Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Government of Canada was posted on May 21, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Electrical System Design and Engineering Services

Closed
International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals from Disadvantaged Business Enterprise (DBE) firms to provide comprehensive design, bidding support, and engineering services during construction for the Corydon Well Replacement Project, a municipal groundwater well initiative in California to replace and decommission the existing Corydon well. The project is divided into two phases: Phase 1 focuses on civil site design, technical specifications, line-bid items for drilling and abandonment, and full-time on-site construction management oversight compliant with Riverside County and California State Water Resources Control Board requirements; Phase 2 involves detailed architectural, structural, mechanical, electrical, and instrumentation and controls design for equipping, testing, and commissioning the new well. Key technical specifications require a 24-inch stainless steel Ful-Flo louvered screen matching the existing casing depth, vertical turbine pump equipment, and discharge piping tied to the Corydon Blend station and Malaga blending location, all in accordance with AWWA, SWRCB-DDW, DWR, and EVMWD standards. Proposals must include a Preliminary Design Report with up to 30% design effort, review of approximately 200 submittals, assistance with a Domestic Water Supply Permit Amendment, and record drawing development along with commissioning and operator training support. The solicitation is structured as a Request for Proposals with evaluation weighted toward demonstrated competence and professional qualifications, where relevant experience and team qualifications account for 25%, understanding of project scope and approach for another 25%, scope and schedule feasibility for 20%, innovation for 10%, cost value for 10%, and overall proposal quality for 10%. Cost is not the sole determinant; the highest-ranked firm will be negotiated with for a mutually agreeable scope and fee, with a not-to-exceed dollar limit expected. Respondents must submit all required certifications and forms through Attachment “2”, including American Iron and Steel Certification, Debarment and Suspension Certification, System for Award Management (SAM) Information, Conflict of Interest Disclaimer, Insurance Acknowledgment, Public Works Registration, and Executive Order N-6-22 Certification for Russia sanctions compliance. Subcontractors must be identified and their DBE status documented, along with explanations if not selected. The proposal must conform to Build America Buy America Act requirements, including sourcing documentation and waiver procedures for non-compliant materials, and adhere to telecommunications restrictions under Section 889, prohibiting Huawei and ZTE equipment. Proposals must be submitted via the PlanetBids
Ardurra Group, Inc.

POSTED

about 10 hours ago

DEADLINE

in 26 days
NAICS: 541330
New
Corydon Well Replacement Project – Professional Design, Bidding Support and Engineering Services During Construction
Solicitation # WO# C2305
The Corydon Well Replacement Project entails the design, construction support, and comprehensive engineering services required to replace the existing Corydon groundwater production well with a new facility while permanently abandoning the old well in full compliance with California State Water Resources Control Board and Riverside County regulations. The scope includes hydrogeological evaluation, aquifer analysis, municipal well design, borehole geophysical logging, site civil and structural engineering, utility coordination, environmental permitting, water quality sampling, and full-time construction management during the drilling phase, followed by engineering oversight during the well equipping and commissioning phase. Technical specifications mandate a 24-inch diameter stainless steel Ful-Flo louvered well screen matching the existing casing depth, with sanitary seal placement consistent with AWWA standards. The project is divided into two phases: Phase 1 focuses on technical specifications, civil design, line-bid items, bidding support, and on-site construction management, while Phase 2 covers architectural, mechanical, electrical, instrumentation, and controls design for final facility equipping. All work must adhere to the Build America, Buy America Act and 2 CFR Part 184, requiring domestic sourcing of iron, steel, and manufactured products, along with rigorous certification and documentation of origin. The project is funded by a $400,000 Bureau of Reclamation grant and non-Federal cost share, subjecting it to the full scope of federal compliance requirements including 2 CFR Part 200, Davis-Bacon, Clean Air Act, and Federal Water Pollution Control Act provisions, which must be flowed down to subconsultants exceeding $150,000. Proposals must include detailed cost breakdowns by task, hourly rates, travel expenses, and a not-to-exceed total fee capped at $1,000,000, submitted via the PlanetBids portal by September 1, 2026, with mandatory certifications for debarment status, SAM registration, executive order N-6-22 compliance, lobbying restrictions, insurance, conflict of interest, and DBE subcontractor participation. Evaluation prioritizes demonstrated qualifications and project experience (25%), technical understanding and approach (25%), schedule and scope clarity (20%), innovation (10%), cost value (10%), and overall proposal quality (10%), with award based on competence rather than lowest price. Successful contractors must maintain accurate records for four years post-final payment, submit monthly itemized invoices with progress reports, and adhere to a project timeline running from November
GEI Consultants, Inc.

POSTED

about 10 hours ago

DEADLINE

in 26 days

AI Contract Overview

Show more

The contract seeks detailed electrical design and engineering services to upgrade electrical systems at an operations compound located in Ontario, Canada, excluding the National Capital Region. The scope includes performing comprehensive load calculations, developing single-line diagrams, and producing full technical documentation to ensure full compliance with applicable electrical codes and safety standards. All deliverables must reflect professional engineering practices and be tailored to the specific operational and infrastructure needs of the facility. This is a subcontract under the NAICS code 541330 for engineering services, issued by the Parks Canada Agency, part of the Government of Canada. The solicitation was posted on May 21, 2026, with a response deadline the same day at 7:00 PM Eastern Time. While no set-aside designation is specified, interested parties must submit proposals prior to the deadline to be considered. The performance location is clearly defined as the designated operations compound in Ontario outside the National Capital Region, and all work must adhere to federal contracting requirements and technical specifications outlined in the solicitation.

General Info

Electrical engineering services for Ontario operations compound, excluding National Capital Region, due May 21, 2026.

Agency

Government of Canada → Parks Canada AgencyView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Canada, Ontario (except NCR), CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Parks Canada Agency
ContactsNo contacts available
OfficeN/A
Organization / Agency
Government of Canada → Parks Canada Agency
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Provide detailed electrical design, engineering, and technical documentation for upgrading electrical services at an operations compound, including load calculations, single-line diagrams, and code compliance.

More opportunities from Government of Canada → Parks Canada Agency

Same awarding agency

NAICS: 238160
New
International
Stage 2 - St. Andrew’s Manse Roof Replacement, Dawson Historical Complex National Historic Site
Solicitation # 5P468-26-0044/B-001
Parks Canada Agency is reissuing bid solicitation 5P468-26-0044/B-001 to secure a contractor for the St. Andrew’s Manse Shingle Roof Replacement at the Dawson Historical Complex National Historic Site in Dawson City, Yukon. This project involves the careful removal of existing cedar shingles and replacement of damaged underlayment, flashing, and roof sheathing, followed by the installation of new cedar shingles matched to the original size and exposure, along with new galvanized flashings at eaves, valleys, ridges, and penetrations. Repairs or replacements of damaged wood trims, mouldings, and fascia are also required, including repainting above the soffit line. All work must preserve the heritage character of the Recognized Federal Heritage Building, which remains occupied during construction, requiring the contractor to ensure occupant safety, protect adjacent property, maintain safe access, and comply with environmental and site safety standards. The project must be completed by November 15, 2026. This solicitation is the second stage of a two-part selection process, inviting only pre-qualified suppliers who passed Stage One to submit detailed bids based on provided specifications and drawings. The previous solicitation, issued on July 9, 2026, with a July 28 closing, is canceled and superseded. Bidders on the prior solicitation may request a debriefing. Proposals are due by August 12, 2026, at 9:00 PM MDT, with Jennifer Maheu as the primary contracting authority. Subcontractors may register their interest through the designated partner section.
Roofing Contractors

POSTED

2 days ago

DEADLINE

in 6 days
View Details