Electrical Switchgear and Control Panel Supply

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the City of Roseville involves the supply and fabrication of custom electrical distribution equipment, specifically switchgear and control panels, for facility projects. The provider is responsible for delivering dimensioned layout drawings and elementary schematics with wire numbering in accordance with Section 16075, as well as providing O&M manuals upon delivery of the equipment. The scope of work includes performing source testing and issuing a Manufacturer's Certificate of Source Testing, while ensuring full compliance with Section 01756 Commissioning standards. This opportunity, categorized under NAICS code 335311, is located in Roseville, California, with a response deadline of October 7, 2026.

General Info

Subcontract for custom electrical equipment supply and fabrication for City of Roseville projects.

Agency

California → City of RosevilleView Agency

NAICS

335311 - Power, Distribution, and Specialty Transformer ManufacturingView NAICS

Place of Performance

Roseville, CA, 95747, USA

Set-Aside

NONE

Documents

This scope was carved out of RFP 08-185.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction Management Services For Pleasant Grove Wastewater Treatment Plant Electrical Power Capacity Expansion Project

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Roseville
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → City of Roseville
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies custom electrical distribution equipment for prime contractors on City of Roseville facility projects. Fabricates switchgear and control panels, providing dimensioned layout drawings and elementary schematics with wire numbering per Section 16075. Performs source testing and provides Manufacturer's Certificate of Source Testing. Complies with Section 01756 Commissioning standards. Delivers fabricated equipment with O&M manuals.

Similar Contracts

Same NAICS industry code

NAICS: 335311
New
DIBBS
LEAD, ELECTRICAL
Solicitation # SPE4A6-26-T-30SQ
This solicitation, issued by the DLA Aviation ASC Commodities Division, is a Request for Quotations for the procurement of six electrical leads, part number BACJ40AR30-08, manufactured by The Boeing Company or Amphenol Cable and Interconnect. The items are designated as critical application items and require FAA airworthiness approval. The procurement is governed by NAICS code 335311 and requires compliance with Technical Data Package Rev A Gen 1 and Quality Assurance Provision 13873. Delivery is specified as FOB Origin with a required delivery date of October 22, 2026, and a need ship date of March 14, 2027, to the DLA Distribution facility in New Cumberland, Pennsylvania. The contract mandates strict quality and traceability standards, including the retention of supply chain documentation per DLAD Procurement Note C03 and a manufacturer inspection system complying with ISO 9001:2015. Sampling must follow MIL-STD-1916, ASQ H1331, or a comparable zero-based plan. Packaging and marking must adhere to MIL-STD-129 and DLA packaging requirements, with specific preservation method 31. Administrative requirements include the use of the Wide Area WorkFlow system for invoicing and compliance with various FAR and DFARS clauses, including the Buy American Act, Berry Amendment, and cybersecurity standards under DFARS 252.204-7012. Inspection and acceptance will occur at the destination.
ASC COMMODITIES DIVISION

POSTED

about 12 hours ago

DEADLINE

in 8 days
View Details

More opportunities from California → City of Roseville

Same awarding agency

NAICS: 541611
New
SLED
Construction Management Services For Pleasant Grove Wastewater Treatment Plant Electrical Power Capacity Expansion Project
Solicitation # RFP 08-185
The City of Roseville is soliciting proposals for Construction Management services for the Pleasant Grove Wastewater Treatment Plant Electrical Power Capacity Expansion Project. The project focuses on increasing utility service capacity, expanding standby generation, and upgrading electrical systems, with specific physical construction including a 12-kilovolt ductbank and a plant drain pump station. The selected consultant will utilize a design-assist approach to support the construction phase, ensuring operational continuity through the development of Maintenance of Plant Operations plans and the provision of temporary infrastructure to prevent impairment of treatment capabilities. Proposals are due by October 7, 2026, and will be evaluated based on the firm's experience and qualifications, understanding of the project, and the proposed project plan. Awarding will be based on the most advantageous proposal, potentially including an interview process. Required submissions include a Proposer's Certification, Non-collusion Declaration, and a sample contract. The project adheres to strict technical standards, including ASCE 7-22 and NETA certification for testing personnel, with a monthly invoicing cycle and a performance location at 5051 Westpark Drive, Roseville, California.
Administrative Management and General Management Consulting Services

POSTED

1 day ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS