This Award Notice opportunity from Florida was posted on November 4, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Contract CAV11 is a professional services agreement between the Florida Department of Transportation District 7 and Patel, Greene and Associates, LLC for continuing bridge engineering design services. Executed on November 4, 2024, the contract establishes a maximum fee of 5,000,000.00 dollars with a performance period of 60 months. The agreement provides a framework for various task work orders focused on the rehabilitation, preservation, and technical support of bridge infrastructure across Pinellas and Hillsborough Counties.
The scope of work is diverse, ranging from high-level technical support for the District 1 and 7 Structures and Maintenance Office, including load ratings and structural evaluations, to specific design and post-design construction assistance. Key projects include the rehabilitation of movable bridges such as the Corey and Welch Causeways, substructure and superstructure repairs for multiple bridges, and specialized tasks like structural steel coating and painting. Individual task work orders specify detailed requirements for construction contract documentation, plan revisions, and shop drawing reviews, with several major projects scheduled for completion by November 3, 2029.
General Info
FDOT District 7 hired Patel, Greene and Associates for bridge engineering services through 2029.
HighAI Summary for FDOT Contract CAV11 - Patel, Greene and Associates, LLC: Standard Professional Services Agreement between the Florida Department of Transportation (District 7) and Patel, Greene and Associates, LLC for Bridge Engineering Design Services. Executed November 4, 2024, the contract establishes a maximum fee of $5,000,000.00 for services to be completed within 60 months. It includes authorized subconsultants and references the February 2021 Standard Professional Services Agreement Terms.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Task Work Order 01, Amendment 01 - Bridge Engineering Design Services: Attachment A: Scope of Services for Task Work Order No. 01, Amendment 01 under Contract CAV11. The document outlines the requirements for technical support services for the District 1&7 Structures and Maintenance Office (DSMO), including quality assurance reviews, structural evaluations, load ratings, and bridge inspections.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order #10 - Hillsborough County Movable Bridge Repairs: Task Work Order #10 under Base Consultant Agreement CAV11 for bridge engineering design services. The project involves the rehabilitation of substructure, superstructure, mechanical, electrical, and movable bridge elements on three bridges in Hillsborough County (FP ID 451326 1 32 01). Dated September 2026, the document defines the scope of services, objectives, and technical requirements for the preparation of construction contract plans and specifications.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order 11 - Pinellas County Bridge Painting: Task Work Order #11 under Contract CAV11 issued to Patel, Greene and Associates, LLC on October 22, 2026. The project provides for the coating of structural steel and mechanical equipment on four bridges in Pinellas County. The total compensation is a lump sum of $239,190.00, with a completion deadline of November 3, 2029.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order #5 - Hillsborough County Bridge Long Repairs: Task Work Order #5 under Contract No. CAV11 for the State of Florida. The document defines the scope of services for post-design construction assistance for bridge rehabilitation in Hillsborough County (FPID 449982 1 62 02), including engineering assistance, plan revisions, shop drawing reviews, and meeting attendance.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order #6 - I-275/SR 93 NB Howard Frankland Bridge Substructure Repairs: Task Work Order #6 under Contract CAV11 for Patel, Greene and Associates, LLC to provide Post Design Services for the I-275/SR 93 NB Howard Frankland Bridge Substructure Repairs in Pinellas County. The agreement, dated August 20, 2026, includes a scope of services for engineering assistance, shop drawing reviews, and meeting attendance with a total estimated compensation of $30,397.00 and a completion date of 11/3/2029.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order 7 - SR 688/Walshingham Road Moveable Bridge Repairs: Task Work Order #7 under Contract CAV11, dated August 20, 2026, between the Department and Patel, Greene and Associates, LLC. The order provides for Post Design Services for the SR 688/Walshingham Road Moveable Bridge Repairs in Pinellas County. Services include engineering assistance, plan revisions, review of shop drawings, and meeting attendance. The total compensation for this task is $246,632.00, with a completion date of 11/3/2029.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order #8 - Pinellas County Bridge Repairs (Contract CAV11): Task Work Order #8 issued October 5, 2026, under Contract CAV11 for Patel, Greene and Associates, LLC. The project involves the design of rehabilitation for substructure and superstructure elements on four bridges in Pinellas County (Bridge Nos. 150053, 150054, 150137, and 150951). The total estimated compensation is $326,320.00, with a completion date of November 3, 2029.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Task Work Order Amendment 2 - Contract CAV11 (Patel, Greene and Associates, LLC): Amendment No. 2 to Task Work Order No. 2 for Contract CAV11, executed August 18, 2026. The amendment increases the contract value by $71,216.00 for professional bridge engineering design services in Pinellas County. It expands the scope of services to include additional project objectives, plan updates, and structural repairs for Bridge Nos. 150042, 150001, and 150074, including steel girder repairs and deck/sidewalk rehabilitation based on updated inspection reports.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order No. 01, Amendment 01 - Bridge Engineering Design Services: Amendment 01 to Task Work Order No. 01 under Contract CAV11 (Financial Project ID 412593 1 32 14). This document defines the Scope of Services for providing multi-faceted engineering and technical support to the District 1&7 Structures and Maintenance Office (DSMO), including quality assurance, structural evaluations, load ratings, and bridge inspections.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order No. 01 - Bridge Engineering Design Services: Task Work Order No. 01 under Contract No. CAV11 (Financial Project ID 412593 1 32 14) for Bridge Engineering Design Services. The document defines the scope of services for technical support to the District 1&7 Structures and Maintenance Office (DSMO), including quality assurance reviews, structural evaluations, load ratings, and bridge inspections. Compensation is based on an upset limit fee estimate.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Task Work Order No. 2 - Pinellas County Deck Repair Various Locations: This document is Attachment A (Scope of Services) for Task Work Order No. 2 under Contract No. CAV11. It outlines the requirements for a Consultant to provide bridge engineering design services, including construction contract documentation, plans, and specifications to rehabilitate and preserve bridge decks and repair structural steel on six bridges in Pinellas County, adhering to FDOT guidelines.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order No. 3 - Pinellas County Movable Bridge Repair: Task Work Order No. 3 under Contract CAV11, dated July 31, 2025, awarded to Patel, Greene and Associates, LLC. The project involves providing engineering design services, plans, and specifications to rehabilitate the Corey Causeway and Welch Causeway movable bridges in Pinellas County. The total compensation for this task is $1,686,863.00, with a completion deadline of November 3, 2029. The scope includes extensive electrical, mechanical, and structural repairs.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order No. 4 - Hillsborough County Bridge Repair: Task Work Order No. 4 under Contract No. CAV11 for Bridge Engineering Design Services. The scope involves providing Post Design Construction Assistance for Financial Project ID 445832 1 62 02, including meeting attendance, field reviews, plan revisions, and shop drawing reviews.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order No. 9 - Bridge No. 100301 Rehabilitation: Task Work Order #9 under Contract CAV11 between the Florida Department of Transportation and Patel, Greene and Associates, LLC. The project involves the design of rehabilitation for substructure and superstructure elements of Bridge No. 100301 in Hillsborough County. The total compensation is estimated at $238,718.00, with a completion deadline of 11/3/2029.
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-CAV11-00040000: The document contains generic instructions regarding factual presentation and clarity, but lacks specific procurement details, solicitation terms, or contractual obligations.
PDF
PDF, Low priorityaward
LowAI Summary for Professional Services 25704 - Bridge Engineering Design Services Selection Results: Selection results for Professional Services 25704 (District 07) regarding continuing Bridge Engineering Design Services. The document lists the final selection rankings as of August 12, 2024, with Patel, Greene and Associates, LLC ranked first, followed by WSP USA Inc. and Volkert, Inc. It also includes the procurement schedule and protest instructions per Florida Statutes.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.