Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on August 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

El Toyon Park Power Pedestals Project

Closed
20260826002State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
The US Immigration and Customs Enforcement (ICE) is soliciting a Firm-Fixed-Price task order under an 8(a) MACC IDIQ for the replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The project involves the removal of old units and the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures to resist salt air corrosion. The scope includes the installation of two NEMA 3R automatic transfer switches, integration with existing fuel and electrical systems, and the performance of load bank testing. The estimated contract value is between $250,000 and $300,000, with a total period of performance of 270 calendar days from the Notice to Proceed. Award will be based solely on the lowest total evaluated price, provided the offeror demonstrates a sound technical approach and a viable plan to manage labor and material constraints on the island. Contractors must comply with the Buy American Act and adhere to Davis-Bacon prevailing wage rates as specified in wage determination PR20260001. Key requirements include the provision of performance and payment bonds, strict adherence to NFPA 70 and IBC codes, and the completion of DHS non-disclosure agreements and security clearances for personnel. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
SLED
LED Lighting and Occupancy Sensor Upgrades DRAFT
Solicitation # 872291
The Bristol Alliance of Companies is soliciting a Firm-Fixed-Price task order under a MACC multiple-award IDIQ contract to upgrade the LED lighting and occupancy sensors at the Buffalo Federal Detention Facility in Batavia, New York. The project scope encompasses all engineering, labor, equipment, and materials required to install energy-efficient LED fixtures and occupancy sensors, as well as the removal and disposal of existing fluorescent fixtures, lamps, and ballasts. The estimated contract value is between $2 million and $2.3 million, with a period of performance of 180 calendar days from the notice to proceed. The award will be based solely on the lowest total evaluated price. Key deliverables include a Quality Control Plan due within 15 days of award, a site survey within 30 days, and a final closeout package featuring as-built drawings and an 18-month warranty for labor and materials. Contractors must comply with Davis-Bacon wage determinations, ADA, OSHA, and NFPA standards. Technical requirements include a comprehensive commissioning report verifying 100 percent fixture operation and a minimum two-hour training session for facility maintenance personnel. Proposals must be submitted via email to the contracting officer and specialist, including a detailed pricing template broken down by CSI division.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This firm-fixed-price task order, issued by the Bristol Alliance of Companies for US Immigration and Customs Enforcement (ICE), involves the provision and installation of two 40-foot steel FLEXTAINER conex offices at the HSI Facility in St. Thomas, US Virgin Islands. These units are designed for forensic science technicians and must include two split-system A/C units, a steel door with a Cypher lock, four security windows, R-11 insulation, vinyl flooring, LED lighting, and a 5-pound ABC fire extinguisher. The infrastructure requirements include the installation of two 42 by 10 by 6-inch reinforced concrete slabs (3k PSI) and electrical connection to the nearest circuit via 2-inch PVC or uPVC conduit. The estimated magnitude of the project is between 250,000 and 300,000 dollars, with a period of performance of 364 calendar days from the Notice to Proceed. The award will be based on the lowest total evaluated price, considering technical approach, safety and quality control, and price. Contractors must comply with the Buy American Act, adhere to the VI20260001 wage determination for prevailing wages, and ensure all personnel sign a DHS Non-Disclosure Agreement. Key administrative requirements include submitting payment requests through the Invoice Processing Platform (IPP) accompanied by certified payroll and conducting a mandatory site survey prior to proposal submission. All work must meet NFPA 70 and International Building Code standards, with the contractor remaining responsible for daily waste removal and the provision of detailed shipping notifications and packing slips.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 18 days
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management and Training Corporation (MTC) is soliciting subcontractor bids for a fixed-price, single lump sum contract to correct fire alarm deficiencies at the Inland Empire Job Corps Center in San Bernardino, California. The scope of work includes the installation of SD500-PS and Notifier BNG-1 manual pull stations, the installation of Cooper Wheelock HSW and Model 757-3A-T horn/strobe notification appliances, and the replacement of six existing fire alarm bells with Cooper Wheelock HSW horn/strobe appliances. All new devices must be integrated into the existing fire alarm system and undergo complete functional testing. The project must be completed within 90 consecutive business days following the written Notice to Proceed, with work beginning within five business days of an agreed-upon start date. Bids are due by September 16, 2026, and will be evaluated based on overall best value. Requirements for submission include the MTC Bid for Lump Sum Contract form, a detailed cost breakout on company letterhead, and a mandatory physical site visit. For bids of $25,000 or more, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wage determinations and weekly certified payroll reporting. Additionally, contractors must provide a Unique Entity ID (UEI) upon receipt of an Intent to Award letter and submit a complete MTC Supplier Packet, including a W-9 and self-certification. Final acceptance is contingent upon a two-stage inspection process involving a substantial completion punch list and a final inspection approved by center and government representatives.
Inland Empire Job Corps

POSTED

about 4 hours ago

DEADLINE

in 6 days

General Info

Agency

California → City of National CityView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

National City, CA, 91950, USA

Set-Aside

NONE

Documents

(16)

EL TOYON PARK POWER PEDESTALS PROJECT - Iran Contracting Act Certification

PDF1 pagecertification

EL TOYON PARK POWER PEDESTALS PROJECT CIP 25-19 - Designation of Subcontractors

PDF2 pagessubcontractor-designation

City of National City - Standard Traffic Control Acknowledgment

PDF5 pagesacknowledgment

El Toyon Park Proposition 68 Grant Power Pedestals CIP 22-XX

PDF9 pagessow

El Toyon Park Power Pedestals Project CIP 25-19 Bid Security Form

PDF2 pagesbond-form

CIP 25-19 Economic Sanctions Certification

PDF2 pagescertification

El Toyon Park Power Pedestals Project Owner-Contractor Agreement

PDF14 pagescontract-document

El Toyon Park Power Pedestals Project close-out documents

PDF5 pagesother

EL TOYON PARK POWER PEDESTALS PROJECT CIP 25-19 - Pledge of Compliance

PDF1 pageother

EL TOYON PARK POWER PEDESTALS PROJECT CIP 25-19 - Post Bid Documents Package

PDF17 pagesq-and-a

CIP 2519 Appendix 5 – Electrical Specifications

PDF52 pagessow

CIP 25-19 El Toyon Park Power Pedestals Bid Documents

PDF150 pagesifb

EL TOYON PARK POWER PEDESTALS PROJECT CIP 25-19 Verification and Execution

PDF1 pagebid-form

Report 10567-1 (R1) - 20' Lighting Pole Foundation Design

PDF25 pagessow

EL TOYON PARK POWER PEDESTALS PROJECT CIP 25-19 - Non-Collusion Affidavit

PDF1 pageaffidavit

Certified Payroll Guidelines and Reporting Forms

PDF12 pagesguidelines

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of National City
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of National City
View Agency Profile
Office AddressN/A
Contacts
Luca Zappiello
Stephen Manganiello

Full Description

Show more
Bid #CIP 25-19: The project involves the construction of electrical pedestals and associated infrastructure at El Toyon Park. The scope includes excavation, trenching, backfill, compaction, concrete and asphalt repair, conduit installation, circuiting, concrete pad installation, power pedestals installation, connections, commissioning, and restoration of all disturbed areas. Additionally, the project requires the installation of one solar light, including its foundation. The contractor is responsible for all material, labor, and warranty for the specified work items.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS