This Solicitation opportunity from Missouri was posted on February 5, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract pertains to the "Ellis Dining Hall Remodel" at the University of Central Missouri, with solicitation number 24-048 Addendum 7, posted on February 5, 2024, and a response deadline of March 1, 2024. The project involves remodeling work at the university’s main campus in Warrensburg, Missouri, and is classified under NAICS code 238140. Vendors interested in bidding must submit their proposals exclusively through the UCM Ebid system (Ionwave), where bid details and pricing are secured until the bid is unsealed. A prebid meeting is scheduled for February 13 at 10:00 am at the Ellis Hall Entrance, offering vendors a rare opportunity to view the site, and attendance is strongly encouraged. All communication regarding the bid must be directed to the designated buyer, Robert Walla, via email or phone, with any external contact risking disqualification. The evaluation process includes a review for responsiveness and responsibility before any contract award is made.
Supporting documentation emphasizes compliance with federal and state work authorization laws, requiring contractors and their employees to participate in the E-Verify program, as evidenced by affidavits of work authorization. Additional documents include various solicitations and bids for unrelated projects, such as recycling services in Iowa City, construction of Foothills Drive in Farmington, a trailer-mounted sealant melter in Ames, and cooperative grocery purchasing by Wayne-Finger Lakes BOCES. These documents outline project scopes, submission deadlines, bid procedures, and compliance requirements, reflecting a broad scope of procurement activities across multiple jurisdictions and sectors. Overall, the focus is on transparent, secure bidding processes with clear instructions for vendors to ensure fair competition and adherence to legal and procedural standards.
HighAI Summary for 24-048 Addendum 7 - Ellis Dining Hall Remodel: Addendum 7 for the Ellis Dining Hall Remodel (Event 24-048) issued on 2/5/2024. It extends the response deadline to 3/1/2024 at 2:00 PM (CT) and provides critical Q&A clarifications regarding security equipment, card access, and equipment installation responsibilities for the General Contractor. The document also lists required attachments including insurance certificates, affidavits, and OSHA 10 training proof.
PDF
PDF, High priority: read this firstconstruction-drawings
HighAI Summary for Ellis Dining Hall Renovation Construction Drawings: This document contains construction drawings for the Ellis Dining Hall Renovation at the University of Central Missouri, Warrensburg, Missouri. It includes detailed structural specifications such as stud sizes, spacing, and load conditions, general plan notes for contractors, demolition reflected ceiling plans, and foundation plans. The drawings provide critical technical details necessary for construction, including coordination notes with architectural drawings and demolition instructions. The document serves as a comprehensive guide for contractors to verify existing conditions, coordinate with architectural elements, and execute the renovation work according to specified standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Ellis Dining Hall Renovation General Specifications: This document is the General Specifications for the Ellis Dining Hall Renovation project at the University of Central Missouri, dated prior to the bid closing in February 2024. It outlines the bidding process, contract terms, insurance requirements, bidder qualifications, site removal and disposal, and construction work supply and installation requirements. Key points include the requirement for bids to be submitted via the UCM Ebid system, a prebid meeting scheduled for February 13, 2024, mandatory performance and payment bonds, compliance with prevailing wage and MBE/WBE requirements, and detailed instructions on vendor responsibilities and contract administration.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for Ellis Dining Renovation RFI Responses Part 2: This document contains responses to Requests for Information (RFIs) regarding the Ellis Dining Renovation. It provides clarifications on tile types and installation, requirements for field-verifying casework dimensions for the coke and ice kitchen area, and technical guidance on electrical panel circuitry and breaker relocation.
PDF
PDF, High priority: read this firstmechanical-compliance-certificate
HighAI Summary for Ellis Mechanical COMcheck Compliance Certificate: This document is a Mechanical Compliance Certificate for the Ellis Dining Hall project located in Warrensburg, Missouri, under the 2018 IECC energy code. It certifies that the proposed mechanical alteration project complies with the 2018 IECC requirements using COMcheck Software Version 4.1.5.5. The certificate details the HVAC system specifications, including heating and cooling capacities and efficiencies, and confirms compliance with mandatory inspection checklist requirements. The certificate is signed by Erik Knudsen, PE, dated 1/11/24.
DOCX
DOCX, High priority: read this first10 pages · contract-document
HighAI Summary for General Construction Contractual Requirements - Instructions to Bidders: This document titled 'General Construction Contractual Requirements' provides comprehensive instructions to bidders for construction projects. It includes detailed articles on pre-bid conference, bidder obligations, interpretations and substitutions, bidding procedures, signing of bids, and other contractual requirements. The document outlines necessary forms for bid submission and post-award requirements, including bid bonds, contractor qualifications, MBE/WBE compliance forms, affidavits, and insurance certificates. It also specifies conditions related to prevailing wage laws for projects over $75,000. The document serves as a critical guide for bidders to understand the terms, conditions, and procedural requirements to participate in the bidding process effectively.
PDF
PDF, High priority: read this first2 pages · application-for-waiver
HighAI Summary for MBE-WBE Application for Waiver Form: This document is the MBE/WBE Application for Waiver Form used for projects of $100,000 or more. It is submitted by bidders who fail to meet the Minority Business Enterprise (MBE) or Women Business Enterprise (WBE) participation goals. The form requires detailed information about the bidder's good faith efforts to include MBE/WBE subcontractors, including attendance at pre-bid conferences, advertising efforts, contacts with MBE/WBEs, negotiation attempts, and reasons for rejection of MBE/WBEs. The form also includes certification by the general contractor that the information provided is true and correct. This form is critical for evaluating compliance with MBE/WBE participation requirements and requesting a waiver of the set goals.
PDF
PDF, High priority: read this first15 pages · wage-determination
HighAI Summary for Prevailing Wage Law Rules - Missouri Department of Labor: This document contains the Prevailing Wage Law Rules from the Missouri Department of Labor and Industrial Relations, Division 30, Chapter 3. It outlines the prevailing wage requirements for workers on publicly funded construction projects in Missouri. The rules specify the process for obtaining annual wage orders, the necessity of incorporating these wage rates into contract specifications, and the responsibilities of public bodies and contractors regarding payroll submissions and compliance inspections. The document includes definitions relevant to wage determinations and references legal authority and amendments up to 2016. It serves as a regulatory guide to ensure contractors pay at least the minimum prevailing wages as determined by the department.
PDF
PDF, High priority: read this first2 pages · insurance-requirements
HighAI Summary for UCM Construction Insurance Requirements: This document outlines the insurance requirements for contractors working on construction projects for the University of Central Missouri. It specifies the types and minimum amounts of insurance coverage required, including Workmen's Compensation, Public Liability and Property Damage, Owner's Protective Liability, and Builder's Risk Insurance. The document mandates that insurance policies must be maintained throughout the contract duration and that certificates of insurance must be provided to the University's Procurement Office before contract execution and work commencement. It also details the responsibilities for maintaining coverage and reporting cancellations or alterations. Additional coverage may be required based on project specifics.
PDF
PDF, Low priority1 page · affidavit
LowAI Summary for Affidavit for Affirmative Action - University of Central Missouri: This document is an Affidavit for Affirmative Action related to a contract project at the University of Central Missouri. It certifies that the contractor employs fewer than 50 persons in aggregate, thereby meeting the applicable Affirmative Action requirements as set forth in the University's General Conditions. The affidavit is sworn before a notary public, including details such as the date, county, and commission expiration of the notary.
PDF
PDF, Low priority1 page · affidavit
LowAI Summary for Affidavit of Work Authorization for University of Central Missouri: This document is an Affidavit of Work Authorization related to services for the University of Central Missouri. It affirms that the contractor and their personnel are enrolled in and will comply with a federal work authorization program, specifically referencing RSMo Chapter 285.530 (2). The affidavit includes a sworn statement by a contractor representative and a notary public section. It also references the E-Verify federal work authorization program for verification purposes.
PDF
PDF, Low prioritybrand-guidance
LowAI Summary for Brand Guidance for FPO & Procurement - University of Central Missouri: This document provides brand guidance for the University of Central Missouri's Facilities Planning and Operations (FPO) and Procurement departments. It emphasizes the importance of institutional stewardship and consistent branding in campus spaces, detailing approved paint colors, furniture, metal finishes, and window treatments to maintain a unified and professional visual identity. The guidance encourages collaboration with Integrated Marketing and Communications (IMC) to ensure brand compliance and effective budget use. The document includes specific rules such as the 10% rule for accent red on walls and outlines standards for upholstery, case goods, and finishes to support a cohesive campus environment.
LowAI Summary for MBE-WBE Compliance Evaluation Form for Projects $100,000 or More: This MBE/WBE Compliance Evaluation Form is to be completed by bidders and submitted with bid proposals for projects valued at $100,000 or more. It collects data on minority/woman-owned business participation, including firm details, subcontract work description, contract dollar amounts, and certification status. The form ensures bidders meet MBE/WBE participation goals and includes sections for base bid and alternate work, certification verification, and signatures from the general contractor. It supports compliance with minority and women business enterprise requirements.
LowAI Summary for MBE-WBE Eligibility Determination Form: This document is the MBE/WBE Eligibility Determination Form used for projects of $100,000 or more. It collects detailed information about a firm's ownership, control, business nature, years in business, gross receipts, bonding, and certification history related to minority and women-owned business enterprise status. The form includes sections for identifying owners with 5% or more ownership, their contributions, management control, and any business relationships affecting ownership. It requires a sworn affidavit and notarization to certify the accuracy of the information provided. The form is intended to verify eligibility for MBE/WBE certification and ensure compliance with related regulations.
LowAI Summary for MBE-WBE Eligibility Determination Form for Joint Ventures: This document is the MBE/WBE Eligibility Determination Form for Joint Ventures for projects of $100,000 or more. It is used to determine the minority/woman-owned business status of joint ventures, including details about the joint venture's name, address, phone, and the firms involved. The form requires descriptions of the roles, experience, ownership percentages, profit and loss sharing, capital contributions, and management responsibilities. It includes affidavits to be signed and notarized, affirming the accuracy of the information and agreement to provide updates and allow audits. The form is intended to ensure compliance with MBE/WBE participation requirements in contracts.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
A Prebid Meeting will be held on Tuesday February 13 at 10:00am at the Ellis Hall Entrance, UCM Main Campus, 301 Anderson Street, Warrensburg, MO.
Vendors are strongly encouraged to attend. This will be the only time vendors will be able to view the site.
** BIDS ACCEPTED VIA UCM Ebid SYSTEM ONLY ** Any and all communication from bidders regarding specifications, requirements, competitive procurement process, etc., must be directed to the buyer as indicated in the Bid Contact Information section. Communication made with parties outside of Procurement may result in your solicitation response being disqualified;
UCM bids are secured by Ionwave until the closing date and time. Bid pricing is available for viewing when the bid is unsealed. To access bid pricing after the bid is unsealed, go to the UCM Ebid system (Ionwave), click Closed Bids, the bid number, Bid Tabulation by Supplier.
Note: Pending any award, the bid is reviewed and evaluated for responsiveness and responsibility. No award will be made until the evaluation and review is complete by UCM.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award