Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Michigan was posted on January 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ENG 26-08 Monkey Run Interceptor Rehabilitation

Closed
2026-ENGINEERING-006State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
The Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project in Oakland, California, is a comprehensive infrastructure effort for the East Bay Municipal Utility District. The scope of work involves the rehabilitation of open and covered concrete structures, including resurfacing and the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, the installation of valves and piping appurtenances, and the modification of sluice and slide gates. Additionally, the project requires the rehabilitation of reactor mixers and aerators, the replacement of motor control center components, and the installation of new electrical and instrumentation systems. Support services include the operation of a temporary 11 MGD pumped bypass, lead abatement, excavation, trench work, and surveying. This solicitation is set aside for Small Business (SB), including SBA certified Veteran Owned Small Business (VOSB), Service-Disabled Veteran Owned Small Business (SDVOSB), Women-Owned Small Business (WOSB), and HUBZone Small Business (HUBZone SB). Garney Pacific, Inc. is seeking qualified subcontractors, specifically targeting those with DBE, MBE, WBE, and SBE certifications. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company. Quotes are due by November 17, 2026, with a final bid date of November 18, 2026.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 12 days

AI Contract Overview

Show more

The contract titled ENG 26-08 Monkey Run Interceptor Rehabilitation focuses on the restoration of a brick sewer segment of the Monkey Run Interceptor Sewer, originally constructed around 1907. A recent condition assessment conducted in 2022 revealed that while the sewer is generally in fair condition, there are areas of infiltration leakage and compromised mortar joints that need repair to extend the sewer’s service life. The contract involves addressing these identified defects through rehabilitation efforts based on the attached Condition Assessment Report. The solicitation was issued by the City of Jackson, Michigan’s Engineering Department, with a response deadline in early March 2026. Primary and secondary contacts for the project are the Assistant City Engineer and the Purchasing Coordinator, ensuring clear lines of communication. This contract is subject to additional federal requirements linked to HUD funding, mandating compliance with laws promoting minority and women-owned business participation, fair labor standards, and environmental regulations such as the Clean Air and Clean Water Acts. To secure project completion and protect the city’s interests post-completion, maintenance and guarantee bonds are required, obligating the contractor to repair defects arising from workmanship, materials, or equipment issues for a defined warranty period. These bonds provide the city with legal recourse and financial protection if corrective work is necessary after project closeout. The overall provisions ensure the contractual work is performed satisfactorily, meets federal funding requirements, and safeguards municipal interests against performance failures or payments disputes.

General Info

Rehabilitation of 1907 Monkey Run sewer, addressing leaks, ensuring compliance, bonding, and warranty protections.

Documents

10
PDF, High priority: read this first13 pages · special-provisions
High
PDF, High priority: read this first202 pages · technical-specifications
High
PDF, High priority: read this first3 pages · special-notice
High
PDF, High priority: read this first35 pages · ifb
High
PDF, High priority: read this first53 pages · specifications
High
PDF, Low priorityother
Low
PDF, Low priority2 pages · payment-bond
Low
PDF, Low priority3 pages · bond
Low
PDF, Low priority47 pages · condition-assessment-report
Low
PDF, Low priority2 pages · performance-bond
Low

Read all 10 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 14 days
  • Lift Station No. 85 ReplacementOpen now, due in 25 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMichigan → Engineering
Contacts2 people available
OfficeJackson, MI, 49201, USA

Interested Companies (6)

Builders Exchange of Lansing
Gm & SonsNovi, MI
Inland Waters Pollution ControlDetroit, MI

See All 6 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The brick sewer to be rehabilitated is part of a longer interceptor sewer known as the Monkey Run Sewer. The brick section was constructed in approximately 1907. In 2022, the sewer was cleaned, inspected by closed-circuit television and evaluated to determine current conditions and deficiencies. The sewer was found to be in fair condition with sections with infiltration leaking and compromised mortar joints. The purpose of the contract is to address those defects to extend the service life of the sewer. The Condition Assessment Report (prepared by Consultants, Ltd, dated 11-25-22) is attached for informational purposes.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS