Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Electrical System and Lighting Modernization

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract titled Electrical System and Lighting Modernization pertains to comprehensive upgrades to electrical distribution systems including panels and circuits across classrooms, laboratories, and office spaces at Wayne Community College in North Carolina. It also encompasses the installation of energy-efficient LED lighting integrated with occupancy sensors to enhance energy conservation and operational efficiency. The work will involve modernizing outdated infrastructure to meet current safety and performance standards while reducing long-term energy consumption. This subcontract is open for responses until August 12, 2026, and falls under the NAICS code 238210, which classifies it as electrical contracting services. The solicitation was posted on July 22, 2026, and is managed through the North Carolina state procurement portal with no specific set-aside provisions designated.

General Info

Electrical and LED lighting upgrades at Wayne Community College with occupancy sensors, due August 12, 2026.

Agency

North Carolina → Wayne Community CollegeView Agency

NAICS

238210 - Electrical Contractors and Other Wiring Installation ContractorsView NAICS

Place of Performance

NC, US

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNorth Carolina → Wayne Community College
ContactsNo contacts available
OfficeN/A
Organization / Agency
North Carolina → Wayne Community College
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Upgrades to electrical distribution, panels, circuits, and installation of LED lighting with occupancy sensors in classrooms, labs, and offices.

Similar Contracts

Same NAICS industry code

NAICS: 238210
New
SLED
Variable Frequency Drives (VFD) Replacement Phase 3 (DBB)The Port of Seattle is forecasting the third phase of a project to replace 125 failing Robicon Variable Frequency Drives with new equipment, aiming to enhance operational efficiency and reliability across its aviation facilities. This contract requires full removal and installation of the new VFDs, along with comprehensive wiring, testing, and commissioning to ensure seamless integration into the existing infrastructure. A critical component of the project is connecting all new VFDs to the Port’s Direct Digital Controller system to enable real-time monitoring of energy usage, output control readings, and system efficiency, supporting long-term energy management goals. The work is scoped under NAICS code 238210, indicating it falls within the electrical contracting category, and will be executed under a design-bid-build delivery method. The project is being managed by the Aviation Facilities & Infrastructure division of the Port of Seattle, with primary point of contact Yanet Maldonado and Project Manager Sharon Miick available for coordination. While specific timelines and funding details are not provided in the forecast data, interested parties are directed to the official solicitation portal for further information, with the forecast posted on July 26, 2026. Performance will occur at Port of Seattle facilities, though exact locations are not specified.
Aviation Facilities & Infrastructure

POSTED

about 5 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Operational Security Cameras Bagwell and North Cargo AreasThe contract entails the design, permitting, and construction of a new security camera system across the Bagwell and North Cargo Operations areas at the Port of Seattle, aimed at enhancing operational surveillance and enforcement capabilities. A total of 50 high-resolution cameras will be installed at 43 distinct locations to replace and expand upon existing systems that currently focus primarily on conveyor systems and security doors. The installation will significantly improve coverage along main terminal drive lanes and entrances in the Bagwell area, providing clearer imagery for forensic investigations and better compliance monitoring of the Port’s movement rules and regulations. In the North Cargo area, the system will deliver flexible, broad-area monitoring through pan-tilt-zoom cameras that can be manually controlled to cover dynamic operational spaces and bridge gaps in existing surveillance. The project is classified under NAICS code 238210 for electrical contractors and is managed by the Aviation Project Management Group within the Port of Seattle. The primary point of contact is Angela Peterson, with Randa Williams serving as the project manager. The solicitation was posted on July 26, 2026, and no set-aside provisions have been designated. All work is expected to be performed on-site at the Port of Seattle, with no specific city or state details provided in the public data. The system is designed to ensure comprehensive, adaptable, and high-quality video coverage to support both safety and regulatory enforcement across critical cargo handling zones.
Aviation Project Management Group

POSTED

about 5 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Parking Garage UPSThe contract involves the demonstration and full replacement of the existing uninterruptible power supply (UPS) system in a parking garage, which is critical for maintaining operations of ticketing kiosks and associated automated gates during power outages. The replacement scope encompasses the installation of new UPS equipment along with all supporting electrical infrastructure, including subpanels, electrical feeders, disconnects, and circuit breakers, ensuring seamless integration and reliable backup power. The new UPS units will be equipped with data connectivity features to enable remote alarm monitoring and system diagnostics, enhancing operational oversight and preventive maintenance capabilities. The project is under the auspices of the Port of Seattle’s Aviation Project Management Group and is classified under NAICS code 238210, indicating it falls within the electrical contracting industry. The solicitation was posted on July 26, 2026, and is currently in forecast status, meaning it is a notice of anticipated procurement rather than an active bid opportunity. Primary point of contact for inquiries is Yanet Maldonado, with JJ Jordan serving as the project manager; both can be reached via phone or email provided. The work is expected to be performed at the parking garage facility managed by the Port of Seattle, although specific location details are not provided in the data.
Aviation Project Management Group

POSTED

about 5 hours ago

DEADLINE

N/A
View Details
NAICS: 238210
New
SLED
Electrical Unit Price Portwide 2026The contract titled Electrical Unit Price Portwide 2026 encompasses a wide range of electrical work to be performed across multiple Port of Seattle locations including Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. The scope includes installation of raceways, wiring, medium voltage cabling, electrical boxes, transformers, temporary power and lighting systems, testing, grounding, and other related equipment and devices, all in strict compliance with applicable code requirements from enforcing agencies. The Contractor is responsible for providing all labor, tools, materials, equipment, and incidentals necessary to fulfill work orders issued through the Port’s Work Authorization process. Labor must be staffed according to the specified classifications outlined in the Schedule of Unit Prices, ensuring standardized pricing and workforce categorization. The contract is forecasted for 2026 and falls under NAICS code 238210, indicating its classification as electrical contracting services. It is managed by the Port Construction Services division of the Port of Seattle, with Heather Bowden serving as the primary point of contact and Lesley Miles as the Project Manager. The work will occur at various Port-wide sites, requiring coordination across multiple operational areas. There is no set-aside designation indicated, and the solicitation is available for review through the Port’s online portal. Contractors must be prepared to respond to dynamic project needs, with pricing governed by the established unit rate schedule and all work subject to the Port’s authorization and compliance protocols.
Port Construction Services

POSTED

about 5 hours ago

DEADLINE

N/A
View Details

More opportunities from North Carolina → Wayne Community College

Same awarding agency

NAICS: 236220
New
SLED
Wayne CC Spruce Building RenovationThe Wayne Community College Spruce Building Renovation project involves a $1,000,000 interior renovation of a 28,280 gross square-foot facility on the main campus in Goldsboro, North Carolina, to modernize academic spaces for the Business and Computer Technologies Division. The scope includes comprehensive upgrades to classrooms, computer laboratories, faculty offices, student collaboration areas, and support spaces, with renovations focused on finishes, lighting, instructional technology, and critical building systems such as HVAC, electrical, plumbing, fire protection, telecommunications, and IT infrastructure. The building will remain fully occupied during construction, requiring carefully phased work to maintain uninterrupted instructional operations and ensure the safety of students and staff. The project is being delivered under a design-build methodology in accordance with North Carolina General Statutes Article 8 of Chapter 143, mandating qualifications-based selection of design professionals and prohibiting fee-based selection. The deadline for proposals is August 12, 2026, and the target completion date is October 2027. Proposals must be submitted as a single physical package not exceeding 40 single-sided pages or 20 double-sided pages, stapled without binders or tabs, along with a USB flash drive containing electronic copies of the Letter of Interest and Standard Form 254. Submissions must be delivered in person or via courier to the Dogwood Building Cashiers’ Office at the college campus; email, fax, and cloud links are not accepted. Evaluations are based on ten equally weighted factors including the profile and experience of the proposing team, resumes of key personnel, documented success in similar design-build projects, cost estimation and schedule adherence history, understanding of the local context, current workload and resource availability, project delivery methodology, and compliance with bond and QBS certification requirements. A surety letter with an A.M. Best rating of A or better is a mandatory pass/fail criterion. All contractors and design professionals must hold current North Carolina professional licenses, and subcontractor selection must follow either a negotiated approach or the state’s open competitive selection process under Chapter 143. The payment address is the Dogwood Building Cashiers’ Office, and all documents must be submitted in strict adherence to formatting and media specifications with no flexibility for alternative submission methods.
Commercial and Institutional Building Construction

POSTED

5 days ago

DEADLINE

in 17 days
View Details