Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Test Pump Installation and Operation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

WA, 99202

Set-Aside

NONE

Documents

This scope was carved out of RFP-Well-Drilling-and-Pump-Test-Louie-Creek-Property-Sanpoil-River-Valley.pdf.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

. The Bid Schedule shall be accompanied by the supplemental submittals specified in

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 27 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom . The Bid Schedule shall be accompanied by the supplemental submittals specified in
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyConfederated Tribes of the Colville Reservation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and operates a temporary pumping system to evaluate well yield for prime contractors on Confederated Tribes of the Colville Reservation projects. Installs and removes test pumps and discharge piping, operates step-rate and constant-rate testing, and manages power generators and data logging. Ensures no discharge water enters the Sanpoil River. Delivers pump test data and performance reports.

Similar Contracts

Same NAICS industry code

NAICS: 541330
New
Federal
Consulting Services for Chino Basin Program Aquifer Replenishing Facilities Design
Solicitation # RFP-JV-26-013
The Inland Empire Utilities Agency (IEUA) is soliciting engineering consulting services for the Chino Basin Program Aquifer Replenishing Facilities Design Project (RFP-JV-26-013). The scope of work encompasses project initiation, data gathering, site investigations, detailed design, and procurement support, with the goal of starting injection and monitoring wells drilling by May 2028 and equipping by July 2029. The project is a not-to-exceed contract, and the selection process involves ranking proposals based on quality and thoroughness, with the top three ranked consultants having their fee envelopes opened before the top-ranked firm negotiates final terms for Board of Directors approval. This opportunity is a set-aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), SBA certified HUBZone Small Business (HUBZone SB), and SAM.gov desig. Proposals must be submitted via PlanetBids by January 26, 2027, and must include a cover letter, general qualifications, team experience, and a detailed approach to the scope of work. A separate file containing a fully itemized proposed fee is required. Consultants must adhere to strict DBE compliance, including the Six Good Faith Efforts (GFE) and proof of SBA and MBDA utilization, to avoid being deemed non-responsive. All design work must comply with Cal OSHA, ADA California Building Code, and NFPA 820 standards.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in 2 months
View Details
NAICS: 541330
New
Federal
RFP-JV-26-014 Consulting Services for Chino Basin Program Purified Water Conveyance Design Project
Solicitation # EN25022.03 AND EN28004
The Inland Empire Utilities Agency is soliciting professional engineering consulting services for the Chino Basin Program Purified Water Conveyance Design Project in California. The scope of work involves developing a purified water conveyance system to deliver water from the Advanced Water Purification Facility to injection wells, encompassing utility research, field investigations, detailed design across multiple disciplines, and engineering support during the construction bid award phase. Key deliverables include technical reports, specifications, Opinion of Probable Construction Cost estimates, and final electronic files in PDF and AutoCAD formats. This is a not-to-exceed contract with a pricing term that must remain firm for the initial two-year period. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Proposals are due by January 26, 2027, and will be evaluated based on a 100-point scale focusing on project critical success factors, communication, regulatory support, control approach, implementation planning, and technical challenges. The agency will rank proposals and open fee envelopes for the top three consultants, potentially conducting interviews to determine the final award. Compliance with the Buy America Preference and various federal and state grant requirements, including the Davis-Bacon Act and DBE requirements, is mandatory.
Inland Empire Utilities Agency

POSTED

about 1 hour ago

DEADLINE

in 2 months
View Details

More opportunities from Confederated Tribes of the Colville Reservation

Same awarding agency

NAICS: 237110
New
SLED
. The Bid Schedule shall be accompanied by the supplemental submittals specified in
Solicitation # RFP-Well-Drilling-and-Pump-Test-Louie-Creek-Property-Sanpoil-River-Valley.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for the drilling, construction, and testing of a new water well on the Louie Creek Property in the Sanpoil River Valley, Washington. This project is intended to evaluate the feasibility of a fish hatchery and is expected to be performed between March 1, 2026, and May 28, 2027, with a preferred completion date of April 30, 2027. The scope of work includes mobilization, drilling and installing temporary and permanent casing, well development, and pump testing. Contractors must hold a current State of Washington Well Operator License and adhere to strict technical specifications, including the implementation of a Fluid Management Plan to prevent runoff into the Sanpoil River and compliance with AWWA Standard A-100 for plumbness and alignment testing. Proposals are due by December 22, 2026, and will be evaluated based on a 100-point system where cost is a factor, but the Tribes may select a non-lowest-cost solution to ensure reliability. Indian preference applies per the Colville Tribal Employment Rights Ordinance (TERO), with additional points awarded to Indian-owned businesses and those certified under Chapter 10-3. Bidders must provide proof of active SAM.gov registration and a UEI number. The contract requires a performance bond for values exceeding $100,000 or a 25% retainage. Final award acceptance rests with the Colville Business Council, and payments are contingent upon the availability of funds in the tribal treasury.
Water and Sewer Line and Related Structures Construction

POSTED

about 2 hours ago

DEADLINE

in 27 days
View Details
NAICS: 424410
New
SLED
ECE/Head Start – Bulk Food/Product Purchase and Delivery for Nutrition Services
Solicitation # 2026_nutrition_servicedelivery_rfpsct-edits.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for a prime vendor to provide bulk food and product purchase and delivery for nutrition services supporting Head Start sites in Omak, Inchelium, Keller, and Nespelem, Washington. The scope of work requires regular weekly deliveries, with up to two deliveries per school per week. Deliveries are conducted on a dark delivery schedule after hours to ensure student safety, with a strict prohibition on backing on school grounds when children are present. The vendor must be capable of fulfilling "will call" orders within 30 minutes of notification. All products must adhere to strict temperature controls, with frozen meats maintained at or below 0 degrees F and chilled items between 32 and 41 degrees F. Packaging must meet USDA and FDA industry standards, and retail packaging is prohibited. The contract requires compliance with the Buy American provision (7 CFR 210.21(d)), necessitating that products be substantially produced in the U.S. Vendors must provide Child Nutrition (CN) labels and product specification sheets as required by OSPI. Evaluation is based on a 100-point scale covering responsiveness, qualifications, experience with Tribal entities, and cost, with a specific preference given to responsible Indian Bidders. Required certifications include TERO certification and a certification regarding debarment and suspension. The vendor must maintain general liability insurance with limits of $1,000,000 per occurrence and $2,000,000 aggregate. Invoices are submitted monthly in duplicate and payments are based on progress achieved.
General Line Grocery Merchant Wholesalers

POSTED

about 2 hours ago

DEADLINE

in 11 months
View Details
NAICS: 238210
New
SLED
Colville Fuels, Turnkey Standby Emergency Power Systems for Inchelium and Keller Community Stores
Solicitation # 202611-RFP-Colville-Fuels-Backup-Generators.pdf
Colville Fuels LLC is soliciting proposals for the design, installation, and commissioning of turnkey standby emergency power systems for the Inchelium and Keller Community Stores in Washington. The project requires the installation of generators, Level 2 Closed Transition Style automatic transfer switches, and fuel tanks with ultrasonic sensors. Each system must be capable of supporting full store operations, including refrigeration, lighting, and point-of-sale systems, with a minimum runtime of 30 hours at 100% load. The selected contractor is responsible for all labor, materials, and engineering, including the provision of as-built drawings and remote monitoring systems using TCP/IP or DNP3/IP protocols. Proposals are due by December 31, 2026, and will be evaluated on a 100-point scale. Key evaluation criteria include price and cost proposals (20 points), demonstrated experience (15 points), qualifications of key personnel (15 points), proposal quality and methodology (15 points), Indian preference (15 points), references and past performance (10 points), and maintenance and service support (10 points). Indian preference is tiered from 100% Colville Business Enterprises to non-certified Indian-owned businesses. The final contract will be negotiated upon selection and will include a no-assignment provision.
Electrical Contractors and Other Wiring Installation Contractors

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 541611
New
SLED
Colville Fuels, Coyote Ridge Golf Course — Consultant
Solicitation # Coyote-Ridge-Consultant-RFP-Final-with-Exhibits.pdf
Colville Fuels, LLC is seeking a qualified consultant to conduct a comprehensive operational, market, and capital needs assessment for the Coyote Ridge Golf Course in Washington. The primary objective is to develop an actionable operating and capital plan for FY 2027 and an integrated five-year development plan spanning FY 2027 through FY 2031. Key deliverables include an evidence-based SWOT analysis of golf, retail, and food-and-beverage operations, a market and demographic analysis, an on-site capital needs assessment, and a feasibility evaluation for an RV park, including its financial performance and operational impact. Proposals are due by November 20, 2026, and will be evaluated on a 100-point scale covering technical experience, the RV park approach, and the work plan, with an additional 0 to 15 points awarded for Indian preference. The contract is subject to the Colville Tribal Code Chapter 10-3 and TERO compliance requirements. Selected respondents must provide a fixed fee or not-to-exceed cost proposal with defined payment milestones. Final contract terms will be negotiated upon selection, and the agreement will include a no-assignment provision requiring written consent from Colville Fuels. There is no specified set-aside status for this solicitation.
Administrative Management and General Management Consulting Services

POSTED

about 2 hours ago

DEADLINE

in 5 days
View Details
NAICS: 115310
New
SLED
Inchelium District forestry, Mastication
Solicitation # INCH-MASTICATION-FALL-2026.pdf
The Confederated Tribes of the Colville Reservation has issued a solicitation for mastication services within the Inchelium District, specifically targeting the Olds Cr. Cook Cr. units. The project covers a total of 42 acres, divided between Olds Cr. Cook Cr. 116 (11 acres) and Olds Cr. Cook Cr. 292 (31 acres). The scope of work includes felling hardwoods up to 12 inches DBH when mixed with conifers and removing trees 10 inches DBH or less with specific Hawksworth mistletoe ratings. Generally, trees with a DBH of 8 inches or greater are to be left unless marked by the Contracting Officer's Representative. Bids must be submitted in a sealed envelope labeled MASTICATION FALL 2026 by 4:30 PM on December 9, 2026. Required documentation includes a work plan, Title 10 certification, proof of insurance, SAM.gov registration, and a bid evaluation sheet with pricing per acre for each unit. Evaluation is based on technical qualifications, reasonable pricing, and a strong preference for certified Indian-owned firms. Payment is structured as partial payments of 80% upon 100% completion of each pay item, with 20% withheld until the final contract approval by the COR. Standard payment is issued within ten working days of final approval. Contractors are required to provide state industrial accident insurance and must undergo TERO approval for key personnel. No set-aside status is specified for this solicitation.
Support Activities for Forestry

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 541618
New
SLED
Rainbow Beach Resort — Master Planning Consultant
Solicitation # Rainbow-Beach-Resort-Master-Planning-RFP-11162026.pdf
Issued on November 16, 2026, by Colville Fuels, LLC on behalf of the Confederated Tribes of the Colville Reservation, this solicitation seeks a qualified consultant to develop a comprehensive master plan for the Rainbow Beach Resort in Washington. The project scope involves assessing existing operations, conducting market demand analysis, and evaluating property layout alternatives for the resort's cabins, campsites, store, and restaurant. The selected consultant will be required to produce three materially different layout alternatives and a preferred operational master plan that includes a financial and implementation strategy. Key deliverables must be provided in editable formats, including Word, PDF, and Excel with working formulas. Proposals are due by January 2, 2027, and will be evaluated on a 100-point scale. Scoring criteria include project understanding and approach (25 points), relevant experience and past performance (20 points), Indian Preference (15 points), team qualifications (15 points), cost proposal (15 points), and schedule and project management (10 points). Respondents must provide a fixed fee or not-to-exceed cost proposal, three comparable engagement examples, and three client references. The final contract will require the consultant to consent to the jurisdiction of the Colville Tribes and its Tribal Court and include a no-assignment provision. There is no set-aside status for this solicitation.
Other Management Consulting Services

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 115310
New
SLED
Fall PCT, Olds Cr., Cook Cr., Gold Mt., Jones, Wells, Lynx, Stranger Cr., Elbow Lake
Solicitation # FallPCT26Updated.pdf
The Confederated Tribes of the Colville Reservation is soliciting proposals for Mastication and Precommercial Thinning (PCT) projects across several tracts on the Colville Reservation, including Olds Creek, Cook Creek, Gold Mountain, Wells Creek, Lynx Creek, Stranger Creek, and Elbow Lake. The contractor is responsible for providing all labor, equipment, supervision, and materials to perform thinning operations using only chainsaws or hand tools. Key deliverables include the creation of two-foot wide game trails with all slash removed and the submission of a detailed work plan. Tree selection is based on specific quality standards, prioritizing dominant crown positions, health, and vigor, while prohibiting the cutting of trees with a diameter at breast height of 8 inches or greater unless marked by the Contracting Officer's Representative. Bids must be submitted in a sealed envelope to the Inchelium Forestry Office by 4:30 PM on December 9, 2026. Required documentation includes a cover letter, project area maps, bid sheets, work specifications, a TERO compliance and utilization plan, debarment certification, proof of insurance, and SAM.gov registration. The contractor must comply with the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51% of seasonal or temporary employees to be of Indian preference. Payment is issued ten working days after final approval, with 80% paid upon completion of each pay item and 20% withheld until the entire contract is approved. Evaluation is based on technical qualifications, reasonable pricing, and responsibility determinations.
Support Activities for Forestry

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 541350
New
SLED
Environmental Trust, Owhi Drywell Inspection 2026
Solicitation # OwhiDryWell_IFB2026.pdf
The Confederated Tribes of the Colville Reservation is soliciting bids for the Environmental Trust, Owhi Drywell Inspection 2026. The project involves the inspection of a historic dry well located at the Owhi Lake Dam in Nespelem, Washington. The scope of work requires the contractor to mobilize a crew with confined space entry equipment, utilize transfer pumps for dewatering, and manually remove sediment and debris. A visual pipe camera inspection must be performed to determine the well's depth, document sidewalk penetrations, and verify the material of the structure's bottom. Deliverables include photographs, video, and a comprehensive summary report detailing the findings and current conditions of the well. This solicitation is designated as an Indian Preference set-aside. The contract will be awarded to the lowest, responsive, and responsible bidder who provides a bid on a per-site and total project area basis. Applicants must submit a bid sheet, work plan, debarment certification, TERO compliance plan, and proof of Sams.gov registration by 2:00 PM on December 1, 2026. Required qualifications include proof of Contractor's Liability Insurance of at least $1,000,000. The contractor must adhere to the Tribal Employment Rights Ordinance (TERO), Title VI Program requirements, and various Tribal Law and Order Codes covering industrial safety, water quality, and cultural resources protection. Additionally, a TERO contract fee of 5% applies to all contracts valued at $5,000.00 or more.
Building Inspection Services

POSTED

about 2 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
SLED
CCT, Roger’s Bar Church Restoration
Solicitation # RogersBarChurchRestoration_DesignBuildRFP.pdf
The Confederated Tribes of the Colville Reservation is seeking a qualified Design-Build firm to provide comprehensive preservation, stabilization, and repair services for the historic Roger’s Bar Church. The scope of work encompasses design, engineering, preconstruction, construction, testing, and closeout, organized into three primary phases: immediate stabilization to arrest decay, priority repairs for life safety and envelope preservation, and user serviceability and structural preservation alternates. The project is based on an existing conditions assessment from May 2026, with a rough-order-of-magnitude planning budget of $526,000. Proposals must be submitted electronically to Josie Hohn by December 4, 2026. Evaluation is based on a 100-point scoring matrix covering staff qualifications, firm qualifications, project approach, fee proposals, and native ownership. The selection process involves an initial scoring phase followed by interviews to identify a firm for final negotiations. Requirements include the provision of payment and performance bonds, insurance, and a plan for promoting native participation. Contractors must also provide daily construction reports and adhere to strict confidentiality and disclosure requirements regarding conflicts of interest and suspension or debarment status.
Commercial and Institutional Building Construction

POSTED

about 2 hours ago

DEADLINE

in 9 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS