Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Electrical Building and Standby Generator Installation

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves the installation of standby generator systems, encompassing all critical components such as fuel supply, exhaust systems, transfer switches, grounding, and conduit routing. The primary focus is on the electrical infrastructure required to support reliable backup power, with building construction considered secondary to the core systems being installed. This work is part of a broader effort to ensure operational continuity and safety through robust electrical backup capabilities. The solicitation is classified as a subcontract under NAICS code 238210, which pertains to electrical contracting services, and is designated for Disadvantaged Business Enterprises (DBE) under the Department of Transportation's set-aside program. The contract was posted on August 4, 2026, with responses due by August 19, 2026. The contracting entity is Wharton-Smith, Inc., and the work is associated with the Cypress Lake WTP Wellfield Raw Water Main project in Osceola County, Florida, though specific performance location details are not provided within the data.

General Info

DBE set-aside subcontract for standby generator installation under NAICS 238210 for Osceola County, Florida project.

Agency

Wharton-Smith, Inc.View Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

FL, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWharton-Smith, Inc.
ContactsNo contacts available
OfficeN/A
Organization / Agency
Wharton-Smith, Inc.
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of standby generator systems including fuel, exhaust, transfer switch, grounding, and conduit; building construction is secondary.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Variable Frequency Drives (VFD) Replacement Phase 3 (DBB)The Port of Seattle will replace 125 aging Robicon variable frequency drives (VFDs) with new equipment as part of Phase 3 of its VFD Replacement initiative. This effort aims to upgrade outdated infrastructure to ensure system reliability and improve operational efficiency across aviation facilities and infrastructure. The new VFDs will be fully integrated with the Port’s Direct Digital Controller (DDC) system to enable real-time energy usage monitoring, output control readings, and efficiency tracking, enhancing the Port’s ability to manage power consumption and maintain optimal performance. The scope includes all necessary wiring, testing, commissioning, and installation of associated equipment required to deliver a fully functional and synchronized system. The work falls under NAICS code 238210 and is managed by the Aviation Facilities & Infrastructure division, with technical oversight from Project Manager Sharon Miick and primary point of contact Yanet Maldonado. Although the solicitation number and set-aside details are not specified, the forecast was posted on July 31, 2026, signaling upcoming procurement activities. The project is critical for modernizing the Port’s electrical infrastructure and supporting long-term sustainability goals through precise control and monitoring of motor-driven systems. All work must be performed on-site at the Port’s facilities, with full accountability for system integration, performance validation, and operational readiness upon completion.
Aviation Facilities & Infrastructure

POSTED

about 5 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract requires the provision of design, permitting, and construction services to install 50 high-resolution cameras across 43 sites in the Bagwell and North Cargo Operations areas of the Port of Seattle. The primary objective is to enhance security and enforcement capabilities by replacing outdated systems with improved coverage, specifically targeting main terminal drive lanes and entrances previously unmonitored, with the goal of supporting forensic investigations and adherence to port movement rules. In the Bagwell area, the new cameras will shift focus from conveyor systems and security doors to critical transit corridors, while the North Cargo operations will benefit from flexible, user-controlled Pan Tilt Zoom units that provide broad surface area monitoring and dynamic viewing capabilities to address operational gaps. All work must be completed in accordance with specified technical and operational standards to ensure seamless integration with existing security infrastructure. The project is managed by the Aviation Project Management Group under the Port of Seattle, with primary point of contact Angela Peterson and Project Manager Randa Williams available for coordination. The North American Industry Classification System code 238210 identifies this as a specialty trade contracting effort focused on electrical and communication system installation. Although the solicitation has not yet been formally issued, the forecasted posting date is July 31, 2026, indicating this is a forward-looking opportunity for qualified contractors to prepare proposals. The place of performance is within the Port of Seattle’s operational boundaries, and all contractors must be prepared to navigate port-specific logistics, security protocols, and environmental constraints during installation and commissioning.
Aviation Project Management Group

POSTED

about 5 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Electrical Unit Price Portwide 2026_1 and _2This contract encompasses a broad range of electrical services to be performed across multiple Port of Seattle facilities including Seattle-Tacoma International Airport, maritime properties, and surrounding areas. The work includes but is not limited to the installation of raceways, wiring, medium voltage cabling, electrical boxes, transformers, temporary power and lighting systems, grounding, and associated testing, all in full compliance with applicable codes and regulations. The Contractor is responsible for providing all labor, tools, equipment, materials, and incidentals required to complete tasks as directed through Work Authorizations issued by the Port. Labor must be delivered according to the specified classifications outlined in the Schedule of Unit Prices, ensuring consistent pricing and accountability. The Port of Seattle anticipates a high volume of small-scale electrical projects over the coming year and plans to award two separate contracts under this solicitation to ensure sufficient capacity and rapid response times. The goal is to maintain operational continuity and meet dynamic project demands by leveraging two qualified contractors. The contract is identified under the NAICS code 238210 and is issued through Port Construction Services, with primary coordination handled by Heather Bowden and Lesley Miles. All work must be performed at designated Port-wide locations, and contractors are expected to adhere strictly to the terms and pricing structure detailed in the bid documents.
Port Construction Services

POSTED

about 5 hours ago

DEADLINE

N/A
View Details

More opportunities from Wharton-Smith, Inc.

Same awarding agency

NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
The contract pertains to the construction of the Cypress Lake Water Treatment Plant, Wellfield, and Raw Water Main in Osceola County, Florida, with an estimated value of $270 million. The project encompasses a comprehensive array of water infrastructure elements, including the development of raw water production wells with well heads and pumps, discharge piping and appurtenances, a surge bladder tank, site civil work, wellhead cages, an electrical building with a standby generator, and associated systems for water quality testing and well disinfection to meet regulatory certification standards. Additional major components include the Operations and Reverse Osmosis Buildings, Pretreatment Chemical Building, Post-Treatment Degasification System, Odor Control Air Exhaust Dispersion Stack System, and Post-Treatment Chemical Building. The solicitation is issued by Wharton-Smith, Inc. as a general contractor on behalf of the Central Florida Water Cooperative, specifically targeting State of Florida Certified Disadvantaged Business Enterprise subcontractors and suppliers to participate in this public infrastructure initiative. The bid submission deadline is August 19, 2026, at 2:00 PM EST, with proposed scopes due at least 24 hours prior and firm pricing required by 10:00 AM on bid day. All bidding documents are available for free download via ConstructConnect, and proposals must be submitted electronically to watergmpbids@whartonsmith.com. The point of contact for inquiries is Nichole Voitel, reachable by phone or email. No detailed pricing structure, payment terms, inspection protocols, bonding requirements, or evaluation criteria are specified in the available documentation, and while the NAICS code and DBE set-aside are identified, other contract administration details such as the contracting officer, COTR, or delivery schedule remain undefined.
Water and Sewer Line and Related Structures Construction

POSTED

about 10 hours ago

DEADLINE

in 15 days
View Details