Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Florida was posted on September 1, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical Engineering - Backup Power & Generator Design

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
RFP/RFQ - On-Call Engineering Services for Torrington Transfer Station/NRRA
Solicitation # EDC 11- 2026 -01
The Northwest Hills Council of Governments (NHCOG) is soliciting proposals under solicitation number EDC 11- 2026 -01 for on-call engineering services to support the Torrington Transfer Station and the Northwest Resource Recovery Authority (NRRA). The agency seeks a qualified firm specializing in Municipal Solid Waste and Recycling Transfer Stations to provide technical analysis, facility and operational capacity assessments, site planning, and permitting assistance. These services are intended to support ongoing operations and inform the NRRA Strategic Plan and future capital investment decisions, ensuring compliance with CT DEEP General Permits. Interested firms must submit their proposals by November 30, 2026, at 11:00 AM. Submissions must include a project management plan, key personnel resumes limited to two pages, three relevant references, a technical approach, and a detailed project timeline. A fee proposal containing hourly rates or lump sum allocations must be submitted in a separate sealed envelope. Evaluation will be based on personnel qualifications, experience with multiuse trails and waste facility planning, the proposed project approach, and the fee schedule. Awardees must provide proof of workers compensation, liability, and vehicle insurance, including a waiver of subrogation and naming the State of Connecticut and NHCOG as additional insureds within ten days of the award. Required documentation also includes a Non-Collusion Affidavit and certifications of non-discrimination.
DAS Procurement

POSTED

about 8 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This subcontract for Electrical Engineering - Backup Power and Generator Design involves providing core engineering services for backup power systems at Sarasota County water treatment plants. The selected professional will be responsible for developing technical specifications, engineering calculations, power load models, and failure scenario studies, as well as creating preliminary and final construction plans for electrical distribution systems, power transfer switches, and backup generators. The project is managed by the Capital Projects agency in Florida under NAICS code 541330. A valid Florida Professional Engineer license is required to perform this work. The final deliverables include comprehensive construction plans and technical specifications, with a response deadline of October 6, 2026.

General Info

Electrical engineering for Sarasota County water plant backup power systems; Florida PE required.

Place of Performance

FL, USA

Set-Aside

NONE

Documents

This scope was carved out of 262903FB.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Engineering Services for Carlton Water Treatment Plant Backup Power Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Capital Projects
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → Capital Projects
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs core engineering design for backup power systems for prime contractors on Sarasota County water treatment plant projects. Develops technical specifications, engineering calculations, power load models, and failure scenario studies. Creates preliminary and final construction plan designs for backup generators, power transfer switches, and electrical distribution systems. Requires Florida PE license. Delivers final construction plans and technical specifications.

More opportunities from Florida → Capital Projects

Same awarding agency

NAICS: 237990
SLED
Phillippi Creek Phase II Maximum Allowable Dredging
Solicitation # 262908CG
Sarasota County is soliciting bids for the Phillippi Creek Phase II Maximum Allowable Dredging project, which aims to improve stormwater conveyance and reduce flood risk between US 41 and South Beneva Road. The scope of work involves dredging approximately 77,160 cubic yards over 33,500 linear feet to restore a permitted design elevation of -4 feet mean low water. Key activities include expanding the dredge footprint with a 10-foot shoreline offset, dredging three specific oxbow areas at Mineola, Seclusion, and River Ridge Drives, and managing dredge material preparation, handling, and disposal at designated sites such as the County Landfill and Lorraine Road Expansion. The project is estimated with a budget of 20 million dollars and must be completed within 390 calendar days from the issuance of the Notice to Proceed. The contract will be awarded to the responsive and responsible bidder offering the lowest total bid price. Bidders must demonstrate specific experience in hydraulic or mechanical dredging and turbidity controls, providing a Letter of Bondability of at least 1 million dollars and a bid bond equal to 5 percent of the total bid. Performance and payment bonds are required upon award. Technical execution must adhere to the January 2026 FDOT Standard Specifications and comply with FDEP and USACE permit requirements. Because the project involves CDBG-DR funding through HUD and the FDEP, contractors must comply with 2 CFR Part 200 Uniform Guidance, Davis-Bacon Act wage determinations, and Equal Employment Opportunity regulations. Final acceptance of the work is contingent upon as-built surveys and the submission of preliminary as-built drawings.
Other Heavy and Civil Engineering Construction

POSTED

13 days ago

DEADLINE

in about 17 hours
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS