Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Defense was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Engineering & Design Submittal Preparation

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
Scattergood GS. Units 1&2 Green Hydrogen-Reaady Modernization
Solicitation # scattergood-gs-units-12-green-hydrogen-reaady-modernization
Kiewit Infrastructure West Co. is seeking sub-quotes for the Scattergood GS Units 1 and 2 Green Hydrogen-Ready Modernization project for the City of Los Angeles Department of Water and Power. The scope of work is extensive, encompassing professional and technical services such as civil, structural, mechanical, electrical, and instrumentation and controls engineering, as well as utility locating, geotechnical and geophysical investigations, BIM/3D modeling, and environmental assessments. Additional requirements include hazardous materials surveys, permitting support, and CPM scheduling. Interested firms must contact Kiewit to receive an Invitation to Bid via the Building Connected system, with a bid date of September 11, 2026, and a response deadline of September 30, 2026. Eligible bidders include Disadvantaged, Minority, Women, and Other Business Enterprises, provided they hold certifications from recognized agencies such as the SBA or MBDA. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Furthermore, Kiewit, as a signatory to various collective bargaining agreements, requires bidders to demonstrate an ability to maintain labor harmony on the project. For further information or to review plans and specifications, interested parties should contact Lead Estimator Joe Bockelman.
Kiewit Infrastructure West Co.

POSTED

about 13 hours ago

DEADLINE

in 18 days
NAICS: 541330
New
Subcontracting Opportunity: City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3
Solicitation # 27-3214
Parametrix is seeking qualified subconsultants to provide civil engineering design and right-of-way services for the City of Bend’s Southwest Sewer Improvement Phase 3, Project No. 1SSW3. The project aims to address sewer system deficiencies in southwest Bend by extending a gravity trunk sewer line to unsewered areas, decommissioning existing pump stations in the Romaine Village area, and installing service laterals to transition properties from private septic systems to public sewer. The scope may also include roadway reconstruction, ADA curb ramp and curb design, and minor transportation improvements such as turn lanes or mini roundabouts. The project is funded by the Clean Water State Revolving Fund administered through the Oregon Department of Environmental Quality, with a total design and construction budget of 3,875,000 dollars. The procurement process is managed by the City of Bend, with a proposal deadline of September 29, 2026. Selection is based on technical and administrative capabilities, with the potential for interviews to influence final scoring. Key deliverables include a preliminary engineering report, a public outreach plan, and construction contract documents at 30, 60, 90, and 100 percent completion, culminating in record drawings. The City intends to advertise for construction services in Fall or Winter 2027. Parametrix is actively soliciting firms with recognized federal, tribal, state, local, or independent DBE certifications as part of a good faith effort to include small, minority-owned, women-owned, and veteran-owned businesses.
Parametrix

POSTED

about 13 hours ago

DEADLINE

in 17 days

AI Contract Overview

Show more

The contract titled Engineering & Design Submittal Preparation requires the preparation and submission of dimensional diagrams, specification sheets, and manufacturer warranties that comply with AWS D1.2, OSHA, and MIL-STD standards to secure government approval. All deliverables must be technically accurate and fully aligned with federal regulations to ensure compliance during the review and acceptance process. The work is scoped for a small business set-aside under the SBA program, meaning only small businesses are eligible to bid, and the NAICS code 541330 indicates the focus is on architectural and engineering services. Performance of the contract is required to occur in Morris, with bids due by May 19, 2026, at 7:00 PM Eastern Time, following a posting date of May 5, 2026. The contracting entity is the Department of Defense through the W07V Endist Rock Island office, and the subcontract is intended to support defense-related infrastructure or equipment compliance efforts.

General Info

Preparation and submission of engineering deliverables for DoD subcontract, small business set-aside, deadline May 2026.

Agency

Department Of Defense → W07V Endist Rock IslandView Agency

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Morris, IL, USA

Set-Aside

SBA

Documents

This scope was carved out of W912EK26QA035.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Dresden Lock & Dam Catwalk

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist Rock Island
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Defense → W07V Endist Rock Island
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Preparation and submittal of dimensional diagrams, specifications sheets, and manufacturer warranties compliant with AWS D1.2, OSHA, and MIL-STD requirements for government approval.

More opportunities from Department Of Defense → W07V Endist Rock Island

Same awarding agency

NAICS: 237110
New
Federal
88TH RD US ARMY RESERVE CENTER ARLINGTON HEIGHTS, IL WATER INFRASTRUCTURE IMPROVEMENTS- SOLICITATION
Solicitation # W912EK26BA017
The US Army Corps of Engineers Rock Island District is soliciting competitive 8(a) bids under FAR Part 14 for water infrastructure improvements at the 88th RD US Army Reserve Center in Arlington Heights, Illinois. This firm-fixed-price construction project involves a comprehensive scope of work including demolition, directional drilling, and the installation of new water service and main lines. The base bid covers the provision of gate valves, vaults, meters, fire hydrants, and chlorination testing, as well as HMA patching, concrete sidewalk repair, and site restoration. Two additional options are included: Option A focuses on a new water connection to the Village of Arlington Heights watermain and the capping of existing connections, while Option B includes similar connection work along with the investigation of existing storm sewers under Central Road. The project is designated under NAICS code 237110 and requires a 270-day completion period. Bidders must submit all proposals electronically via the PIEE Solicitation Module by September 16, 2026, as emailed or hard copy bids will not be accepted. Key requirements include the submission of a Contractor Quality Control plan within seven calendar days of the Notice to Proceed and adherence to Davis-Bacon Act wage standards. Performance and payment bonds are required at 100 percent of the original contract price. Payment will be administered through the Resident Management System (RMS), and the project incorporates strict quality standards, including a three-phase control system and compliance with ASTM D3740 and E329 for soil and construction inspection.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 5 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS