Electrical Updates and Power Distribution

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Electrical Updates and Power Distribution involves performing electrical upgrades for prime contractors on City of Turlock pool mechanical building projects. The scope of work includes the installation of low-voltage power conductors, cables, raceways, boxes, and wiring devices, as well as providing connections to mechanical equipment exceeding 50V. All grounding and bonding must be completed in accordance with CEC, NFPA, and NECA 1-2000 standards to deliver a fully functional electrical power and control system. The project is located in Turlock, California, under NAICS code 238210. Interested parties must submit their responses by the deadline of October 21, 2026.

General Info

Electrical upgrades for Turlock pool mechanical buildings due by October 21, 2026.

Documents

This scope was carved out of CP 25-056.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Columbia Pool Exhaust Fan

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Turlock
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Turlock
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs electrical updates for prime contractors on City of Turlock pool mechanical building projects. Installs low-voltage power conductors, cables, raceways, boxes, and wiring devices; performs grounding and bonding per CEC, NFPA, and NECA 1-2000 standards. Provides connections to mechanical equipment exceeding 50V. Delivers completed electrical power and control system.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Turlock

Same awarding agency

NAICS: 238220
SLED
Columbia Pool Exhaust Fan
Solicitation # CP 25-056
The City of Turlock is soliciting bids for Project No. CP 25-056, which involves the installation of a new inline exhaust fan system and the replacement of existing natural-gas piping at Columbia Pool in Turlock, California. The scope of work includes all necessary labor, materials, and equipment for mechanical, plumbing, and electrical updates, specifically focusing on VFD field connections, circuit breakers, and gas line reconfiguration. The contractor is responsible for mobilization, demobilization, excavation, and coordination with City staff and Knorr Systems to manage boiler operations and pool maintenance. All work must adhere to CEC/NEC electrical standards, California Building Code seismic requirements, and ADA-ABA accessibility guidelines. Proposals must be submitted electronically via the OpenGov portal by 3:00 pm on October 21, 2026, with a mandatory pre-bid conference scheduled for October 9, 2026. Bidders must hold a valid B - General Building Contractor or C-20 - Warm-Air Heating, Ventilating and Air-Conditioning Contractor license. The contract will be awarded to the lowest responsible bidder and requires a 10 percent bid bond, as well as 100 percent performance and payment bonds. Work must commence within ten working days of the Notice to Proceed and reach substantial completion within twenty-five working days of the start date. Payment is based on agreed-upon daily force account work reports and requires the submission of quality-control documentation with each application for payment.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

8 days ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS