This Solicitation opportunity from Town of Peace River was posted on August 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Town of Peace River - Request for Proposal - UTILITIES MASTER PLAN UPDATE
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Town of Peace River is soliciting proposals from qualified professional engineering consulting firms to update its 2010 Utility Master Plan for the local water distribution system. The selected firm will be responsible for assessing existing infrastructure capacity and functionality, calibrating the hydraulic water model, and evaluating current and future system demands based on population projections and growth patterns. The scope of work includes identifying system deficiencies, establishing boundary design conditions for new developments, and providing conceptual designs and cost estimates for necessary improvements. The project culminates in the delivery of a prioritized 15-year capital improvement plan featuring specific triggers for infrastructure upgrades, along with guidance on operations and maintenance. Interested parties must submit their responses by September 16, 2026, at 3:59 PM. This solicitation, identified as AB-2026-05748, is managed by the Water/Wastewater Manager for the Town of Peace River in Alberta.
General Info
Place of Performance
Peace River, AB, CANSet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Examine existing infrastructure capacity and functionality. Determine existing system capacity and ability to support future development. Determine current demands, system condition and regulatory requirements. Review available planning information. Evaluate and prioritize improvements to existing infrastructure. Evaluate future demands based on projected development, growth patterns and population projections. Provide conceptual design requirements and cost estimates for identified deficiencies. Provide an updated water distribution system model. Provide boundary design conditions for new development areas. Develop a 15-year capital improvement plan with priorities and triggers for improvements. Provide guidance on operation and maintenance of existing infrastructure. Provide draft and final reports and all collected project data.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
