Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

East Valley Water District Well No. 152

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Greenspot Road, Highland, CA, 92346

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → East Valley Water District
Contacts2 people available
OfficeN/A

Interested Companies (1)

Webb AssociatesRiverside, CA

Full Description

Show more
EVWD proposes the drilling, construction, operation, and maintenance of a new potable groundwater supply well to replace production lost due to decommissioning existing wells. The site would include the following features: a new wellhead; an approximately 900-square-foot split-face Concrete Masonry Unit well building with a maximum height of 18 feet; an approximately 200-square-foot chemical building containing separate rooms for chlorine and orthophosphate storage tanks; a 58,000-gallon above-ground water storage tank measuring approximately 25 feet in diameter and 18 feet tall; an approximately 400-square-foot booster station equipped with two 125-horsepower electric pumps; an approximately 350-kilowatt pad-mounted standby diesel generator; and new connections to existing storm drain system and potable water pipelines. The District anticipates that the new well would be drilled to a depth of approximately 800 feet below ground surface with a maximum 42-inch-diameter casing. The well would be equipped with an electric motor and designed to produce approximately 2,000 gallons per minute of potable groundwater.

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS