This Subcontract opportunity from Florida was posted on March 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Electrical Installation and Control Wiring
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the on-site installation of power and control wiring for digital signs at Sanford Airport Authority facilities in Florida, requiring full integration with the existing airport electrical infrastructure. Work includes grounding systems, circuit connections, and ensuring compliance with all relevant electrical codes and safety standards for a high-traffic public environment. The scope is focused on precise, professional execution to support reliable operation of digital signage without disrupting airport operations. Bids must be submitted by April 29, 2025, and the solicitation is classified as a subcontract under NAICS code 238210, indicating it falls under electrical contracting services. The opportunity is open to qualified subcontractors seeking to provide specialized electrical work for the airport authority, with no set-aside provisions specified. All work must be performed at the airport location and demands technical expertise in commercial electrical systems and seamless compatibility with institutional power networks.
General Info
Place of Performance
FL, USASet-Aside
Documents
This scope was carved out of 2025-014-ITB.
The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.
Overhead Digital Signage System
AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
This one is closed. Find the next one like it.
Open contracts like this one, right now:
- 26-140 Installation of Emergency Shut Off SwitchesOpen now, due in 3 days
- Emergency/Exit Lighting – Mechanical/Electrical Rooms ProjectOpen now, due in 18 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
