Electrical System Installation and Accessibility Upgrades
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The contract requires the installation of an electrical system to connect a mobile home to an existing power source, ensuring all work meets current local building and electrical codes. The scope includes full compliance with safety and regulatory standards while integrating accessibility enhancements specifically designed for residents who are visually or hearing impaired, such as adapted lighting controls, audible alert systems, and tactile indicators. All installations must be completed in Sequoyah County under the oversight of the Cherokee Nation Housing Authority, with a focus on usability, safety, and adherence to ADA-compliant principles. The contract is classified as a subcontract under NAICS code 238210, with a response deadline of August 6, 2026. The project is managed by the Cherokee Nation, which emphasizes culturally appropriate and inclusive housing solutions. While specific funding or payment terms are not outlined here, timely submission and demonstrated expertise in accessible electrical installations are critical for qualification. The work must be performed on-site within the designated location, and contractors are expected to coordinate closely with local authorities to ensure all inspections and approvals are obtained before final handover.
General Info
Agency
NAICS
Place of Performance
Sequoyah County, OK, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from Cherokee Nation Housing Authority
Same awarding agency
