Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

El Camino Memorial Park Secret Canyon

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves an amendment to Conditional Use Permit CUP No. 94-0312 for a 5.3-acre expansion of El Camino Memorial Park at 5600 Carroll Canyon Road in San Diego’s Mira Mesa community, within Council District 6. The expansion will add 4,500 new burial sites across two phases: Phase 1 includes construction of a bridge, extension of an access road, and grading of 1,000 burial areas; Phase 2 involves fine grading for the remaining 3,500 burial sites along with sod installation and irrigation systems. Additional infrastructure includes stormwater management features and improved sidewalks with curb ramps along Carroll Canyon Road. The site is zoned AR-1-1 and designated as Cemetery and Open Space under the adopted Mira Mesa Community Plan. No hazardous waste designations apply. The project is being administratively managed by the City of San Diego’s Department of Public Works, with Jeffrey Szymanski, Senior Planner, serving as the primary point of contact. The permit amendment is tied to environmental compliance under CEQA and requires adherence to mitigation measures for biological, cultural, and geological resources, including protections for the Coastal California gnatcatcher and Crotch’s bumble bee. The work must comply with specified technical standards, including ASTM D1557-91 for soil compaction and the California Green Building Standards Code. Key deliverables include monitoring exhibits, consultant qualification letters, and documentation of compliance with permits from the California Department of Fish and Wildlife, such as a Streambed Alteration Agreement and an Incidental Take Permit. Pre-construction requirements include a mandatory meeting attended by the permit holder, superintendent, biologist, archaeologist, and Native American monitor, ten working days before any ground disturbance. All personnel must submit qualification letters and any substitutions require prior written approval. Monitoring obligations include reporting field discoveries by 8:00 a.m. the next business day and submitting a draft monitoring report within 90 days of completion. The City retains the right to recover administrative and monitoring costs and may require surety instruments to ensure long-term mitigation compliance. The public comment period for the Draft Mitigated Negative Declaration closed on August 25, 2025, and while no formal contract value, pricing structure, or federal acquisition regulations are provided, the project is governed by stringent environmental, engineering, and procedural requirements tied to municipal land-use permitting rather than traditional federal procurement mechanisms.

General Info

Amend CUP for 5.3-acre cemetery expansion adding 4,500 burial sites with infrastructure, environmental compliance, and strict monitoring requirements.

Agency

California → City of San Diego

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Mira Mesa Boulevard and Pacific Heights Boulevard- 5600 Carroll Canyon Road, San Diego CA, San Diego, CA, 92121

Set-Aside

NONE

Documents

(16)

El Camino Memorial Park Secret Canyon Floodplain Analysis Technical Memorandum B803

PDFtechnical-memorandum

Draft Mitigated Negative Declaration for El Camino Memorial Park Secret Canyon Project

PDFmitigated-negative-declaration

El Camino Memorial Park Secret Canyon Project Archaeological Resources Report August 2021

PDFarchaeological-resources-report

Archaeological Resources Report - El Camino Memorial Park Phase 2

PDFarchaeological-report

Climate Action Plan Consistency Checklist for El Camino Memorial Park CUP Amendment

PDFchecklist

El Camino Memorial Park Geological and Geotechnical Investigation Response Letter

PDFgeotechnical-report

Hydrology Study for El Camino Memorial Park Secret Canyon Expansion

PDFstudy-report

Summary Form for Electronic Document Submittal - El Camino Memorial Park Secret Canyon

PDFenvironmental-summary

Notice of Completion for El Camino Memorial Park Secret Canyon Expansion

PDFnotice-of-completion

El Camino Memorial Park Secret Canyon Project Biological Technical Report September 2024

PDFbiological-technical-report

Final Mitigated Negative Declaration for El Camino Memorial Park Secret Canyon Project

PDFmitigated-negative-declaration

Notice of Availability - Draft Mitigated Negative Declaration for El Camino Memorial Park Expansion

PDFspecial-notice

Notice of Completion for El Camino Memorial Park Secret Canyon

PDFnotice-of-completion

El Camino Memorial Park Geological and Geotechnical Investigation Response Letter

PDFgeotechnical-report

El Camino Memorial Park Secret Canyon Project Biological Technical Report September 2024

PDFbiological-technical-report

Hydrology Study for El Camino Memorial Park Secret Canyon Expansion

PDFstudy-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A
Contacts
Jeffrey SzymanskiSenior Planner

Full Description

Show more
An amendment to CONDITIONAL USE PERMIT (CUP; CUP No. 94-0312) for a 5.3-acre expansion within the 212-acre El Camino Memorial Park located at 5600 Carroll Canyon Road (Assessor's Parcel Number [APN] 341-040-36-00) in the Mira Mesa community within Council District 6. The proposed project involves the expansion of the existing El Camino Memorial Park to provide 4,500 new burial sites, a bridge, an access road, storrnwater management features, and main entrance sidewalk and curb ramp improvements along the project's frontage on Carroll Canyon Road. The project is proposed in two phases with Phase 1 consisting of the bridge and roadway extension as well as grading of 1,000 burial areas, and Phase 2 consisting of fine grading for 3,500 burial sites and sod/irrigation placement. The project site is designated Cemetery and Open Space in the Mira Mesa Community Plan (adopted by City Council on December 5, 2022) and is zoned AR-1-1 (Agricultural-Residential Zone). The site is not included on any Government Code listing of hazardous waste site.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Environmental & Archaeological AssessmentThe contract encompasses a comprehensive environmental and archaeological assessment to support permitting under the National Environmental Policy Act and Section 106 of the National Historic Preservation Act. It requires the performance of a Phase I Environmental Site Assessment to identify potential contamination, a wetland delineation to determine the extent and boundaries of wetland areas, and archaeological surveys to evaluate the presence of culturally significant resources. These activities are essential for documenting environmental and historical conditions prior to any proposed development or infrastructure projects in Dawson County, Georgia. The work must be conducted in accordance with federal regulatory standards to ensure compliance and facilitate the permitting process. This is a subcontract opportunity posted by the Development Authority of Dawson County, with a response deadline of September 7, 2026. The North American Industry Classification System code 541620 indicates the work falls under environmental consulting services. The performance location is within Georgia, though specific site details are not provided. Interested parties must submit proposals by the stated deadline to be considered, and all activities are intended to support regulatory compliance and due diligence for future development initiatives in the region.
Development Authority of Dawson County

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Environmental Compliance and MonitoringThe contract involves comprehensive environmental compliance and monitoring services focused on stormwater management, erosion control oversight, and regulatory reporting throughout the construction phase. The work is tied to a project under the Haralson County School District in Georgia and requires adherence to established environmental regulations, ensuring that construction activities do not negatively impact surrounding ecosystems or water resources. The contractor will be responsible for implementing and maintaining effective erosion and sediment control measures, conducting regular site inspections, documenting compliance efforts, and submitting required reports to regulatory authorities as needed. This subcontract is categorized under NAICS code 541620, which corresponds to environmental consulting services, indicating a professional scope centered on technical environmental management rather than physical construction. The solicitation was posted on August 7, 2026, with a response deadline set for September 9, 2026, providing interested parties a limited window to submit proposals. Performance is expected to occur in Georgia under the jurisdiction of the Haralson County School District, though specific site locations are not detailed in the provided data. The contract emphasizes continuous regulatory alignment and accurate documentation, making it critical that the selected vendor has demonstrated expertise in environmental monitoring and compliance reporting within construction environments.
Haralson County School District

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
PACP and MACP Pipeline Condition AssessmentThis contract requires the standardized coding and reporting of pipeline and manhole defects in accordance with NASSCO’s Pipeline Assessment Certification Program (PACP) and Manhole Assessment Certification Program (MACP) protocols. All condition assessments must follow these industry-recognized guidelines to ensure accurate, consistent, and defensible data collection for infrastructure evaluation and maintenance planning. The work is part of a larger infrastructure project under SAK Construction, LLC, and performance is expected to adhere to strict quality control measures aligned with national best practices for utility asset management. The solicitation is designated as a subcontract under the Small Business Administration’s set-aside programs, with eligibility limited to Small Business, Small Disadvantaged Business, Women-Owned Small Business, Veteran-Owned Small Business, Alaskan Native Corporations, Indian Tribes, and Disadvantaged Business Enterprises certified under the Department of Transportation’s DBE program. The NAICS code 541620 categorizes this as an engineering services contract, confirming the technical nature of the condition assessment work. The response deadline is September 10, 2026, and the performance location is tied to the SARP10 Humphreys Blvd CIPP project in Memphis, Tennessee, though specific site details are not fully defined in the provided data.
SAK Construction, LLC

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541620
New
SLED
Quality Assurance and Compliance Testing (Environmental/Chemical)The contract requires third-party testing and verification of brine salt to ensure full compliance with TxDOT CAT 8C-B specifications, focusing on critical parameters such as concentration, purity, and corrosion characteristics. This work is essential for confirming that the brine salt meets the stringent environmental and chemical standards mandated by the Texas Department of Transportation for use in transportation infrastructure applications. The testing must be conducted by qualified external laboratories with proven expertise in chemical analysis and environmental compliance to guarantee accurate, reproducible results aligned with state requirements. The solicitation is classified as a subcontract under NAICS code 541620, indicating it involves scientific and technical testing services. It is posted under the Texas SmartBuy portal with a response deadline of September 1, 2026, allowing potential bidders sufficient time to prepare detailed proposals demonstrating their technical capability, equipment certification, and experience with similar transportation-related materials testing. The place of performance and point of contact details are unspecified, but all work must align with Texas Department of Transportation's operational and regulatory expectations, ensuring the brine salt used in state projects remains safe, effective, and environmentally compliant.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 24 days
View Details
NAICS: 541620
New
SLED
Erosion Control and Stormwater ManagementThe contract pertains to erosion control and stormwater management activities required during and after construction projects under the jurisdiction of the Texas Department of Transportation. It encompasses the installation and maintenance of best management practices such as silt fences, sediment basins, inlet protection structures, and related measures designed to prevent sediment runoff and protect water quality. The work must be performed in accordance with state and federal environmental regulations to mitigate the impact of construction on surrounding ecosystems and waterways. All activities are to be completed within the designated project areas, with strict adherence to timelines and performance standards. The contract is classified as a subcontract and is open for bids with a response deadline of September 2, 2026. It falls under the NAICS code 541620, indicating it involves environmental consulting and related services. The solicitation was posted on August 7, 2026, and is accessible through the Texas SmartBuy portal. While specific performance locations and contact details are not provided, the work is expected to occur across various Texas transportation construction sites. Contractors must demonstrate experience in implementing erosion and sediment control systems and be prepared to provide documentation and inspections to verify compliance with established environmental protocols.
Texas Department of Transportation

POSTED

about 20 hours ago

DEADLINE

in 25 days
View Details