Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Georgia was posted on July 17, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical and Control Systems Integration

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238210
New
SLED
Existing Generators Replacement Aguadilla, PR
Solicitation # 872298
This project involves the complete replacement of two existing power generators at the Aguadilla Detention Facility in Aguadilla, Puerto Rico. The scope of work requires the removal of old units and the installation of one 100 kW and one 150 kW Perkins diesel generator, both featuring stainless-steel enclosures anchored to existing concrete slabs. The installation includes two new NEMA 3R automatic transfer switches and requires comprehensive load bank testing for both units. The project is being issued as a firm-fixed-price task order under an 8(a) MACC IDIQ, with a magnitude estimate between $250,000 and $300,000 and a total period of performance of 270 calendar days from the notice to proceed. The award will be based solely on the lowest total evaluated price, though proposals will be evaluated on technical understanding, methodology, program implementation, and the ability to coordinate labor and materials given the constraints of working on an island. Contractors must comply with the Buy American Act, Davis-Bacon prevailing wage rates for Puerto Rico, and strict security protocols, including the signing of DHS non-disclosure agreements and potential PIV card issuance for personnel. Key administrative requirements include submitting payment requests via the Invoice Processing Platform with certified payroll, providing a project schedule within 15 days of the notice to proceed, and adhering to standard working hours of 7:30 am to 4:00 pm, Monday through Friday.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 20 days
NAICS: 238210
New
SLED
Conex Offices for Forensics Personnel - St. Thomas
Solicitation # 872300
This project involves the provision and installation of two 40-foot steel FLEXTAINER conex offices at the St. Thomas HSI Facility in the US Virgin Islands to support forensic science technicians. Each unit will be installed on a 3k PSI reinforced concrete slab and equipped with two split-system A/C units, a steel door with a Cypher lock, four security windows, R-11 insulation, vinyl flooring, LED lighting, and a 5-pound ABC fire extinguisher. The contractor is responsible for connecting the units to the nearest electrical circuit using 2-inch PVC or uPVC conduit and must adhere to NFPA 70 and International Building Code standards. The contract is a Firm-Fixed-Price task order issued under an 8(a) MACC IDIQ, with an estimated magnitude between $250,000 and $300,000. The period of performance is 364 calendar days from the Notice to Proceed, with a project schedule due within 15 days of that notice. Award is based on the lowest total evaluated price, considering technical approach, safety, and quality control. Key requirements include compliance with the Buy American Act, adherence to prevailing wage rates per determination VI20260001, and strict security protocols, including the signing of DHS Non-Disclosure Agreements and mandatory cybersecurity training for personnel. All payment requests must be submitted electronically via the Invoice Processing Platform and accompanied by certified payroll.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 20 days
NAICS: 238210
New
SLED
Replace Switchgears at FRCE, Phase 1
Solicitation # N400857545551
Solicitation N400857545551, titled Replace Switchgears at FRCE, Phase 1, is a request for proposals for electrical infrastructure upgrades at Marine Corps Air Station Cherry Point, North Carolina. The project involves the demolition and replacement of seven electrical switchgear stations across Buildings 137 and 138, including the installation of new molded-case breaker switchgear with PM5500 power metering and the replacement of a 15kV switch and transformer in Building 138 with a new 6-way SF6 switch and 480V dry type transformer. The work requires reworking existing conduits and conductors and adhering to strict operational constraints, specifically that each switchboard replacement must be completed within a 72-hour power outage scheduled over a three-day holiday weekend. The estimated cost range for the project is between 1,000,000 and 5,000,000 dollars, with a completion timeline of 720 calendar days after award. The contract will be awarded based on the lowest price. Bidders must comply with the Buy American statute and EM 385-1-1 safety standards, particularly as Building 137 is classified as a hazardous area. Depending on the proposal value, bid, performance, and payment bonds may be required, with bid bonds mandatory for proposals exceeding 150,000 dollars. Key deliverables include a baseline construction schedule with monthly updates and a three-week look-ahead schedule. The project incorporates various FAR and DFARS clauses, including requirements for accelerated payments to small business subcontractors and restrictions on materials from specific regions. Proposals are due by September 10, 2026, and must be submitted via email to the designated Navy contacts.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in about 16 hours
NAICS: 238210
New
IE JCC Fire Alarm Repairs
Solicitation # Inland Empire Fire Alarm Deficiencies (169706,169708,169733,169736 & 16937)
Management & Training Corporation (MTC), operator of the Inland Empire Job Corps Center in San Bernardino, California, is soliciting subcontractor bids for a fixed-price, single lump sum contract to address fire alarm deficiencies. The scope of work involves removing six existing fire alarm bells and replacing them with six Cooper Wheelock HSW horn/strobe notification appliances, ensuring all new devices are integrated into the existing fire alarm system according to code and field conditions. Bids are due by September 16, 2026, and will be evaluated based on overall best value. A physical site visit and signature on the attendance roster are mandatory prerequisites for bid submission. The project is subject to Construction Wage Rate Requirements for federal facilities, requiring compliance with California prevailing wage determinations for San Bernardino County and weekly certified payroll submissions. For bids of $25,000 or more, contractors must provide a bid bond guarantee of 20% of the base bid, as well as performance and payment bonds from a surety company with at least an A- rating. Required submission documents include the MTC Supplier Packet (W-9, Supplier Self-Certification, and Acceptance of Terms & Conditions), a detailed cost breakout covering materials, labor, and equipment, and a Unique Entity ID (UEI) for first-tier subcontractor reporting. Contract administration includes a two-stage inspection process consisting of a substantial completion inspection to develop a punch list, followed by a final inspection upon completion of all remaining items. Payment is processed via pay applications using ALA G702 G703 forms, supported by a previously submitted Schedule of Values. The contractor must begin work within five business days of the agreed-upon start date following the issuance of a Notice to Proceed. This opportunity is set aside for small businesses, including SDB, WOSB, HUBZone, and SDVOSB certifications.
Inland Empire Job Corps

POSTED

about 9 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

The contract involves the electrical wiring, conduit installation, grounding, and full integration of fuel dispensers with the site’s power infrastructure and fleet fuel management systems. This work requires precise coordination between power distribution components and fueling equipment to ensure safe, reliable, and compliant operation across the facility. The integration must support real-time monitoring and data exchange between the fuel dispensers and the centralized fleet fuel management platform, necessitating robust control systems and secure communication protocols. The contract is listed as a subcontract under NAICS code 238210 for electrical contracting and is issued by the City of Rome in Georgia. Responses are due by August 20, 2026, and all work must align with the technical and operational requirements of the site’s existing systems. The location of performance and detailed point of contact information are not specified, but contractors must be prepared to meet all state and local electrical codes and ensure seamless compatibility with the agency’s fuel management technology. The solicitation is accessible through the Georgia Department of Administrative Services portal.

General Info

Electrical wiring and fuel dispenser integration with fleet management systems for City of Rome, Georgia, due August 20, 2026.

Agency

Georgia → City of RomeView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of PE-65750-NONST-2026-000000045.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

024-26 New Fleet Fueling Sustem

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → City of Rome
ContactsNo contacts available
OfficeN/A
Organization / Agency
Georgia → City of Rome
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Electrical wiring, conduit, grounding, and integration of fuel dispensers with site power and fleet fuel management systems.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS