Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Emerson St. Sinkhole Repair

Active
MC-0322784State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Emerson St Sinkhole Repair project (Contract MC-0322784 / WP# N10346) is a construction effort by the Port of Seattle to repair a disconnect between the King County sewer line and the BNSF stormwater/sewer line at 1795 W Emerson Street, Seattle. The scope of work includes excavation, sealing the existing connection point, establishing a new connection to the main King County line, and installing one new catch basin while replacing an existing one on port property. The project requires asphalt excavation and repaving, as well as significant traffic controls due to the impact on multiple lanes of a busy roadway. The estimated contract value ranges from 400,000 to 600,000 dollars, with a required completion timeline of 120 calendar days. Bids must be submitted electronically by October 26, 2026, at 2:00 p.m. to the Port of Seattle. Qualified bidders must be registered for state excise tax, maintain Washington workers' compensation coverage, and provide a WMBE Commitment Plan to meet an 8% aspirational goal. The contract requires a bid bond, as well as performance and payment bonds for the full contract sum. Work must adhere to Washington State Department of Transportation and City of Seattle standard specifications, and the contractor must appoint a representative available 24 hours a day throughout construction. The project is subject to prevailing wage requirements under Chapter 39.12 RCW and requires compliance with Title VI non-discrimination and ADA standards.

General Info

Port of Seattle sinkhole repair project, $400k-$600k value, 120-day timeline, bids due 10/26/2026.

Documents

(5)

MC-0322784 Emerson St Sinkhole Repair Bid Package

PDF•8 pages•itb

MC-0322784 Emerson St Sinkhole Repair Project Manual

PDF•431 pages•rfb

MC-0322784 / N10346 Emerson St Sinkhole Repair - Project Drawings

PDF•19 pages•specifications

SPUE-SS-26 00145 - Seattle Side Sewer Permit

PDF•1 page•other

SUUTIL0029027 - 1795 W Emerson St Sinkhole Repair Street Use Permit

PDF•7 pages•other

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyWashington → Waterfront Project Management
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Marilynn MontenegroPort Contact
Brandon KlettProject Manager

Interested Companies (8)

Show more
ProDims
Kirkland, WA
AHBL
G & I Plumbing

See All 8 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Work entails replacing a portion of stormwater drain line that was disconnected from the main King County line that runs under Emerson Street. Includes excavation; removal and replacement of line; new connection point to main line; fill and asphalt. Also requires considerable traffic controls (Impacts several lanes of traffic on a busy roadway).

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive project involves the demolition of existing infrastructure and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC, plumbing, and testing facilities. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This solicitation is open to small businesses and certified disadvantaged, minority, and women-owned enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 10 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project, located in Highland, California, involves extensive water infrastructure installation managed by James W. Fowler Co. for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project requires the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches in diameter, as well as 54-inch and 145.5-inch diameter tie-ins. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope also encompasses electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This solicitation is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a bid submission deadline of September 29, 2026. The project emphasizes the inclusion of minority, women, and disadvantaged business enterprises, offering assistance with bonding, insurance, and materials to maximize their participation.
James W. Fowler Co.

POSTED

about 10 hours ago

DEADLINE

in 3 days
View Details

More opportunities from Washington → Waterfront Project Management

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS