Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on April 8, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Eaton 9390 Battery System Modernization

Closed
FA302026Q0032Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811210
New
SLED
Statewide Standby Generator, ATS & UPS Preventive Maintenance Services
Solicitation # BD-27-1107-FREG5-ACCOU-133129
The Massachusetts Trial Court, through the Office of Court Management, Facilities Management & Capital Planning, is soliciting bids for statewide preventive maintenance, inspection, operational testing, load-bank testing, repair, and emergency services for standby generators, automatic transfer switches, and uninterruptible power supply systems. The contract is structured into five independent regional award groups, with each region being awarded to the lowest responsible and eligible bidder. The initial performance period is 32 months, running from November 1, 2026, to June 30, 2029, with two optional one-year renewals available through June 30, 2031. Bidders must submit their response packages electronically via the COMMBUYS portal by September 30, 2026, including a bid deposit of at least 5 percent of the greatest possible bid amount per region. Award evaluation is based on bid responsiveness, eligibility, and the lowest evaluated regional price, with a requirement that contractors demonstrate the capacity to perform in multiple regions simultaneously if awarded more than one. Contractors must adhere to NFPA 70B, the Massachusetts Comprehensive Fire Safety Code, and the Massachusetts Electrical Code, and are required to provide detailed electronic service reports as a condition of payment. Payments are processed via Electronic Funds Transfer through the Comptroller's system, typically 45 days from invoice receipt.
FREG5 - Facilities Management & Capital Planning - Region V

POSTED

1 day ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The United States Air Force is seeking a contractor to replace end-of-life batteries and capacitors in the Eaton 9390 Uninterruptible Power Supply (UPS) system at Sheppard Air Force Base in Texas. The modernization project involves installing a new Eaton battery configuration designed to reduce the total number of batteries while maintaining support for a 30 KVA critical load for at least two hours, along with replacing all aged capacitors to return the system to original factory specifications. Only new Eaton hardware is acceptable, and all work must be conducted by an Eaton-certified technician. The contractor is responsible for conducting a mandatory site visit, safely removing and disposing of old batteries following environmental regulations, and performing full system testing to ensure proper operation under simulated power-loss conditions. Key administrative details include a mandatory site visit scheduled for April 15, 2026, at Sheppard AFB, with vendors required to coordinate base access by April 13, 2026. Questions must be submitted by April 17, 2026, and quotes are due no later than April 25, 2026, by 4:30 p.m. CST. Submissions must include a detailed Statement of Work outlining the modernization approach, pricing using the provided COMBO form, and must remain valid for 90 days. This solicitation is a total small business set-aside under NAICS code 811210 with a $34 million size standard. The contracting point of contact is Cristhian Gonzalez, supported by Kimberly Rico.

General Info

USAF seeks Eaton-certified contractor to replace batteries, capacitors in Sheppard AFB UPS by April 2026.

Agency

Department Of Defense → FA3020 82 Cons LgcView Agency

NAICS

811210 - Electronic and Precision Equipment Repair and MaintenanceView NAICS

Place of Performance

DWG, TX, 76311, USA

Set-Aside

SBA

Documents

(4)

Attachment 2 - Provisions and Clauses

PDFclauses

Statement of Objective for Eaton 9390 UPS Battery and Capacitor Replacement

PDFsoo

Brand Name Requirement Justification for Eaton UPS Battery Replacement

PDFjustification-and-authorization

RFO+Combo+-+82+CS+UPS+Battery+System+Modernization.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3020 82 Cons Lgc
Contacts2 people available
OfficeSHEPPARD AFB, TX, 76311-2743, USA
Organization / Agency
Department Of Defense → FA3020 82 Cons Lgc
View Agency Profile
Office AddressSHEPPARD AFB, TX, 76311-2743, USA

Full Description

Show more

The United States Air Force requires the replacement of end‑of‑life batteries and capacitors for the Eaton 9390 Uninterruptible Power Supply (UPS) located in Building 237 at Sheppard AFB, TX. This requirement falls under PSC J059, NAICS 811210, with a corresponding $34M size standard. The project will modernize the existing UPS by installing a new, optimized Eaton battery configuration that reduces the total number of batteries while maintaining the capability to support a 30 KVA critical load for a minimum of two hours. All aged capacitors within the Eaton 9390 unit will be replaced to restore the system to original factory specifications and prevent potential failure points. In accordance with the approved brand‑name justification, all components must be new Eaton hardware, and all work must be performed by an Eaton‑certified technician. The contractor will be responsible for conducting a mandatory site visit to verify field conditions and measurements, safely removing and disposing of all existing batteries in compliance with federal, state, and local environmental regulations, and performing full system testing to validate proper operation under simulated power‑loss conditions.


A mandatory site visit is scheduled for 15 April 2026 at 9:30 a.m. CST and the meeting location is at the Sheppard AFB Visitor Center, 210 Missile Rd, Wichita Falls, TX 76311. Vendors must email cristhian.gonzalez_tovar@us.af.mil and kimberly.rico@us.af.mil no later than 13 April 2026 (COB) to coordinate base access. Questions regarding this requirement may be submitted to the POC and Contracting Officer no later than 17 April 2026 at 1:00 p.m. CST, questions received after this deadline may not receive a response. Quotes must be submitted via email to the POC and Contracting Officer by 25 April 2026 at 4:30 p.m. CST and must remain valid for 90 days along with Statement of Work (SOW) describing the solution to modernize Eaton system. All pricing must be submitted using the provided COMBO; vendors may include a supplemental quote on a company letterhead, but all technical submissions must be provided in a separate document. Vendors must also complete the contractor identification section included in the solicitation COMBO.

More opportunities from Department Of Defense → FA3020 82 Cons Lgc

Same awarding agency

NAICS: 541511
New
Federal
82 FSS Automated Student System
Solicitation # FA302026Q0087
Solicitation FA302026Q0087 is a request for quotes from the 82d Contracting Squadron at Sheppard AFB, Texas, for the creation of an Automated Student Processing System. The project requires a turnkey commercial or modified commercial web application to automate student in and out-processing, replacing paper-based routing with a digital platform hosted within the Air Force Network's Microsoft Office 365 site collection. The system must support role-based access, CAC-based authentication and signatures, and maintain strict compliance with PII and CUI program requirements, including the Privacy Act of 1974 and DoD cybersecurity standards. The government intends to award a single Firm Fixed Price contract consisting of a one-year base period with four additional one-year option periods. This requirement is a total small business set-aside with the updated NAICS code 513210 for Software Publishers. The government will utilize a best-value evaluation process, considering technical suitability, scalability, and price, with a 10 percent price preference for HUBZone small business concerns. While the place of performance is Sheppard AFB, on-site presence is only required for delivery, configuration, and training, with subsequent technical support provided remotely. All offers must be submitted via email to the designated contracting personnel by 2:00 PM CST on September 14, 2026. Note that funds are not currently available, and no award will be made until funding is secured.
Custom Computer Programming Services

POSTED

2 days ago

DEADLINE

in 4 days
View Details
NAICS: 333912
New
Federal
Air compressor Replacement (brand name or equal)
Solicitation # FA302026Q0093
The Department of Defense, through the 82d Contracting Squadron at Sheppard AFB, Texas, is soliciting quotes for the procurement and installation of an Air Pack Compressor fill station at Building 1093. This requirement is a total set aside for small business concerns under NAICS code 333912. The project involves a turnkey solution that includes the supply, installation, programming, testing, and user training of a high-pressure breathing air compressor system, as well as the removal of the legacy unit. The system must meet specific salient characteristics, including NFPA 1901 certification, ASME air storage, CGA Grade E purification, and PLC automation. While the solicitation specifies brand name or equal, a justification is provided for the RevolveAir Containment Fill Station to ensure operational readiness and safety. The anticipated contract will be awarded as a single Firm Fixed Price agreement with a period of performance of 360 calendar days from the date of award. Quotes must be comprehensive, including all costs for shipping, unloading, and installation, and must remain valid through December 31, 2026. Technical submissions are required to include full specifications for the quoted equipment. The solicitation closes at 2:00 PM CT on September 16, 2026, with all written inquiries due by September 14, 2026.
Air and Gas Compressor Manufacturing

POSTED

2 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS