This Award Notice opportunity from Florida was posted on July 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Contract CAT74 is a Standard Professional Services Agreement between the Florida Department of Transportation and HNTB Corporation for continuing services for project design. The contract establishes a total budgetary ceiling of $5,000,000.00 with a performance period of 60 months. The scope of work is executed through various Task Work Orders covering a wide range of engineering and design services, including bridge replacements and rehabilitation, roadway widening, lighting evaluations, pedestrian bridge design, and technical support for the DRIVE D/C initiative.
Key projects under this agreement include the Gateway Boulevard northbound on-ramp to I-95, the SE Avenue G pedestrian bridge, and the SR 5/US 1 bridge replacement. The contract utilizes several subconsultants, including Consor North America, Inc., Keith & Associates, Inc., and INTERA. Funding is managed through a series of funding authorization increases, with total approved funding reaching $2,552,675.03 as of the most recent update. There is no set-aside status associated with this contract.
General Info
FDOT and HNTB Corporation agreement for project design services totaling $5,000,000 over 60 months.
HighAI Summary for Amendment 1 to Agreement CAT74 - HNTB Corporation: Amendment 1 to the Standard Professional Services Agreement (CAT74) between the Florida Department of Transportation and HNTB Corporation, executed on 09/09/2024. The purpose of this amendment is to correct the job classification for subconsultant C.H. Perez & Associates Consulting Engineers, Inc., updating the item to 'SUR Survey/GIS/SUE Analyst 2 Home' at a rate of $92.07 per hour.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract CAT74 - Task Work Order Amendment 1: Task Work Order Amendment 1 for Contract CAT74 with HNTB Corporation. The amendment increases the task work order amount by $55,744.22 to provide Landscape Architectural support for post-design services during the establishment phase of the SR 9 (I-95) project from Broward/Palm Beach County Line to Linton Blvd. Scope includes establishment period inspections, travel, reporting, and coordination with PM, CEI, and Contractor.
PDF
PDF, High priority: read this first166 pages · rfp
HighAI Summary for FDOT AD#25402 Continuing Services for Project Design RFP: Request for Proposal (RFP) issued by the Florida Department of Transportation (FDOT) on April 22, 2024, for Continuing Services for Project Design (AD#25402). The document notifies shortlisted firms to submit resumes, organization charts, and required certifications by May 6, 2024, and to attend interviews on May 7, 2024. It outlines a 5-year contract term and specific professional liability insurance requirements of $250,000.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for FDOT Amendment 2 - CAT74 Subconsultant Acquisition: Amendment Number 2 to Agreement CAT74 (Continuing Services for Project Design) dated 04/17/2025. The document authorizes the transfer of subconsultant duties and associated Table 6 rates from Consor Engineers LLC to Consor North America, Inc. It includes a supporting Assignment Agreement and Exhibit A listing multiple assigned contracts across Districts 1 and 2.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Contract CAT74 Funding Authorization Increase: Funding Authorization Number 1 for FDOT Contract CAT74 (HNTB Corporation) dated 12/19/2025. This document authorizes an additional $77,810.00 in Work Program Funds, bringing the total approved funding to $227,810.00 against a total budgetary ceiling of $5,000,000.00 for continuing services for project design.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Contract CAT74 Funding Authorization Increase #4: A funding authorization increase for State of Florida Department of Transportation Contract No. CAT74, issued to HNTB Corporation. The document approves an additional $132,109.50 in Work Program Funds (Financial Project No. 441926-3-32-01), bringing the total approved funding to $2,552,675.03 against a total budgetary ceiling of $5,000,000.00.
PDF
PDF, High priority: read this first142 pages · contract-document
HighAI Summary for FDOT Standard Professional Services Agreement - Contract CAT74: A Standard Professional Services Agreement between the Florida Department of Transportation (FDOT) and HNTB Corporation for continuing services for project design. The contract specifies a maximum fee of $5,000,000.00, a performance period of 60 months, and lists several authorized subconsultants. It incorporates standard terms from February 2021 and references Exhibit A (Scope of Services) and Exhibit B (Method of Compensation).
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDOT Task Work Order 10 - Broward Blvd Truck Parking Expansion: Task Work Order (TWO) #10 under Contract CAT74, dated September 8, 2026, for professional services provided by HNTB Corporation. The project involves design services for signalization, lighting, ITS, and drainage to repurpose a Park-and-Ride facility into a truck parking facility at Broward Boulevard and I-95. The total compensation is $359,451.70 with a completion date of July 24, 2029.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDOT Task Work Order 13 - Districtwide Lighting Evaluations: Task Work Order (TWO) No. 13 under Contract CAT74, issued by the Florida Department of Transportation to HNTB Corporation. The agreement, dated August 27, 2026, authorizes professional engineering services for Districtwide Lighting Evaluations across four locations in Broward and Palm Beach counties. The scope includes project management, field reviews, photometric analysis, and the preparation of a lighting conditions memorandum. The total compensation is limited to $96,094.84, with a completion deadline of July 24, 2029.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDOT Task Work Order 14 - SE Avenue G Pedestrian Bridge: Task Work Order (TWO) 14 under Contract CAT74 issued to HNTB Corporation for design services to replace the pedestrian bridge at SE Avenue G over the SFCD Canal No. 1 in Belle Glade, FL. The agreement, dated 10/12/2026, establishes a limiting compensation amount of $156,548.32 with a completion date of 7/24/2029. The scope includes structural design of foundation and substructure elements, coordination with bridge manufacturers, and the preparation of complete construction contract documents.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDOT Task Work Order 14 - SE Avenue G Pedestrian Bridge: Task Work Order (TWO) #14 under Contract CAT74 for HNTB Corporation to provide design services for the replacement of the pedestrian bridge at SE Avenue G over the SFCD Canal No. 1 in Belle Glade, FL. The agreement, dated 10/12/2026, establishes a limiting compensation amount of $156,548.32 with a completion date of 7/24/2029. The scope includes structural design, project management, and the preparation of construction contract documents.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDOT Task Work Order #8 - Gateway Boulevard Northbound On-ramp to I-95: Task Work Order #8 under Contract CAT74 for HNTB Corporation to provide design services for the minor widening and extension of the northbound on-ramp from Gateway Boulevard at I-95. Dated 08/17/2026, the agreement specifies a total compensation of $357,130.48 for basic services, SUE/survey, and actual expenses, with a completion date of 7/24/2029. The scope includes project management, public involvement, and design for roadway, drainage, and utility coordination.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDOT Task Work Order 9 - US-1/SR-5 Roosevelt Bridge: Task Work Order No. 9 under Contract CAT74 between the Florida Department of Transportation and HNTB Corporation. The project involves design services for minor bridge rehabilitation of the Roosevelt Bridge over the St. Lucie River (Bridge Nos. 890151 and 890152), specifically focusing on the removal and replacement of expansion joints. The total compensation is $204,016.90 with a completion date of July 24, 2029.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDOT Task Work Order - Bridge Feasibility Study (Bridge No. 930064): Task Work Order for professional services awarded to HNTB Corporation for a Bridge Feasibility Study of Bridge No. 930064 (Atlantic Avenue over the Intracoastal Waterway in Delray Beach, FL). The project focuses on pedestrian safety improvements, including widening and replacement alternatives. The total compensation is $227,711.83, with a completion date of 7/24/2029.
PDF
PDF, High priority: read this first11 pages · task-order-award
HighAI Summary for FDOT Task Work Order No. 2 - SR 5/US 1 Bridge Replacement: Task Work Order (TWO) No. 2 for Contract No. CAT74, issued by the Florida Department of Transportation (FDOT) to HNTB Corporation and Consor North America, Inc. The document authorizes post-design engineering services for the SR 5/US 1 Bridge Replacement over Earman River (FPID 442891-1-62-02). It includes a detailed scope of services, staff hour estimates, and a total compensation amount of $214,009.53.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDOT Task Work Order No. 4 - Contract CAT74: Task Work Order No. 4 under Contract CAT74 between the Florida Department of Transportation and HNTB Corporation (with services provided by Keith & Associates, Inc.). The agreement provides for landscape architecture post-design support services for the SR 9 (I-95) project from Broward/Palm Beach County Line to Linton Blvd. The scope includes up to 8 establishment period inspections and coordination with PM, CEI, and Contractor. The total limiting compensation is $19,027.93, with a completion date of 7/24/2029.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order 11 - SR-9/I-95 Guardrail All Saint Lucie County: Task Work Order (TWO) 11 under Contract CAT74, dated August 21, 2026, authorizing HNTB Corporation to provide design services for median guardrail along I-95 in St. Lucie County. The scope includes coordination, schedule management, and the development of design and production plans. The total compensation is $285,831.31, with a completion deadline of July 24, 2029.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order 5 - HNTB Corporation - PIO Support Services: Task Work Order No. 5 under Contract CA74 for HNTB Corporation, dated March 3, 2026. The order authorizes PIO Support Services for a hybrid public meeting regarding project 449823-1 (SR-810/W Hillsboro Blvd). The total authorized compensation is $25,628.34, with services to be completed by July 24, 2029. Scope includes mailing list preparation, workshop coordination, collateral production, and website management.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order CAT74 - Spanish River Blvd SR800 Bridges: Task Work Order (TWO #1) under Contract CAT74 for professional services provided by HNTB Corporation and subconsultant INTERA. The project involves post-design services and coastal engineering analysis for scour countermeasures at the Spanish River Blvd SR800 Bridges over the Intracoastal Waterway. The scope includes a rapid assessment, a detailed assessment, and coordination. The total limiting compensation is $11,568.80, with a completion date of 7/24/2029.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for Task Work Order No. 7 Amendment 1 - CAT74: Amendment 1 to Task Work Order No. 7 under Contract CAT74 for FDOT Project FPID 441926-3-32-01. The document defines the scope of services to provide technical support (Chief Engineer 2, Engineer 1, and Engineering Intern) for the DRIVE D/C initiative for the District 4 Design Office for a duration of 12 months under a Maximum Limiting Amount compensation method.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for Task Work Order No. 7 Amendment 1 - Contract CAT74: Amendment 1 to Task Work Order No. 7 under Contract CAT74 for HNTB Corporation. The purpose is to provide continued technical support for the DRIVE D/C initiative for the FDOT District 4 Design Office, including the provision of a Chief Engineer 2, Engineer 1, and Engineering Intern. The document includes a scope of services, funds approval for $255,094.00, and a staff hour estimate.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Task Work Order No. 7 Amendment 2 - Contract CAT74: Amendment 2 to Task Work Order No. 7 for Contract CAT74 (Project FPID 441926-3-32-01). The document defines the scope of services for HNTB Corporation to provide technical support for the DRIVE D/C initiative and DRIVE for the FDOT District 4 Design Office for a period of 12 months under a Maximum Limiting Amount compensation method.
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-CAT74-W0010100: The document contains a single sentence regarding the attribution of information, data, and text to the source. It does not contain procurement-specific details.
PDF
PDF, Low prioritymodification
LowAI Summary for FDOT Contract CAT74 Funding Authorization Increase (FA 2): Funding Authorization Increase (FA 2) for FDOT Contract CAT74 (Continuing Services for Project Design) awarded to HNTB Corporation. Dated 06/03/2026, this document authorizes an additional $100,000.00 in Work Program Funds (Financial Project No. 441926-3-32-01), bringing the total approved funding to $327,810.00 against a budgetary ceiling of $5,000,000.00.
PDF
PDF, Low prioritytask-order-award
LowAI Summary for Task Work Order No. 6 - HNTB Corporation (Contract CAT74): Task Work Order (TWO) No. 6 dated March 9, 2026, for professional services provided by HNTB Corporation under Contract CAT74. The purpose is to provide post design services for FPL Lighting along SR 811 (Dixie Highway), including RFI responses, field reviews, and plan revisions. The total compensation is a lump sum of $6,162.34, with a completion date of July 24, 2029.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.