Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Electrical and Control Systems Integration

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Ballico-Cressey School DistrictView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

Cressey, CA, 95312, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260724001.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Cressey Elementary School Water System Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Ballico-Cressey School District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Ballico-Cressey School District
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install electrical wiring, control panels, instrumentation, and monitoring systems for tank, treatment unit, and site operations.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
MAIN GROUNDING ELECTRODE
Solicitation # main-grounding-electrode
The Woodland Job Corps Center, operated by Adams and Associates, Inc. for the US Department of Labor, is soliciting a single lump sum contract for a licensed electrical contractor to inspect and repair grounding systems at multiple campus buildings in Laurel, Maryland. The scope of work includes the Aspen Dorm, Vocational Building, Willow Hall, Holly Dorm, Maple Dorm, and Oak Dorm, as well as the Administration Building. Technical requirements specify the installation of #2/0 awg conductors from underground copper water pipes, 16x2 inch ground bars, two 8-foot ground rods with 6-foot separation, and the use of 3/4 inch EMT conduit. All work must adhere to NEC 2023, 250, as well as EPA, OSHA, and Maryland state regulations. Proposals are due by September 3, 2026, and must be submitted on company letterhead to Purchasing Manager Audrey Davis. Bidders must provide a detailed cost breakdown for labor, materials, and equipment, along with a valid Maryland Contractor's License, insurance certificates, and a 90-day bid guarantee. Award selection is based on best value, weighted by price (60%), quality (20%), past performance (10%), and schedule (10%). The successful contractor must start work within 14 days of the Notice to Proceed and provide a one-year workmanship guarantee. Payment terms are Net 30, and final payment is contingent upon the delivery of a completed SF 1413, release of liens, and surety of final payment.
Adams & Associates\ Woodland Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 17 days
View Details
NAICS: 238210
New
PANELBOARDS
Solicitation # WL – 26 -0004
This solicitation, identified as Scope of Work ID WL-26-0004, is for electrical repairs and labeling of panelboards at the Woodland Job Corps Center in Maryland, operated by Adams and Associates, Inc. for the US Department of Labor. The project requires the provision of non-handwritten circuit directories for Buildings E, F, G, K, and M, the installation of UL listed red mark labels and updated panel schedules for the fire alarm control panel at the Oak Dormitory, and the reinstallation of a panel cover in the welcome center mechanical room. All work must comply with NEC 2023, OSHA, EPA, and applicable state and local codes. The performance period is scheduled from May 11, 2026, through December 31, 2026. The contract will be awarded as a single lump sum based on a best-value determination considering both quality and price. Bidders must attend a mandatory bid conference and submit typed proposals on company letterhead by September 3, 2026, including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Maryland Contractor's License. Requirements include specific insurance coverages for general liability, automobile liability, and workers' compensation, as well as certification of compliance with Service Contract Labor Standards. Final payment is contingent upon the submission of certified payroll records, a completed SF 1413, and the release of liens from all subcontractors and suppliers.
Adams & Associates\ Woodland Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 18 days
View Details
NAICS: 238210
New
Electrical Repair Services
Solicitation # Electrical Services 8-2026
The Management and Training Corporation (MTC), acting for the U.S. Department of Labor, is soliciting bids for a fixed-price, single lump sum contract to provide various electrical repair services at the Centennial Job Corps Center in Nampa, Idaho. This opportunity is set aside for small businesses and various socio-economic categories, including SDB, WOSB, HUBZone, and SDVOSB. Interested bidders must attend a pre-bid meeting on August 21, 2026, and submit their proposals via email to Sandra Clore by August 31, 2026, at 3:00pm MST. The scope of work includes all electrical services detailed in the Construction Bid Package, requiring the contractor to manage all building permits, incidental work per building codes, and provide a one-year written guarantee of workmanship. The contract mandates strict adherence to Construction Wage Rate Requirements (formerly Davis-Bacon Act) and requires weekly certified payroll. For bids equal to or exceeding $25,000, a bid bond of 20% is required, as well as performance and payment bonds from a surety with at least an A- rating. Bidders must provide a comprehensive cost breakout on company letterhead, itemizing materials, labor, equipment, and overhead. Payment will be made via progress payments using AIA G702 and G703 forms, contingent upon the submission of a Schedule of Values and the acceptance of work by MTC or the Government. Additionally, the contractor must comply with rigorous information security and privacy training requirements, with liability for data breaches including the cost of credit monitoring for affected individuals.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 15 days
View Details

More opportunities from California → Ballico-Cressey School District

Same awarding agency

NAICS: 237110
SLED
Cressey Elementary School Water System Project
Solicitation # 20260724001
The project at Cressey Elementary School involves the comprehensive installation of a new water treatment and distribution system, including a granular activated carbon (GAC) treatment system, a 10,000-gallon welded steel water storage tank, a pump skid with enclosure, chain link fencing, concrete pads, associated piping, and electrical systems, all to be integrated with the existing water distribution infrastructure. Work must be conducted in strict compliance with specified industry standards such as ASTM, ACI, ANSI, AWWA, and NSF 61, ensuring material integrity and potable water safety. All materials must be new and delivered in appropriate packaging with clear labeling of manufacturer details, batch numbers, expiration dates, and handling instructions. The contractor is responsible for all aspects of construction, including site preparation, demolition of existing infrastructure, and final connection to the school’s water system, with no relief from responsibility even if inspections are conducted by the district or other oversight entities. The contract follows a Lowest Price Technically Acceptable (LPTA) award methodology, meaning the lowest-priced bid that meets all mandatory technical requirements will be selected. Bidders must submit a detailed construction schedule using the Critical Path Method within 14 days of award and comply with stringent documentation requirements, including certified test reports, calibration records, sample calculations, raw data sheets, and system layout drawings. Key certifications are required, including DIR registration, workers’ compensation insurance, a non-collusion affidavit, and California VOC compliance, with violations leading to immediate disqualification. The contractor must maintain an on-site office, provide a qualified independent testing laboratory, conduct continuous special inspections for anchor installations, and offer no-cost training to district personnel upon completion. Security, environmental compliance, ADA adherence, and permit acquisition are the contractor’s sole responsibility, and all work must be completed at the project site in Cressey, California, with final acceptance occurring only after successful field testing and approval by the construction manager or engineer. No federal contracting personnel, accounting codes, or electronic invoicing systems like WAWF are referenced, indicating a state/local public works procurement governed by California-specific procedures and standards.
Water and Sewer Line and Related Structures Construction

POSTED

20 days ago

DEADLINE

in 17 days
View Details