Electrical Conduit and Power Supply Installation
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract entails the installation of high-density polyethylene and rigid electrical conduit systems along with pull boxes and vaults to support distributed management system power delivery infrastructure. All work must adhere strictly to National Electrical Code standards, encompassing comprehensive trenching operations to properly embed and protect the conduits and associated components. The project is focused on ensuring reliable power distribution for critical transportation systems in the Douglas and Sarpy areas of Nebraska. The contract is classified as a subcontract under NAICS code 238210, which corresponds to electrical contracting services, and was posted for potential bidders on August 27, 2026, with the same date designated as the response deadline. The Nebraska Department of Transportation is the overseeing agency, with performance duties centered in the Douglas and Sarpy region. All contractors must be prepared to meet technical, safety, and regulatory requirements without deviation, and the work site is strictly limited to the designated geographic area indicated in the contract terms.
General Info
Agency
NAICS
Place of Performance
Douglas, Sarpy, NV, USSet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
