Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Electrical and Civil Engineering Design involves providing specialized design and engineering services for prime contractors working on Etihad Water & Electricity projects in the United Arab Emirates. The scope of work focuses on detailed engineering for 132/11kV substations, cable routing, and LILO connection design, requiring the use of CAD/BIM software and electrical modeling tools to deliver approved design packages, technical specifications, and engineering drawings. To qualify, providers must hold professional engineering licensure and ensure all deliverables strictly adhere to EtihadWE standards. The solicitation was posted on November 16, 2026, with a response deadline of December 14, 2026.

General Info

Electrical and civil engineering design for Etihad Water & Electricity substations in UAE.

Place of Performance

ARE

Set-Aside

NONE

Documents

This scope was carved out of 314E/2026.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

314E-2026 132-11 kV MAIN SUBSTATIONS AT AJMAN CITY (ACMN) IN AJMAN AREA AND 132-11 KV AWAFI (AWMN) IN RAK AREA, AND 132KV UNDERGROUND CABLING WORKS

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 27 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom 314E-2026 132-11 kV MAIN SUBSTATIONS AT AJMAN CITY (ACMN) IN AJMAN AREA AND 132-11 KV AWAFI (AWMN) IN RAK AREA, AND 132KV UNDERGROUND CABLING WORKS
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyEtihad Water & Electricity
ContactsNo contacts available
OfficeN/A
Organization / AgencyEtihad Water & Electricity
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs design and engineering for prime contractors on Etihad Water & Electricity (EtihadWE) projects. Provides detailed engineering for 132/11kV substations, cable routing, and LILO connection design. Utilizes CAD/BIM software and electrical modeling tools. Requires professional engineering licensure and adherence to EtihadWE standards. Delivers approved design packages, engineering drawings, and technical specifications.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
SLED
Western Placerville Interchanges Phase 2.3 - Design & Env RFP Final Complete
Solicitation # 20261113026
The City of Placerville is soliciting proposals from qualified engineering firms for the Western Placerville Interchanges Phase 2.3 Project, specifically focusing on the US 50 Westbound Off-Ramp at Ray Lawyer Drive. The scope of work encompasses the full project lifecycle, from Project Approval and Environmental Document (PA&ED) through Plans, Specifications, and Estimate (PS&E), Right-of-Way Certification, bid support, and design support during construction. Key objectives include constructing a new westbound off-ramp, improving the intersection at Ray Lawyer Drive, and enhancing bicycle and pedestrian facilities. The project is located on the State Highway System, funded by State Transportation Improvement Program (STIP) funds, and will be delivered by the City under Caltrans oversight. The selected consultant must adhere to rigorous Caltrans and City of Placerville standards, including CEQA and NEPA environmental revalidation and the Caltrans Workplan Standards Guide WBS. Payment will be structured as actual cost plus a fixed fee, with progress payments made monthly. To avoid organizational conflicts of interest, the selected firm and its subconsultants are prohibited from providing construction management services. Proposals must be submitted by December 7, 2026, consisting of a technical proposal and a separate sealed cost proposal. Award decisions will be based on a 50/50 weighted split between the written proposal score and an interview score for short-listed firms.
City of Placerville

POSTED

about 4 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541330
New
SLED
RFP27-016 Countywide Bicycle & Pedestrian Master Trails Plan
Solicitation # RFP27-016
The Board of Commissioners of Glynn County, Georgia, is soliciting proposals for a Countywide Bicycle and Pedestrian Master Trails Plan covering the Brunswick Area Transportation Study Metropolitan Planning Area, including St. Simons Island and unincorporated Glynn County. The project involves professional planning, analysis, and public engagement to identify network gaps and develop concept-level recommendations for 10 to 20 priority projects. Key deliverables include a scored ranked segment database, a prioritized network gap inventory, a Priority Projects Technical Memorandum with planning-level cost estimates, and a Policy Audit Matrix. All work must comply with FHWA regulations, 2 CFR Part 200, and environmental standards including the Clean Air Act and Clean Water Act. Proposals are evaluated based on practical merit and price, with a technical ranking performed before fee negotiations. The highest-ranked proposer will negotiate the final scope and fee, which is compared against the County's independent cost estimate. Applicants must provide GDOT prequalification documentation, a SAM.gov unique entity ID, and certifications regarding EEO practices and anti-lobbying. Technical requirements include strict GIS data standards using NAD 1983 State Plane Georgia East and the delivery of Esri file geodatabase feature classes. Proposals must be submitted via the County's eProcurement Portal by December 17, 2026.
Glynn County Board of Commissioners

POSTED

about 5 hours ago

DEADLINE

in about 1 month
View Details

More opportunities from Etihad Water & Electricity

Same awarding agency

NAICS: 237130
New
International
314E-2026 132-11 kV MAIN SUBSTATIONS AT AJMAN CITY (ACMN) IN AJMAN AREA AND 132-11 KV AWAFI (AWMN) IN RAK AREA, AND 132KV UNDERGROUND CABLING WORKS
Solicitation # 314E/2026
Etihad Water & Electricity has issued solicitation 314E/2026 for a lump-sum turnkey project involving the design, engineering, supply, construction, installation, testing, and commissioning of 132/11kV main substations and associated 132kV underground cabling works in the United Arab Emirates. The scope of work is divided into several key components, including the construction of new main substations at Ajman City (ACMN) and Awafi (AWMN), protection modifications for BYMN-SAMN, and LILO connections for both ACMN and AWMN. Additionally, the project includes approximately 22 km of new 132kV underground cabling works for BYMN-SAMN and approximately 5 km of LILO connections for AWMN. Eligible bidders must be registered in the SAP Ariba e-procurement system and hold a valid EtihadWE Prequalification Certificate, a requirement that also extends to all proposed subcontractors for electrical, civil, MEP, and underground cable works. Proposals must be submitted via SAP Ariba with separate technical and commercial uploads by December 14, 2026. Each quoted lot must be accompanied by an irrevocable and unconditional bank guarantee issued by a UAE-based bank, valid for at least 180 days from the tender opening date. All works must adhere to EtihadWE standards and specifications.
Power and Communication Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 27 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS