This Combined Synopsis/Solicitation opportunity from Agency For International Development was posted on July 9, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Eastern Primary Transmission Project

Closed
104-2008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 9 hours ago

DEADLINE

in 20 days

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Mafraq, DC, JOR

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyAgency For International Development → Usaid/jordan
Contacts2 people available
OfficeWashington, DC, 20521, USA
Office AddressWashington, DC, 20521, USA
Contacts
Ziad Abd-RabuAcquisition & Assistance Specialist
Ministry of Public Works and HousingGovernment Tenders Directorate

Full Description

Show more
Central Tender No. (104/2008) INVITATION TO PREQUALIFY CONTRACTORS For Rehabilitation of the Northern Governorates Water Transmission System - Eastern Primary Transmission Project The Prequalification is Open for United states Construction Contractors The Ministry of Water and Irrigation (MWI)/ Water Authority of Jordan (WAJ), through the Ministry of Public Works and Housing/Government Tender directorate (GTD), is soliciting expression of interest and submission of the pre qualification information from qualified and experienced United States construction contractors to pre-qualify for a construction contract of Rehabilitation of the Northern Governorates Water Transmission System - Eastern Primary Transmission Project (Contract No. 104/2008/Central). Prospective contractors must qualify at a minimum based on their eligibility, required resources, financial capacity, and technical experience with projects of similar scope and magnitude as described in the pre-qualification documents. As a result of this exercise, the prequalified contractors will be invited to bid on the construction of Rehabilitation of the Northern Governorates Water Transmission System - Eastern Primary Transmission Project, Jordan. The construction works will be partially funded by a grant from the United States Agency for International Development (USAID) and partially by WAJ, and will be implemented and owned by WAJ on property owned by the Government of Jordan. 1. Project Description: The Northern Governorates Water Transmission System - Eastern Primary Transmission Project consists of the purchase, delivery, construction and pre-commissioning of a new pump station at Zatary and a new pipeline extending from the new Zatary pump station to the existing reservoir at Hofa. Specific components of the project are: - Construction of a new pump station at Zatary in Mafraq Governorate, that includes the construction of a pump house and installation of equipments including 4 new pumps (3 service and 1 standby) each of a720m3 /hr capacity. - Construction of a control building at the Zatary pump station. - Installation of piping, comprising of 1200 mm steel pump suction header and 1000 mm steel discharge header, at the Zatary pump station. - Civil and landscaping works at the Zatary pump station site. - Approximately 47,800 m of Ductile Iron Pipe pipeline and take-offs ranging in size from 700 mm to 1000mm diameter with air release valves, gate valves, butterfly valves, and wash outs. - General Packet Radio Service (GPRS) based telemetry system between the Zatary pump station and Hofa reservoir including intermediate control points. 2. The anticipated contract value is above US$ 40.0 million. 3. Interested Contractors may obtain, at no cost, the prequalification questionnaire beginning on 09/07/2008 by downloading it from the GTD official website: www.gtd.gov.jo 4. The last date for obtaining the prequalification documents is 23/07/2008, close of business at 3 PM Jordan local time. 5. Inquiries related to the prequalification questionnaire should be sent to GTD Director General Chairman of the Central Tenders Committee via fax or e-mail to the following address before 31/07/2008. Interested contractors are requested to follow up regarding the issuance of any addenda to the Prequalification Document or answers to inquires through GTD official website. Chairman of the Central Tenders Committee Director General Government Tenders Directorate Ministry of Public Works and Housing 8th Circle, King Abdullah II Street Amman, Jordan Tel: (00 962-6) 5858311/14 Fax: (00 962-6) 5857583, (00 962-6) 5857639 E-mail: biddings@gtd.gov.jo Website: www.gtd.gov.jo 6. The Prequalification Application will be evaluated under the evaluation criteria set forth in the Prequalification Questionnaire. 7. The Employer has the right to cancel the Prequalification Process without bearing any financial or legal obligation. 8. The last date for submission of the Prequalification will be no later than 12:00 hours (Jordan Local Time) on 21/08/2008 to GTD at the address mentioned above. A public opening to acknowledge receipt of the submission will be held at 1400 hours on the same date in the same venue in the presence of applicants or their representatives who can choose to attend and will be transmitted live (audio and video) on the above GTD official website. 9. Selection for prequalification shall not constitute an obligation on the Central Tenders Committee to award of contract, which will only be determined later through an evaluation of tender bids from prequalified firms. 10. Please be advised that in the past some firms have experienced delays with international air courier services. These delays are not uncommon and normally a result of packages being held by customs. Qualification packages received after the closing date and time will not be accepted. In the event prospective contractors elect to utilize the service of an independent local courier to deliver the pre-qualification package, please be certain that he/she understands that the prospective contractor must submit their documentation to the above no later than the time and due date mentioned above.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS