This Solicitation opportunity from Iowa was posted on December 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The City of Cedar Rapids is soliciting sealed bids for the Edge of Field Projects-Batch 3, with a submission deadline of January 10, 2025, at 3:00 pm CST. Bids must be submitted exclusively through the City’s online E-Procurement portal, IonWave, with no acceptance of email, fax, or hard copies. The project, managed by the Cedar Rapids Utilities Department, has a contract size estimated between $500,000 and $2,000,000. Bidders are responsible for ensuring their responses are correctly submitted, as the City will not be liable for delays or errors. After bid opening, evaluations will be conducted promptly, and bid results will be communicated only after the award, with a mandatory 60-day bid validity period. A bid tabulation will be shared with all submitting companies post-award.
The solicitation includes standard contractual terms covering insurance requirements, ADA compliance, bid submission protocols, conflict of interest policies, and dispute resolution procedures. The contract aims to establish a clear legal framework for project execution, ensuring adherence to applicable laws and regulations. The primary point of contact for inquiries is Heather Mell, reachable via email or phone. Additional documents associated with the bid include certifications regarding insurance capabilities, detailed bid instructions, and relevant addenda that clarify project specifications and requirements. The overall process emphasizes transparency, compliance, and competitive bidding to select qualified contractors for the project.
PDF, High priority: read this firstoperation-and-maintenance-plan
HighAI Summary for BC-1 Approved Plans - Pre-Construction and O&M Plan for Jim Klopping Saturated Buffer: This document titled 'BC-1 Approved Plans' includes a Pre-Construction Conference form, a Construction Inspection Plan, and an Operation and Maintenance Plan for a Saturated Buffer practice for the project named Jim Klopping JK-2.5 in Benton County, Iowa. It outlines attendees, pre-installation review items, inspection responsibilities, and quality assurance activities. The O&M plan details the responsibilities of the landowner/operator for maintaining the practice for at least 15 years, including operation settings and maintenance requirements to ensure environmental compliance and practice effectiveness. The document is dated 8/23/24 and prepared by John Rathbun.
PDF
PDF, High priority: read this firstconstruction-plans
HighAI Summary for BC-6 Approved Construction Plans for Denitrifying Bioreactor: This document contains the approved construction plans and related pre-construction conference details for the Denitrifying Bioreactor project named Robert Johnson RJ-1-2 in Benton County. It includes attendee information, pre-installation checklist, roles and responsibilities, inspection plans referencing NEM Part 512 quality assurance activities, and an operation and maintenance plan dated 8-1-24. The document outlines contractor and NRCS responsibilities, inspection criteria, and O&M requirements for the bioreactor structure to ensure compliance with contract specifications and environmental regulations.
PDF
PDF, High priority: read this firstconstruction-plans
HighAI Summary for BC-7 Complete Approved Construction Plans: This document titled 'BC-7 Complete Approved Construction Plans' includes pre-construction conference details, construction inspection plan, and operation and maintenance plan for a denitrifying bioreactor project named Van Land Bioreactor in Benton County. It outlines roles and responsibilities, inspection criteria, quality control and assurance activities, and operation and maintenance requirements for the bioreactor structure. The document serves as a comprehensive guide for contractors, NRCS representatives, and landowners to ensure proper installation, inspection, and upkeep of the conservation practice.
PDF
PDF, High priority: read this firstinsurance-requirements
HighAI Summary for Insurance Requirements and Endorsements for RFB #PUR1124-165: This document outlines the insurance requirements and endorsements for contractors under Contract RFB #PUR1124-165 with the City of Cedar Rapids, Iowa. It specifies mandatory insurance coverages including General Liability, Automobile Liability, and Workers Compensation with minimum limits and required endorsements such as Additional Insured, Non-Waiver of Governmental Immunities, and Cancellation and Material Changes. The document details conditions for maintaining insurance, insurer qualifications, notification requirements for changes or cancellations, and subcontractor insurance obligations. It also mandates submission of a Certificate of Insurance with specific details before contract approval. The document ensures the City is protected as an additional insured with primary coverage and sets forth procedures for compliance and enforcement.
PDF
PDF, High priority: read this firstconstruction-plans
HighAI Summary for Kevin Robinson Denitrifying Bioreactor Construction and O&M Plans: This document contains the complete approved construction plans and operation and maintenance (O&M) plan for the Kevin Robinson Denitrifying Bioreactor project in Benton County, Iowa. It includes a pre-construction conference checklist, construction inspection plan referencing NEM Part 512 quality assurance activities, and detailed O&M instructions for the bioreactor practice. The document outlines roles and responsibilities, inspection requirements, and critical construction elements such as earthfill placement, conduit installation, and seeding. The O&M plan emphasizes the importance of proper operation and maintenance for the life of the practice, at least 10 years, to ensure nitrate reduction in agricultural drainage.
PDF
PDF, High priority: read this firstperformance-bond
HighAI Summary for Performance Bond for Edge of Field Projects-Batch 3, Benton County IA: This document is a Performance Bond related to contract #PUR1124-165 for Edge of Field Projects-Batch 3 at various locations throughout Benton County, Iowa. It binds the contractor and surety to the owner, City of Cedar Rapids, ensuring contract performance. The bond outlines obligations of the contractor and surety, conditions for default, and remedies available to the owner. It includes provisions for notification, default declaration, surety actions, liability limits, and legal jurisdiction. The bond is intended to comply with statutory requirements and includes signature sections for contractor, surety, and owner representatives.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for PUR1124-165 Edge of Field Projects-Batch 3 Request for Bid: This document is a Request for Bid (RFB) issued by the City of Cedar Rapids for the Edge of Field Projects-Batch 3, with an issue date of December 18, 2024. It includes instructions to bidders, contact information, and deadlines for questions (January 3, 2025) and bid submission (January 10, 2025). The RFB specifies that bids must be submitted electronically via the City's Online E-Procurement portal and outlines requirements such as insurance certificates and payment bonds. The document also contains various attachments including plans, scope of work, and insurance requirements. The project is not federally funded, and insurance is mandatory before work begins.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB Contract Terms and Conditions: This document contains the terms and conditions for a Request for Bid (RFB) contract, including provisions on accelerated pay discounts, ADA compliance requirements, assignment restrictions, bid currency and language, bid form submission rules, public access to bid information, bid rejection rights, conflict of interest policies, dispute resolution procedures, FOB point and freight charges, and force majeure clauses. It outlines the responsibilities and obligations of the contractor and the City, ensuring compliance with federal laws and regulations, and sets the framework for contract execution and administration.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Robert Johnson Denitrifying Bioreactor Construction and O&M Plans: This document contains the approved construction plans and operation and maintenance (O&M) plan for the Robert Johnson Denitrifying Bioreactor project in Benton County. It includes a pre-construction conference checklist, construction inspection plan referencing NEM Part 512 quality assurance activities, and detailed O&M instructions. The document outlines roles and responsibilities, inspection criteria, and critical construction elements to ensure compliance with contract specifications. The O&M plan emphasizes the landowner's responsibility for proper operation and maintenance for at least 10 years, including environmental compliance and performance monitoring.
PDF
PDF, High priority: read this firstconstruction-plans
HighAI Summary for Robert Johnson Denitrifying Bioreactor Construction and O&M Plans: This document contains the approved construction plans and operation and maintenance (O&M) plan for the Robert Johnson Denitrifying Bioreactor project in Benton County. It includes a pre-construction conference checklist, construction inspection plan referencing NEM Part 512 quality assurance activities, and detailed O&M instructions. The document outlines roles and responsibilities, inspection criteria, and critical construction elements such as pollution control, conduit installation, and seeding. The O&M plan emphasizes the landowner's responsibility for proper operation and maintenance for at least 10 years, ensuring compliance with laws and environmental protection.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Robert Johnson RJ-4 Denitrifying Bioreactor Construction and O&M Plans: This document contains the approved construction plans, inspection plan, and operation and maintenance (O&M) plan for the Robert Johnson RJ-4 Denitrifying Bioreactor project in Benton County. It includes details from a pre-construction conference, outlining roles, responsibilities, permits, and construction schedules. The construction inspection plan defines quality control and assurance activities, inspection levels, and responsibilities for various work items. The O&M plan describes the purpose of the bioreactor, the landowner's responsibilities for operation and maintenance over a minimum 10-year lifespan, and key operational details referenced to installation benchmarks. The document is essential for guiding construction and ensuring compliance with NRCS standards.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Scope of Work - Edge of Field Projects Batch 3 - Cedar Rapids: This Scope of Work document outlines the requirements for the Edge of Field Projects Batch 3 for the City of Cedar Rapids Utilities Department. It details the implementation of saturated buffers and bioreactors to reduce nitrate runoff in Benton County, Iowa. The document specifies contractor responsibilities including staffing, safety compliance, OSHA 10 training, mobilization, demobilization, and waste disposal. It also covers regulatory adherence, underground utility locates, and damage repair protocols. The document serves as a comprehensive guide for contractors to execute the project in accordance with city and regulatory standards.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Van Land Bioreactor Construction and O&M Plans: This document contains the complete approved construction plans and operation and maintenance (O&M) plan for the Van Land Bioreactor project in Benton County, Iowa. It includes a pre-construction conference checklist, construction inspection plan referencing NEM Part 512 quality assurance activities, and detailed O&M instructions for the denitrifying bioreactor (Code 605). The document outlines roles and responsibilities, inspection criteria, and critical construction elements such as earthfill placement, conduit installation, and seeding. The O&M plan emphasizes the importance of proper operation and maintenance for at least 10 years to ensure the bioreactor's effectiveness in reducing nitrate nitrogen in agricultural drainage.
PDF
PDF, Low prioritycertification
LowAI Summary for Certification by Bidder's Insurance Agent for RFB Insurance Coverage: This document is a certification by the bidder's insurance agent or broker affirming the bidder's ability to obtain the required insurance coverage and endorsements as specified in Attachment B of the related Request for Bid (RFB). It includes fields for project name and number, legal name of bidder, insurance agency details, and agent/broker signature and date. The certification confirms the bidder has been advised of any additional costs and agrees to obtain the necessary insurance if selected.
PDF
PDF, Low priorityother
LowAI Summary for Middle Cedar Clean Water Partnership - Batch & Build #3 Overview Map: This document is an overview map for the Middle Cedar Clean Water Partnership, Batch & Build #3, dated December 18, 2024. It includes geographic data and scale information with sources from various mapping and environmental agencies such as Esri, NASA, USGS, and others. The map appears to be related to Benton County and provides spatial context for the partnership's activities.
XLSX
XLSX, Low priorityother
LowAI Summary for Site Summary Batch 3: This document is a site summary listing various bid IDs, landowners (operators), site names, projects, and construction timeframes. It includes details for multiple sites under different projects such as SB and BR, with construction timeframes noted as 'anytime (CRP)' or 'before/after crop season'. The document appears to be an informational summary related to site management or project planning, without solicitation or contract-specific details.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Notice of Request for Bid
Notice is hereby given that sealed bids will be received electronically before 3:00pm on Friday, January 10, 2025, for Edge of Field Projects-Batch 3 as requested by the City of Cedar Rapids Utilities Department. The City will only accept bids submitted through the City’s Online E-Procurement portal system (IonWave). Email, fax or hard copy Submittals are not acceptable.
Suppliers are solely responsible for correctly submitting their response into the electronic system (IonWave). The City bears no responsibility for delays or errors in submittal of response by the Supplier.
Bids will be opened on Friday, January 10, 2025 at 3:00pm CST (our clock).
Bids will be evaluated promptly after opening. After an award is made, a bid tabulation summary will be sent to all companies who submitted a bid. Bid results will not be given over the telephone or prior to award. Bids may be withdrawn any time prior to the scheduled closing time for receipt of bids; no bid may be modified or withdrawn for a period of sixty (60) calendar days thereafter.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award