Emergency Power Generator B Switchgear and Headworks, EP007
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The City of Fresno is preparing to install three 2.5-megawatt natural gas emergency backup generators at its existing wastewater treatment facility, with the work confined to a 5,000 square-foot area. The scope includes the full installation of the generators along with all necessary appurtenances such as a natural gas supply pipeline, transfer switches, modifications to the electrical system, and site grading to support the new infrastructure. This project is intended to ensure reliable emergency power for critical operations at the facility during utility outages or disruptions. The contract, identified as EP007 and titled Emergency Power Generator B Switchgear and Headworks, was posted on June 5, 2026, and is managed by the City of Fresno's engineering division. Samuel Nadores, a licensed professional engineer, serves as the primary point of contact and can be reached via email or phone for inquiries. The performance location is firmly established at the wastewater treatment facility in Fresno, California, with a postal code of 93706. No set-aside provisions, NAICS codes, or contract award details have been specified in the current forecast data, indicating this is a preliminary notice ahead of formal solicitation.
General Info
Agency
NAICS
Place of Performance
S. Cornelia Ave. and W Jensen Ave., Fresno, CA, 93706Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
