Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Engineering and Inspection Support

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves on-site engineering inspection, quality assurance, and oversight during the installation of piping systems within the Vacaville area, ensuring all work adheres to technical and regulatory standards. Comprehensive as-built documentation will be required to accurately reflect final installation conditions, and compliance verification will be conducted throughout the process to confirm adherence to project specifications and applicable codes. The scope emphasizes continual field supervision to guarantee the integrity and longevity of the infrastructure being installed. This subcontract is issued under NAICS code 541330 for engineering services and is managed by the Solano Irrigation District in California. Performance is localized to the 95687 zip code in Vacaville, with no additional details provided regarding set-aside status or point of contact. The solicitation was posted on July 10, 2026, and further information is accessible via the provided CEQA Net project link.

General Info

On-site engineering inspection and quality oversight for piping installation in Vacaville, CA, with as-built documentation and compliance verification.

Agency

California → Solano Irrigation District

NAICS

541330 - Engineering ServicesView NAICS

Place of Performance

Vacaville, CA, 95687

Set-Aside

NONE

Documents

This scope was carved out of Locke Drain Replacement.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Solano Irrigation District
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → Solano Irrigation District
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
On-site engineering inspection, quality assurance, and oversight during pipe installation, including as-built documentation and compliance verification.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Corydon Well Replacement (C2305)
Solicitation # C2305
Ardurra Group, Inc. is soliciting proposals for the Corydon Well Replacement Project on behalf of the Elsinore Valley Municipal Water District in California. This professional services contract involves the design, bidding support, and engineering services during construction for a new municipal groundwater production well to replace and abandon the existing Corydon well. The project is divided into two phases: Phase 1 focuses on technical specifications, civil site design, bidding assistance, and full-time on-site construction management; Phase 2 covers the architectural, civil, mechanical, structural, electrical, and instrumentation and controls design for equipping, testing, and commissioning the well. Key technical requirements include the use of 24-inch diameter stainless steel Ful-Flo louvered well screens and matching existing vertical turbine equipment. The total estimated project cost is 2,260,788 dollars, which includes 2,000,000 dollars for construction and a negotiated fee for professional services. Proposals are due by September 1, 2026, via the PlanetBids portal. Award selection is based on demonstrated competence and professional qualifications, with weighted factors including relevant experience (25 percent), project approach (25 percent), scope and schedule (20 percent), innovation (10 percent), cost (10 percent), and overall proposal quality (10 percent). The contract is set aside for various small business categories, including Disadvantaged Business Enterprises (DBE). Compliance requirements are extensive, incorporating the Build America Buy America Act for domestic content, the Iran Contracting Act for proposals over one million dollars, and various federal regulations including 2 CFR Part 200 and the Department of Treasury ASAP payment system. The project is scheduled to start on November 2, 2026. Required submittals include a Preliminary Design Report, a detailed cost proposal broken down by task, and various certifications regarding lobbying, debarment, and the use of domestic iron and steel.
Ardurra Group, Inc.

POSTED

about 7 hours ago

DEADLINE

in 17 days
View Details