Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Electric Vehicle Supply Equipment Project at CAL TRANS HQ Division of Equipment

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the installation of Electric Vehicle Supply Equipment infrastructure at the Caltrans District 3 HQ in Marysville/Sacramento, California, to support future dual-port, pedestal-mounted Electric Vehicle Charging Stations. While the actual charging stations will be installed separately at a later date, this phase focuses on preparing the site with all necessary supporting elements including buried conduits, fixed bollards, wheel stops, and new electrical wiring to deliver power from an existing onsite source. Four dedicated parking stalls will be clearly marked with stenciling, restriping, and signage to designate them for exclusive electric vehicle use. The work includes pavement saw cutting, trenching, backfilling, and full restoration of the lot surface to its original condition after installation. All activities will strictly comply with local, state, and federal regulations, and waste disposal will be handled in accordance with environmental and safety standards. The project is managed by Caltrans District 3 with Peter Hendrix, P.E., as the primary point of contact.

General Info

Install EV infrastructure with conduits, wiring, bollards, and signage for four dedicated stalls at Caltrans District 3 HQ.

Agency

California → Caltrans, District 3 - Marysville/Sacramento

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

1403 Furneaux, CA, 95961

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 3 - Marysville/Sacramento
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 3 - Marysville/Sacramento
Office AddressN/A
Contacts
Peter HendrixZEVI Deputy Division Chief

Full Description

Show more
The project consists of installing the Electric Vehicle Supply Equipment (EVSE) infrastructure for fleet vehicles use. This initiative is designed to create a fully operational system that will eventually support two dual ports, pedestal-mounted Electric Vehicle Charging Stations (EVCS). Note that the installation of the EVCS themselves is outside our current scope and may be handled by others at a later date. As part of this project, four parking stalls will be specially stenciled and restriped. Clear signage will be installed to indicate that these stalls are reserved for electric vehicle use, ensuring easy identification and proper use The project involves the installation of buried conduits, fixed bollards, wheel stops, and new electrical equipment, including all necessary wiring, to deliver a complete and functional system. Electrical power for the EVSE will be drawn from an existing source already available at the site. All aspects of the work, including waste disposal, will be conducted in strict compliance with all applicable laws, regulations, and ordinances. The work will involve pavement saw cutting, trenching, backfilling, and restoring the affected lot surface to its original condition once the installation is complete.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
MAIN GROUNDING ELECTRODE
Solicitation # WL-26-006
The Woodland Job Corps Center, operated by Adams and Associates, Inc. for the U.S. Department of Labor, is soliciting a licensed electrical contractor to inspect and repair grounding systems across multiple campus buildings in Laurel, Maryland. The scope of work, identified as WL-26-006, includes the Aspen Dorm, Vocational Building, Willow Hall, Holly Dorm, Maple Dorm, and Oak Dorm, as well as necessary corrections to the Administration Building. All work must comply with NEC 2023, 250 standards, as well as EPA, OSHA, and Maryland state regulations. Technical requirements include the installation of #2/0 awg conductors, 16x2 inch ground bars, 8-foot ground rods with 6-foot separation, and the use of 3/4 inch EMT conduit for routing. This is a single lump sum contract with proposals due by September 3, 2026. Award decisions will be based on best value, weighted by price (60%), quality (20%), past performance (10%), and schedule (10%). Bidders must provide a detailed cost breakdown, a valid Maryland contractor's license, and proof of comprehensive insurance, including general liability of at least 1 million dollars per occurrence. The contractor must start work within 14 days of the Notice to Proceed and provide a one-year workmanship guarantee. Final payment is contingent upon the submission of a completed SF 1413, release of liens, and the successful completion of a final acceptance inspection. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB.
Adams & Associates\ Woodland Job Corps Center

POSTED

about 18 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238210
New
PANELBOARDS
Solicitation # WL – 26 -0004
This solicitation, identified as WL-26-0004, is for a single lump sum contract to perform electrical panelboard repairs and labeling at the Woodland Job Corps Center in Laurel, Maryland, operated by Adams and Associates for the U.S. Department of Labor. The scope of work requires the provision of non-handwritten circuit directories for buildings E, F, G, K, and M, the reinstallation of a panelboard cover in the welcome center mechanical room, and specific fire alarm control panel identification at the Oak Dormitory, including UL listed red mark labels and updated panel schedules. All work must comply with NEC 2023, OSHA, EPA, and Maryland state regulations. The performance period is scheduled from May 11, 2026, through December 31, 2026. Proposals are due by September 3, 2026, and must be submitted on company letterhead including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Maryland contractor's license. Attendance at the mandatory bid conference is required for consideration. Award will be based on best value, weighing technical quality and price. The contractor must provide comprehensive insurance coverage, including general liability of at least 1 million dollars per occurrence, and guarantee all workmanship for one year. Final payment is contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens from all subcontractors and suppliers.
Adams & Associates\ Woodland Job Corps Center

POSTED

about 18 hours ago

DEADLINE

in 5 days
View Details
NAICS: 238210
New
Wind River Job Corps: LAWN EQUIPMENT STORAGE ROOM VENTILATION
Solicitation # wind-river-job-corps-lawn-equipment-storage-room-ventilation
Arbor E & T, LLC dba Equus Workforce Solutions is seeking bids for a subcontracting opportunity to remediate a life safety deficiency at the Wind River Job Corps Center in Riverton, Wyoming. The project involves installing mechanical ventilation in a lawn equipment storage room to mitigate dangerous fuel vapor accumulation. The scope of work includes creating an 18-inch by 18-inch rough opening in an exterior concrete block wall, installing one wall-mounted explosion-proof exhaust fan capable of 600 CFM mounted 15 feet above the floor, and installing two 18-inch by 24-inch door-mounted ventilation louvers. Additionally, the contractor must provide approximately 90 linear feet of conduit and wiring for a 208 volt, 1 phase, 1/3 HP motor designed for continuous operation. All electrical work must adhere to the National Electrical Code, and contractors must follow Lockout/Tagout procedures and use standard commercial PPE. This is a fee-for-service solicitation under NAICS code 238210, with a size standard of 19 million dollars. The award will be based on best value, as determined by Equus. Bidders must submit a price quote on the provided bid sheet, a vendor self-certification form, and signed terms and conditions by September 2, 2026, at 2:00 PM MST. The contract is subject to the Service Contract Act, requiring compliance with Wage Determination No. 2015-5407 Revision 28 for Wyoming. Key federal requirements include adherence to FAR clauses regarding the Combating Trafficking in Persons, Small Business Program representations, and insurance for work on government installations. Final acceptance requires the storage room to be swept clean of debris and surfaces wiped down to return the space to a fully operational state.
EQUUS Workforce Solutions operator of the Wind River Job Corps

POSTED

about 18 hours ago

DEADLINE

in 4 days
View Details
NAICS: 238210
New
Electrical Repair Services
Solicitation # Electrical Services 8-2026
Management & Training Corporation, acting on behalf of the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract to provide various electrical repair services at the Centennial Job Corps Center in Nampa, Idaho. The solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certified entities. Bids must be submitted via email to Sandra Clore by August 31, 2026, at 3:00pm MST. A pre-bid meeting was scheduled for August 21, 2026. The scope of work includes all electrical services, incidental work required by building codes, and the acquisition of necessary permits. Awardees must provide a one-year written guarantee of workmanship and deliver comprehensive operation and maintenance manuals upon substantial completion. Financial and compliance requirements are stringent, with a mandatory bid bond of 20% and subsequent performance and payment bonds required for bids equal to or exceeding $25,000. The contract is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll and adherence to the provided wage determination for Idaho. Bidders must provide a detailed cost breakout on company letterhead covering labor, materials, equipment, and overhead. Payment is handled through progress payments using AIA G702 and G703 forms, contingent upon the submission of a Schedule of Values. Additionally, contractors must comply with federal security and privacy regulations, including mandatory DOL training and strict data breach liability protocols.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 18 hours ago

DEADLINE

in 2 days
View Details