Electrical and Control Systems Integration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Electrical and Control Systems Integration subcontract, issued by the City of Bellflower in California, focuses on critical infrastructure upgrades at a substation. The scope of work involves the installation of electrical wiring and control panels, as well as the seamless integration of the treatment system with the existing utility infrastructure. Classified under NAICS code 238210, the project is located in Bellflower, zip code 90706. The contract was posted on October 28, 2025, and is managed through the California Environmental Quality Act network.
General Info
Agency
Place of Performance
Bellflower, CA, 90706Set-Aside
Documents
This scope was carved out of CU 25-05.
The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.
Conditional Use Permit Case No. CU 25-05
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Read the full solicitation package
This scope is part of a larger contract. Its documents live on the prime.
- 1 document on the prime contractFrom Conditional Use Permit Case No. CU 25-05
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
