Emergency Generator Replacement
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Pleasanton is soliciting bids for the replacement and installation of new emergency diesel generators at five critical water and sewer facilities: Laurel Creek Booster Pump Station, 900 Santos Booster Pump Station, 1300 Santos Booster Pump Station, S-7 Sewer Lift Station, and S-12 Sewer Lift Station. The scope includes demolition and removal of existing generators and ancillary systems, construction of new concrete foundations, installation of new generators ranging from 80kW to 200kW, and comprehensive electrical upgrades such as new Automatic Transfer Switches and SCADA system modifications. Additional work includes temporary power provision, hazardous material disposal, fencing adjustments, surface restoration, permitting, and full testing and startup of all systems. All work must comply with the City of Pleasanton Standard Specifications (July 2024), Caltrans Standard Specifications (2025), IBC, ASCE 7, and industry standards from ASTM, ANSI, IEEE, NEMA, and UL. The solicitation is sealed and governed by a Lowest Price Technically Acceptable methodology, where bidders must be deemed responsible by holding a valid California Class A or C-10 license, submitting bid security, and demonstrating financial and operational capability. The winning bidder will be awarded based on the lowest responsive bid, with no trade-offs between cost and technical merit. Performance is required at the specified city facilities with strict operational continuity requirements, mandating the use of temporary generators and pumping systems to prevent service disruptions during construction. Outages for electrical feed shutdowns require 28 days’ advance notice and Engineer approval, while other outages require 14 days’ notice. Safety mandates include a submitted safety plan within 20 days of notice to proceed, compliance with OSHA standards for confined spaces including mandated air changes in wetwells and drywells, gas monitoring at all access points, and noise control using mufflers on equipment. Environmental obligations prohibit discharge of untreated oily substances or chlorinated water, requiring dechlorination and regulatory approval. All submittals must be delivered electronically via USB flash drives in specified formats—PDF, DOC, XLS, AutoCAD, JPG, TIF, MP4—with paper submissions strictly prohibited. Warranties, bonds, and certifications must be bound in labeled three-ring binders. The contract carries a one-year warranty from date of acceptance, and the project has no defined overall duration beyond interim timelines such as a 30-day submittal review period and a five
General Info
Agency
NAICS
Place of Performance
Pleasanton, CA, 94588, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
More opportunities from California → City of Pleasanton
Same awarding agency
