Electrical Distribution System Redundancy at the Orville Freeman Building
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves a comprehensive electrical upgrade at the Orville Freeman Building, focusing on enhancing the system's redundancy and reliability. The work encompasses the installation of a new 2,500 KVA medium voltage transformer, along with associated cabling and a main switch connected to an existing substation within the building's electrical room. Additionally, it includes replacing an outdated 15 KV switch with a new unit, which will require modifications to the building's exterior curtainwall and interior walls to accommodate the new equipment. The project involves significant logistical planning, as large components will be craned into the building through exterior openings, with most work scheduled during after-hours and weekends to minimize disruption. This project is managed under a single prime contract covering general, mechanical, and electrical construction, with detailed plans prepared by Ericksen Ellison and Associates Inc. The scope of work is broad, involving both electrical infrastructure upgrades and structural modifications to facilitate equipment installation. The contract is overseen by the Minnesota Department of Administration, with a response deadline set for January 22, 2024. The project aims to improve the building’s electrical system resilience, ensuring continued operation and safety through upgraded components and enhanced system capacity.
General Info
Place of Performance
MN, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26-140 Installation of Emergency Shut Off SwitchesOpen now, due in 3 days
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 18 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
A. The work will be done under one prime contract that includes: General, Mechanical, and Electrical construction.
B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract.
1. Project involves installation of a new 2,500 KVA medium voltage transformer along with cable connection and main switch connected to an existing substation in the main electrical room of The Orville Freeman Building. Replace an existing (circa 2005) 15 KV G&W switch with a new switch in a new location. Work will require modification on the building curtainwall/exterior and interior gyp/stud walls to get new equipment into the building. Large items will be craned into a lower level exterior patio area and brought in through curtainwall opening. Majority of work to be performed on after hours/weekend.
Plans and Specifications were prepared by Ericksen Ellison and Associates Inc., Todd Peterson, 305 2nd Street NW, Suite 105, New Brighton, MN 55112, Sign up to see this detail, Sign up to see this detail
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS