Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Minnesota was posted on May 23, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Eden Prairie WTP Air Compressor Replacement

Closed
9701960State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333912
New
DIBBS
GUIDE, COMPRESSOR BE
Solicitation # SPE4A7-27-Q-0230
Solicitation SPE4A7-27-Q-0230 is a firm fixed price, small business set-aside procurement issued by the Defense Logistics Agency for 122 units of the Guide, Compressor BE (NSN 2840-00-906-4751). This item is designated as an Air Force Critical Safety Item and must be manufactured in accordance with reference drawings 77445 PWA355 (Revision AC) and 77445 471490 (Revision B). Delivery is required within 365 days after receipt of order, with a specific material need ship date of November 4, 2026, and terms set as FOB Destination. The contract mandates strict adherence to technical and quality standards, including SAE AS9100 and higher-level contract quality requirements. Inspection and acceptance are performed at origin using zero-based sampling plans. Packaging must comply with MIL-STD-2073-1E and MIL-STD-129, while marking follows MIL-STD-130. Due to the nature of the technical data, the contract is subject to ITAR and EAR export controls, requiring contractors to have approved US/Canada Joint Certification Program certification. Additionally, the contractor must maintain Cybersecurity Maturity Model Certification (CMMC) Level 2 and utilize the Wide Area WorkFlow (WAWF) system for invoicing and payment. Award will be based on a best-value determination, weighing cost, past performance (via SPRS assessments), and quoted delivery.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER AE AND AF DIV

POSTED

about 19 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The contract involves the comprehensive construction work required for the Eden Prairie Water Treatment Plant air compressor replacement project, which includes the removal of two existing compressors and the installation of new equipment and related appurtenances. Bidders must demonstrate responsibility by signing a certification form as per Minnesota law and submit a bid accompanied by a surety bond equal to 5% of the bid amount, ensuring their commitment to enter into a contract if awarded. The project requires bidders to be fully licensed for the bid amount and to submit bids on a cash or check basis. The City of Eden Prairie retains the right to reject any or all bids, waive informalities, and award the contract to serve the best interests of the city. Additionally, the city may hold the three lowest bids for up to 60 days, and no bid can be withdrawn during this period. The solicitation, titled "Eden Prairie WTP Air Compressor Replacement," was posted on May 23, 2025, with a response deadline of June 12, 2025. The project falls within the NAICS code 333912, relating to air and gas compressor manufacturing, and is managed by the City of Eden Prairie under the Minnesota State Local Economic Development (SLED) program. The estimated contract size ranges from $200,000 to $500,000. The primary contact for inquiries is Kami Emineth, reachable via email or phone. The project details and bidding process are accessible through the provided online link.

General Info

Documents

1
PDF

Read the document

Every page of every file, in your free workspace.

Read the document

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Vaneaxial Fan Manufacturer/SupplierOpen now, due in 11 days
  • GUIDE, COMPRESSOR BEOpen now, due in 10 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMinnesota → City of Eden Prairie
Contacts1 person available
OfficeN/A

Full Description

Show more
The Work shall be completed under one Contract and consists of all labor, skill and materials required to properly construct the Project. The Project generally consists of the following primary components:CONTRACT NO. 1 - EDEN PRAIRIE WTP AIR COMPRESSOR REPLACEMENTGenerally, includes the replacement of two existing plant air compressors and appurtenances.All Bidders must certify they are a Responsible Contractor by signing a certification form stating they meet the minimum requirements under Minnesota Statute 16C.285. This form can be found in Section 00 43 29 of the project documents.Each Bid shall be accompanied by a Bidder’s Bond executed by the Bidder as principal and by a surety company authorized to do business in the State of Minnesota, payable to the City of Eden Prairie, in a sum equal to five (5) percent of the full amount of the Bid. This is to serve as a guarantee that the Bidder will enter into a Contract within 15 days of Notice of Award in accordance with the terms of the principal’s Bond and a contractor’s Bond as required by law and the regulations and determinations of the governing board for the performances of such Work. Only Bids that are accompanied by such a Bond will be considered. Bidder must be licensed for the full amount of the Bid. No Bid will be read or considered which does not fully comply with the above provisions as to bond and license.All Bids will be made on the basis of cash or check payment for such Work. The Council reserves the right to reject any or all Bids, waive any informalities in the Bids received, and further reserves the right to award the Contract in the best interest of the City. The City reserves the right to hold the three (3) lowest Bids for a period not to exceed sixty (60) days after the date of Bid opening. No bid may be withdrawn within 60 days from the date of bid-opening.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS