Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Massachusetts was posted on August 20, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ed 2025-17

Closed
BD-26-1153-ENG01-ENG01-120020State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sanitary sewer system improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping ranging from 6 to 30 inches, the construction of standard and doghouse manholes, and the execution of 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, maintenance of flows and bypass operations, and the abandonment of existing pipes and manholes. Project execution requires strict adherence to environmental standards through SWPPP implementation and maintenance, as well as the use of geotechnical instrumentation and monitoring. Due to the project location and nature, railroad insurance is a mandatory requirement. General site preparation tasks such as clearing and grubbing of wooded areas and subsequent seeding and fine grading are also included in the bid schedule.
Cleary Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract ED 2025-17 pertains to drainage improvements along Cook Lane and Hildreth Street in Marlborough, Massachusetts. The project involves installing new drainage systems, performing temporary and final trench paving, and includes all necessary labor, materials, and equipment to complete the work. The estimated cost for this project is approximately $800,000, with the contract size ranging between $720,000 and $880,000. The project was publicly solicited on August 20, 2025, with a response deadline of September 5, 2025. It is managed by the City of Marlborough under the Massachusetts state agency, with primary contact being Katlyn Miller, who can be reached via email or phone. The project aims to enhance drainage infrastructure in the specified areas, ensuring proper stormwater management and roadway stability.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 17 days
  • Lift Station No. 85 ReplacementOpen now, due in 28 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → City of Marlborough
Contacts1 person available
OfficeN/A

Full Description

Show more
ED 2025-17 Drainage Improvements on Cook Lane and Hildreth Street in Marlborough, MA. The project consists of drainage improvements, temporary and final trench paving, including all labor, material and equipment necessary to complete the Work. The estimated project cost is approximately $800,000.00.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS