Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

Electrical Installation and Wiring

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to the installation of electrical systems for a commercial building construction project, encompassing wiring, conduits, lighting, and power distribution components. It is structured as a subcontract under NAICS code 238210, which categorizes electrical contracting services, and was posted on July 17, 2026, with a response deadline of August 5, 2026. The work is managed by the State of Utah through its agency organization, though no specific office location or point of contact details are provided. Performance of the work is expected to occur within Utah, though the exact city or zip code is not specified. Interested parties must submit proposals before the deadline to be considered for award.

General Info

Electrical system installation subcontract for Utah commercial project, due August 5, 2026.

Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

UT, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUtah
ContactsNo contacts available
OfficeN/A
Organization / Agency
Utah
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installation of electrical systems including wiring, conduits, lighting, and power distribution for commercial building construction.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Variable Frequency Drives (VFD) Replacement Phase 3 (DBB)The Port of Seattle is preparing to replace the remaining 125 aging Robicon variable frequency drives (VFDs) as part of Phase 3 of its VFD replacement initiative. This project entails the complete removal of the failing units and installation of new VFD equipment, along with all necessary wiring, testing, and commissioning to ensure full system functionality. The new VFDs will be integrated with the Port’s Direct Digital Controller (DDC) system to enable real-time monitoring of energy usage, output control readings, and operational efficiency, enhancing overall system performance and energy management. The work will be executed under a design-bid-build contract structure, with all aspects of installation and integration required to meet operational standards. The project is managed by the Aviation Facilities & Infrastructure division of the Port of Seattle, and falls under NAICS code 238210 for electrical contracting. Primary contact for inquiries is Yanet Maldonado, with Sharon Miick serving as the project manager. The forecast was posted on July 18, 2026, though no solicitation number has been assigned yet. The work will take place at facilities operated by the Port of Seattle, and contractors should prepare for comprehensive coordination with existing building automation systems to ensure seamless connectivity and data integration with the DDC platform.
Aviation Facilities & Infrastructure

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract requires comprehensive design, permitting, and construction services to install 50 high-resolution cameras across 43 sites in the Bagwell and North Cargo Operations areas of the Port of Seattle. The primary objective is to enhance surveillance capabilities to support forensic investigations and reinforce compliance with the Port’s movement rules and regulations. Current camera placements focus on conveyor systems and security doors, but this project will expand coverage to include main terminal drive lanes and entrances in Bagwell, ensuring better visibility of vehicle movements and access points. In North Cargo, flexible camera coverage will be implemented using Pan Tilt Zoom units to provide dynamic, user-controlled monitoring over broad surface areas, bridging gaps in existing surveillance. The project will significantly upgrade the security infrastructure by replacing or supplementing outdated systems with advanced technology tailored to operational needs. All work must be completed in coordination with existing port operations, requiring careful planning for permitting and construction logistics. The Aviation Project Management Group under the Port of Seattle is managing the effort, with Angela Peterson as the primary point of contact and Randa Williams serving as the project manager. The procurement is categorized under NAICS code 238210 for electrical contracting services, and while no set aside details have been specified, the anticipated timeline suggests work will commence following a future solicitation process.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Rental Car Facility (RCF) Quick Turn Around (QTA) Area Fire Suppression System Replacement (Re-bid)The Port of Seattle’s Aviation Project Management Group is planning to replace the existing Aqueous Film Forming Foam (AFFF) fire suppression system at the Rental Car Facility located at 3150 S 160th Street in SeaTac, specifically targeting the removal of all PFAS-contaminated components. This project involves complete dismantling of the current wet foam system, including the disposal of hazardous materials and contaminated hardware, followed by the design and installation of an entirely new dry chemical fire suppression system. The new system will include tanks, valves, pumps, sprinkler lines, sprinkler heads, and reserve tanks, all engineered to meet modern safety standards and eliminate ongoing environmental risks associated with PFAS. The installation must seamlessly integrate with the facility’s existing Fire Alarm System to ensure full operational compliance and continuity of emergency response capabilities. This initiative is being executed under a quick turnaround approach to minimize disruption to facility operations, and it represents a proactive step toward environmental remediation and regulatory compliance. The solicitation, flagged as a re-bid, is managed by the Port of Seattle through its Office of Aviation Project Management, with primary contact Todd Rehm and project manager Pat Nakamura overseeing procurement and technical coordination. The work falls under NAICS code 238210 for fire protection system installation, and while the exact timeline and bidding details are not yet finalized, the posting date of July 18, 2026, indicates the procurement process is anticipated to launch soon, with performance expected to occur directly at the facility in SeaTac.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details

More opportunities from Utah

Same awarding agency

NAICS: 237990
New
SLED
Community Park Signage and WayfindingThe contract solicitation for Community Park Signage and Wayfinding, identified by Job Nos. PRK20033 and PRK24004, seeks a lump sum bid for the design, fabrication, and installation of unified bilingual signage across thirteen Salt Lake City parks, including Liberty Park, Cottonwood Park, Jordan Park, and others, in accordance with the Salt Lake City Parks, Open Space, and Trails Signage Guidelines 2022 and ADA standards. All signage must consist of 1/2 ImageLOC aluminum panels with a minimum ten-year warranty against fading, cracking, peeling, or delamination, featuring a hydrophobic surface for graffiti resistance and installed with proper footings. The scope includes demolition of existing signage and requires strict adherence to APWA standards and supplementary modifications, with all work to be completed within 90 calendar days following the Notice to Proceed and any punch list items resolved within 15 days of receipt. The project is funded under a federal community development block grant, triggering applicable federal provisions and requiring compliance with Section 3 of the Housing and Urban Development Act of 1968 where relevant. The contract mandates a bid security of at least five percent of the total bid amount, and upon award, the contractor must furnish both a performance bond and a payment bond, each for one hundred percent of the contract price, issued by a surety authorized in Utah and meeting U.S. Treasury or A.M. Best criteria. Commercial general liability insurance is required at one million dollars per occurrence, two million dollars general aggregate, and two million dollars products-completed operations aggregate, with Salt Lake City Corporation named as an additional insured on a primary and non-contributory basis; additional coverage includes commercial automobile liability, pollution liability, and workers’ compensation as required under Utah law. The award will be made to the most responsive and lowest qualified, responsible bidder, subject to Salt Lake City’s Value-Based Procurement Program, which applies to bids between $250,001 and $2,000,000 and awards bonus points for nondiscrimination policies, sponsorship of state-compliant apprenticeships, use of pre-employment and for-cause drug testing, and local small business status. Bidders must provide certifications regarding ethical conduct, non-collusion, and compliance with Salt Lake City’s conflict of interest ordinances, and demonstrate organizational structure through submission of resumes for key personnel including the Resident Superintendent. Final payment is not due until thirty days after finance department approval, and liquidated
Other Heavy and Civil Engineering Construction

POSTED

about 17 hours ago

DEADLINE

in 18 days
View Details