, provided a monthly progress report is submitted.
Janitorial Services

POSTED

1 day ago

DEADLINE

in 19 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS