Electrical Demolition & Disposal

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This small business set-aside subcontract, managed by the Department of Defense under the W071 Endist Seattle, involves the demolition and disposal of electrical infrastructure for US Army Corps of Engineers facility projects. The scope of work requires the removal of 480 VAC Switchgear Lineup SQ1, various transformers including TRCR2 and TRCR3, feeder cables, and Embedded Panelboard CQ2. The contractor is responsible for the transport and legal disposal of all removed materials in strict accordance with Division 02 Construction Waste Management standards to ensure the site is cleared and ready for new installations. Performance will take place in the 98813 zip code area, with responses due by December 18, 2026.

General Info

DoD subcontract for electrical infrastructure demolition and disposal for US Army Corps projects.

NAICS

238910 - Site Preparation Contractors

Place of Performance

WA, 98813

Set-Aside

SBA

Documents

This scope was carved out of W912DW27RA020.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

CHJ 480V _ SQ1_SQ3_ DSQ1_DSQ2_Rep

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Seattle
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Removes and disposes of existing electrical infrastructure for prime contractors on US Army Corps of Engineers facility projects. Removes 480 VAC Switchgear Lineup SQ1, Transformers, Feeder Cables, Embedded Panelboard CQ2, and Transformers TRCR2 and TRCR3. Transports and legally disposes of materials per Division 02 Construction Waste Management standards. Delivers a cleared site ready for new installation.

Similar Contracts

Same NAICS industry code

More opportunities from Department Of Defense → W071 Endist Seattle

Same awarding agency

NAICS: 237990
New
Federal
CHJ 480V _ SQ1_SQ3_ DSQ1_DSQ2_Rep
Solicitation # W912DW27RA020
Solicitation W912DW27RA020 is a firm fixed price contract issued by the Army Corps of Engineers Civil Works for the design, fabrication, assembly, installation, and testing of 480V station service switchgear, switchboards, and panelboards at the Chief Joseph Powerhouse in Bridgeport, Washington. The scope includes the replacement of equipment SQ1, SQ3, DSQ1, and DSQ2, along with associated transformers, cable tray systems, and low-voltage wiring. The period of performance is scheduled from March 23, 2027, to December 17, 2029. This opportunity is a total small business set-aside under NAICS code 237990. The award will be based on an evaluation of past performance, the adequacy and feasibility of the proposed work plan, and price. Contractors must adhere to strict quality control standards per FAR 52.246-12, including a mandatory physical presence of a QC Manager on-site. Key requirements include compliance with the Davis-Bacon Act, Buy American domestic preferences, and specific safety standards such as EM 385-1-1. Deliverables include factory and field testing, as-built drawings, O&M manuals, and government personnel training. Invoicing is managed electronically through the Wide Area WorkFlow system. Proposals must be submitted via the PIEE Solicitation Module by the December 18, 2026, deadline.
Other Heavy and Civil Engineering Construction

POSTED

about 24 hours ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS