Electrical and Control Systems Integration
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the full scope of electrical infrastructure development for lift stations, including the installation of wiring, conduit systems, and junction boxes, along with the integration of pump controls and monitoring systems to ensure reliable and automated operation. All work must comply with industry standards for hazardous and wet environments, with emphasis on scalability, durability, and seamless communication between mechanical and control components. The project is structured as a subcontract under NAICS code 238210, targeting specialized electrical contracting services for water and sewer infrastructure. The solicitation was posted by the Henry County Water and Sewer Authority in Georgia with a response deadline of August 6, 2026, and is open for submission through the state’s procurement portal. There is no set-aside designation specified, indicating the opportunity is open to all qualified subcontractors regardless of business size or certification status. Work will be performed at unspecified locations within the authority's service area, and bidders are expected to demonstrate proven experience in municipal water system electrical upgrades, control system integration, and compliance with safety and environmental regulations. Proper documentation of equipment specifications, installation methodologies, and testing protocols will be required for award consideration.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
