Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Water Quality Laboratory Testing

Active

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Wharton-Smith, Inc. is seeking qualified subcontractors to provide primary and secondary water quality laboratory testing services for regulatory compliance, encompassing bacteriological, chemical, and physical analyses. The contract is classified as a subcontract under NAICS code 541380 and is designated as a Disadvantaged Business Enterprise (DBE) opportunity through the Department of Transportation, aiming to promote participation from certified minority- and socially disadvantaged-owned businesses. Testing services will support water infrastructure projects, particularly related to the Cypress Lake WTP Wellfield Raw Water Main in Osceola County, Florida, though specific performance locations are not detailed. The solicitation was posted on August 4, 2026, with a response deadline of August 19, 2026, and interested parties must submit proposals through the designated federal opportunity portal linked in the contract information. All work must adhere to applicable regulatory standards and quality assurance protocols for water safety and compliance.

General Info

Wharton-Smith seeks DBE subcontractors for water lab testing in Florida under regulatory standards.

Agency

Wharton-Smith, Inc.View Agency

NAICS

541380 - Testing Laboratories and ServicesView NAICS

Place of Performance

FL, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWharton-Smith, Inc.
ContactsNo contacts available
OfficeN/A
Organization / Agency
Wharton-Smith, Inc.
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Primary and secondary water quality testing including bacteriological, chemical, and physical analysis for regulatory compliance.

Similar Contracts

Same NAICS industry code

NAICS: 541380
New
DIBBS
Product Verification Testing and Quality InspectionThe contract requires the performance of Product Verification Testing and quality sampling for electrical insulation sleeving in strict accordance with MIL-STD-1916 to achieve zero non-conformances. This effort is critical to ensuring the highest level of product integrity and compliance with military quality standards, with all testing and sampling activities designed to validate conformance before acceptance. The work must be executed with precision to meet the zero-defect expectation, and the successful performer will be responsible for documenting and reporting all test results to demonstrate full adherence to the required specifications. The solicitation is classified as a subcontract under NAICS code 541380 and is issued by the Nuclear Reactor Program under the Department of Defense. The performance location is Tinker Air Force Base with a postal code of 73145-8000. The response deadline is August 12, 2026, and the solicitation was posted on August 3, 2026. All interested parties must submit their proposals by the deadline, and failure to comply with the testing protocol or deliver results meeting the zero non-conformance standard will result in rejection. The contract is not subject to a specific set-aside designation and is open to qualified subcontractors capable of executing high-precision quality assurance under strict military standards.
NUCLEAR REACTOR PROGRAM

POSTED

about 20 hours ago

DEADLINE

in 8 days
View Details

More opportunities from Wharton-Smith, Inc.

Same awarding agency

NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
The contract pertains to the construction of the Cypress Lake Water Treatment Plant, Wellfield, and Raw Water Main in Osceola County, Florida, with an estimated value of $270 million. The project encompasses a comprehensive array of water infrastructure elements, including the development of raw water production wells with well heads and pumps, discharge piping and appurtenances, a surge bladder tank, site civil work, wellhead cages, an electrical building with a standby generator, and associated systems for water quality testing and well disinfection to meet regulatory certification standards. Additional major components include the Operations and Reverse Osmosis Buildings, Pretreatment Chemical Building, Post-Treatment Degasification System, Odor Control Air Exhaust Dispersion Stack System, and Post-Treatment Chemical Building. The solicitation is issued by Wharton-Smith, Inc. as a general contractor on behalf of the Central Florida Water Cooperative, specifically targeting State of Florida Certified Disadvantaged Business Enterprise subcontractors and suppliers to participate in this public infrastructure initiative. The bid submission deadline is August 19, 2026, at 2:00 PM EST, with proposed scopes due at least 24 hours prior and firm pricing required by 10:00 AM on bid day. All bidding documents are available for free download via ConstructConnect, and proposals must be submitted electronically to watergmpbids@whartonsmith.com. The point of contact for inquiries is Nichole Voitel, reachable by phone or email. No detailed pricing structure, payment terms, inspection protocols, bonding requirements, or evaluation criteria are specified in the available documentation, and while the NAICS code and DBE set-aside are identified, other contract administration details such as the contracting officer, COTR, or delivery schedule remain undefined.
Water and Sewer Line and Related Structures Construction

POSTED

about 9 hours ago

DEADLINE

in 15 days
View Details