Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on September 18, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Emergency Communication Center UPS Replacement

Closed
FA446023Q0274Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

335999 - All Other Miscellaneous Electrical Equipment and Component Manufacturing

Place of Performance

Little Rock AFB, AR, 72099, USA

Set-Aside

SBA

Documents

7

Addendum to 52.212-1 Instructions to Offerors

PDF, High priority: read this firstamendment
High

Addendum to FAR 52.212-2 Evaluation--Commercial Products and Commercial Services

PDF, High priority: read this firstevaluation-criteria
High

Clauses and Provisions

PDF, High priority: read this firstspecifications
High

Combined Synopsis/Solicitation: Emergency Communication Center UPS Replacement

PDF, High priority: read this firstrfq
High

Performance Work Statement - Emergency Communication Center UPS Replacement

PDF, High priority: read this firstsow
High

SCA Wage Determination No. 2015-5117 Rev. 22

PDF, High priority: read this firstwage-determination
High

Solicitation FA446023Q0274 Questions and Answers

PDF, High priority: read this firstq-and-a
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4460 19 Cons Pka
Contacts2 people available
OfficeLITTLE ROCK AFB, AR, 72099-4971, USA
Office AddressLITTLE ROCK AFB, AR, 72099-4971, USA

Full Description

Show more
The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and non-personal services necessary to design, build, & install an uninterrupted power supply system as described below. The contractor shall perform to the standards in this contract. The contractor will provide installation and warranty services at building 239 on Little Rock Air Force Base, work shall be completed within 120 Days After Date of Contract. - Provide delivery, assembly, and installation services. - Provide an equipment layout on floor for the server room. - Provide and label all installed equipment. - Must provide copies of electrical drawings, diagrams and final install modifications upon project completion. - Must install new UPS system, reroute existing UPS input feed, interconnect of UPS bypass and UPS main system, and reroute conduit to new output panel. - Provide all necessary supplies to include wiring. - Provide project management. - Will coordinate electrical requirements with contractors. - Ensure that all components and equipment needed for installation and removal will have the ability to pass through standard 32 doorways without modifications. - New UPS must fit within existing comm room and available space (Site Visit Encouraged) - Must decommission, remove, and dispose the existing UPS. - Must be capable of power supply required to electronic ECC systems in the event of power failure to BLDG 239. - Provide UPS cabinet and Bypass cabinet. - Provide and install a minimum 25KVA/25KW UPS. - Must have Safe-swap, slide in / slide out Power Module with rear connector. Includes fan box for easy replacement. - Must have Modular Static Switch to allow replacement without installing an external bypass. - Must have Internal Maintenance Bypass - Provide and install the battery system capable of 90 minutes of runtime @ 3kW load - 6.9 minutes of runtime @ 25kW rated to a 10 year battery design life with Two (2) High-capacity, Long life VRLA Modular Smart battery strings - Provide and install a maintenance bypass cabinet with input transformer rated at 25kW isolating the UPS completely during service operations for 480V In, 208V Out. - Must have the physical ability for front access only. - Must provide UPS startup, equipment labeling and closeout documents. Must provide 1 years of factory warranty to the system FAR 52.212-1 Instructions to Offerors--Commercial Products and Commercial Services. INSTRUCTIONS TO OFFERORS 1. In order to be determined responsive, all quotes must be complete on the Combined/Synopsis Solicitation, responding directly to the requirements of this solicitation and sent to all the identified POC's email. A complete quote consists of the following: a) Complete the unit price and extended price (under "Pricing Schedule" on Page 4 of the Combined/Synopsis Solicitation), b) Fill in required provisions and clauses. FAR 52.204-24 must be completed. If the annual certification has been completed in the System for Award Management (SAM), FAR 52.212-3 does not need to be completed. c) All vendors must have an active registration in SAM at time of quote submission. 2. A responsive quote will include the following documents and information: - Detailed breakdown of proposed prices. - Detailed project outline & timeline for delivery and installation. - Strict adherence to the completion date listed on the solicitation is required. - Information regarding similar contracts held at other Federal installations (if applicable). - A statement of capability. - Quotes in response to this solicitation must be submitted via email to the primary and secondary POC's listed on SAM solicitation no later than 10:00 AM (CDT) Tuesday, 19 September 2023. 3. A site visit will be held at Little Rock AFB, AR at 09:00 AM (CDT) Thursday, 14 September 2023. All contractors will meet at the Little Rock AFB Visitor Center before visiting the place of performance. Please RSVP for the site visit NLT 09:00 AM (CDT) Wednesday, 13 September 2023. If no RSVPs are received by the time specified, then the site visit will be cancelled. 4. All questions are due via email to all POC's listed on the solicitation NLT 02:00 PM (CDT) - 15 September 2023. Answers will subsequently be posted on SAM.gov.

More opportunities from Department Of Defense → FA4460 19 Cons Pka

Same awarding agency

NAICS: 238290
New
Federal
Vertical Transportation Equipment (VTE) Maintenance, Repair, & Inspection Services
Solicitation # FA446027Q0005
Solicitation FA446027Q0005 is a non-personal services contract for the comprehensive management, maintenance, repair, and inspection of real property vertical transportation equipment (VTE) at Little Rock Air Force Base, Arkansas. The scope of work covers freight and passenger elevators, escalators, and potentially wheelchair lifts, dock levelers, and dumbwaiters. The contractor is required to maintain a VTE availability rate of 95 percent and adhere to strict response times, including in-person arrival for emergency calls within two hours and commencement of routine work within 24 hours. All services must comply with ASME A17.1, ANSI/ASME A17.2, and other applicable safety and fire protection standards. A written Maintenance Control Program must be delivered within 30 calendar days of the award. This is a total small business set-aside under NAICS code 238290. The government will award the contract to the responsible offeror based on a lowest-price technically acceptable sequence, where the lowest-priced offer is selected if they possess an acceptable past performance rating, defined as at least two years of similar experience within the last four years. Proposals are due by November 18, 2026, and must be submitted via email to the designated points of contact. Payment and invoicing will be processed through Wide Area WorkFlow (WAWF) by the 10th of each month. Access to the base requires a valid REAL ID, and a single site visit is scheduled for October 26, 2026, requiring an RSVP by October 22, 2026.
Other Building Equipment Contractors

POSTED

5 days ago

DEADLINE

in 29 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS