This Award Notice opportunity from Florida was posted on October 29, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Contract CAZ57 is a Standard Professional Services Agreement between the Florida Department of Transportation and WSP USA Inc. for the I-4 (SR 400) Beyond the Ultimate (BTU) Engineering Support CSC. The contract provides for a wide range of professional services, including design, survey, and geotechnical engineering, specifically focusing on segments of SR 400 from East of SR 46 to East of Dirksen Drive and from SR 434 to West of SR 472. The agreement utilizes a variety of subconsultants, including HDR, RES, BPA, GCM, Kittelson, McKim & Creed, and others, to execute specialized tasks such as Mobile LiDar and archaeological services.
The contract has a term of up to 120 months, with various task work orders extending to October 28, 2035. While the initial maximum fee was set at 20,000,000.00 dollars, Amendment 6 increased the budgetary ceiling to 30,000,000.00 dollars. As of September 2026, the total approved funding reached 22,946,247.00 dollars through a series of funding authorization increases. The contract is managed through multiple task work orders and amendments that adjust scopes of work, redistribute funds between compensation elements, and establish loaded labor rates for prime and subconsultants.
General Info
FDOT and WSP USA Inc. engineering services for I-4 BTU, capped at $30 million.
HighAI Summary for Amendment 1 to Agreement CAZ57 - WSP USA Inc.: Amendment No. 1 to the Standard Professional Services Agreement (CAZ57) between the Florida Department of Transportation and WSP USA Inc., dated January 28, 2026. The purpose of this amendment is to add loaded labor rates for various job classes, including Project Manager, Principal Engineer, and Senior Engineer, for the I-4 (SR 400) Beyond the Ultimate (BTU) Engineering Support CSC.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 2 to Agreement CAZ57 - WSP USA Inc.: Amendment No. 2 to the Standard Professional Services Agreement (CAZ57) dated 02/11/2026 for I-4 (SR 400) Beyond the Ultimate (BTU) Engineering Support. The amendment authorizes Archaeological Consultants, Inc. as a subconsultant, establishes their loaded labor rates in Table 6, and implements a contract fee limit of $500,000 for the subconsultant.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 4 to Agreement CAZ57 - WSP USA Inc.: Amendment Number 4 to the Standard Professional Services Agreement (CAZ57) between the Florida Department of Transportation and WSP USA Inc. for I-4 (SR 400) Beyond the Ultimate (BTU) Engineering Support. This amendment modifies Exhibit B (Method of Compensation) to include a contract fee limit of up to $500,000 for subconsultant Arrive Alive Traffic Control, LLC, pending an approved overhead audit.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 5 to Agreement CAZ57 - WSP USA Inc.: Amendment No. 5 to the Standard Professional Services Agreement (CAZ57) between the State of Florida Department of Transportation and WSP USA Inc. for I-4 (SR 400) Beyond the Ultimate (BTU) Engineering Support CSC. The purpose of this amendment, executed on 03/31/2026, is to authorize Terracor Consultants, Inc. as a subconsultant and establish their loaded labor rates in Table 6.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract CAZ57 Task Work Order 3 Amendment 4 - WSP USA Inc.: Task Work Order Amendment No. 4 for Contract CAZ57, dated June 17, 2026, between WSP USA Inc. and FDDT. The purpose of this amendment is to remove the scope of work for TWO 3.3 from the project. The document specifies a decrease in funds and a redistribution of compensation elements across multiple consultants, including WSP, HDR, and RES.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Contract CAZ57 Task Work Order 4 Amendment 3 - WSP USA Inc.: Task Work Order Amendment No. 3 for Contract CAZ57 with WSP USA Inc., dated 06/09/2026. The amendment modifies professional services for SR 400 (I-4) from East of SR 46 to East of Dirksen Drive. It specifies a decrease in total funds and a redistribution of compensation elements, specifically affecting geotechnical services provided by Ardaman, GEC, and Arrive Alive.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for FDOT Agreement CAZ57 Amendment 3 - WSP USA Inc.: Amendment Number 3 to the Standard Professional Services Agreement (CAZ57) between the Florida Department of Transportation and WSP USA Inc. for I-4 (SR 400) Beyond the Ultimate (BTU) Engineering Support CSC. Executed on February 11, 2026, the primary purpose of this amendment is to add a unit rate for Mobile LiDar Equipment provided by DRMP, Inc. at a rate of $3,793.00 per day.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for FDOT Amendment 6 - Agreement CAZ57 (WSP USA Inc.): Amendment Number 6 to Standard Professional Services Agreement CAZ57 between the Florida Department of Transportation and WSP USA Inc. for I-4 (SR 400) Beyond the Ultimate (BTU) Engineering Support CSC. Executed on June 11, 2026, this modification increases the budgetary ceiling to $30,000,000.00.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Contract CAZ57 Funding Authorization Increase: A funding authorization increase notice dated 08/06/2026 for FDOT Contract No. CAZ57 (WSP USA Inc.). The document approves an additional $2,000,000.00 in funding, bringing the total approved funding to $15,921,062.00 out of a total budgetary ceiling of $20,000,000.00.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Contract CAZ57 Funding Authorization Increase: Funding Authorization Increase dated 11/24/2025 for State of Florida Department of Transportation Contract No. CAZ57 (LOA 1 - General Funds) awarded to WSP USA Inc. This document authorizes an additional $2,000,000.00 in funding, bringing the total approved funding to $2,000,000.00 against a total budgetary ceiling of $20,000,000.00.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Contract CAZ57 Funding Authorization Increase: Funding authorization increase for Florida Department of Transportation Contract No. CAZ57 (LOA 11). Dated August 18, 2026, the document notifies WSP USA Inc. of an additional $3,200,000.00 approval, bringing the total approved funding to $19,121,062.00 against a total budgetary ceiling of $30,000,000.00.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Contract CAZ57 Funding Authorization Increase: A funding authorization increase notice from the Florida Department of Transportation (FDOT) dated 04/16/2026 for Contract No. CAZ57 (WSP USA Inc.). The document approves an additional $4,456,656.00 in funding, bringing the total approved funding to $13,921,062.00 against a total budgetary ceiling of $20,000,000.00.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Contract CAZ57 Funding Authorization Increase: Funding authorization increase for FDOT Contract No. CAZ57 (General Funds), dated June 8, 2026. The document approves an additional $1,402,112.00 in funding for WSP USA Inc., bringing the total approved funding to $19,723,174.00 against a total budgetary ceiling of $20,000,000.00.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Contract CAZ57 Funding Authorization Increase: Funding Authorization Increase for Florida Department of Transportation Contract No. CAZ57 (LOA 12), dated September 22, 2026. The document approves an additional $3,825,185.00 in funding for WSP USA Inc., bringing the total approved funding to $22,946,247.00 against a total budgetary ceiling of $30,000,000.00.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Contract CAZ57 Funding Authorization Increase: Funding Authorization Increase for FDOT Contract No. CAZ57 (LOA 2 - General Funds), dated 02/02/2026. The document approves an additional $7,464,406.00 in funding, bringing the total approved funding to $9,464,406.00 against a total budgetary ceiling of $20,000,000.00.
PDF
PDF, High priority: read this firstaward
HighAI Summary for FDOT Contract CAZ57 - I-4 (SR 400) Beyond the Ultimate Engineering Support: Standard Professional Services Agreement between the Florida Department of Transportation (FDOT) and WSP USA Inc. for I-4 (SR 400) Beyond the Ultimate (BTU) Engineering Support CSC. The contract has a maximum fee of $20,000,000.00 and a term of up to 120 months. It includes a list of authorized subconsultants and incorporates standard professional services terms dated September 2025.
PDF
PDF, High priority: read this firstmodification
HighAI Summary for FDOT Funding Authorization Increase - Contract CAZ57: Funding authorization increase for Florida Department of Transportation Contract No. CAZ57 (LOA 4). Dated June 1, 2026, the document approves an additional $4,400,000.00 in funding, bringing the total approved funding to $18,321,062.00 out of a total budgetary ceiling of $20,000,000.00.
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for FDOT Professional Consultant Services Advertisement: An advertisement from the Florida Department of Transportation (FDOT) seeking professional consultant services. The document outlines prequalification requirements, registration via MyFloridaMarketPlace, conflict of interest procedures, and compliance with nondiscrimination statutes. It specifies that prime consultants must be prequalified in the major types of work indicated and provides guidance on the Letter of Response process.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDOT Task Work Order 11 - Contract CAZ57 (WSP USA Inc.): Task Work Order No. 11 under Contract CAZ57 for the Florida Department of Transportation (FDOT). The order authorizes WSP USA Inc. to provide design services for I-4 (SR 400) Beyond the Ultimate (BTU). The total compensation is $3,199,467.01, with a completion date of 8/10/2027. The document includes detailed compensation elements for design, survey, and geotechnical services provided by WSP and various sub-consultants.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for FDOT Task Work Order Amendment 3 - Contract CAZ57 (WSP USA Inc.): Task Work Order Amendment No. 3 for Contract CAZ57 between the Florida Department of Transportation (FDOT) and WSP USA Inc. The amendment increases the total amount for services by $4,363,331.99 to provide professional services for SR 400 (I-4) from East of SR 46 to East of Dirksen Drive, as detailed in Scope of Service A1, A2, and A3. It includes updated compensation elements for WSP, HDR, RES, and BPA.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for FDOT Task Work Order Amendment No. 3 to TWO No. 5 (Contract CAZ57): Task Work Order Amendment No. 3 for professional services under Contract CAZ57 between the Florida Department of Transportation (FDOT) and WSP USA Inc. The purpose of this amendment is to decrease the total amount for services performed by $238,477.30 and recover funds back to the contract. It includes a detailed breakdown of funding decreases across survey services provided by WSP Geomatics and McKim & Creed.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDOT Task Work Order CAZ57 - I-4 (SR 400) BTU Engineering Support: Task Work Order issued by the Florida Department of Transportation (FDOT) to WSP USA Inc. for design services related to I-4 (SR 400) Beyond the Ultimate (BTU) Engineering Support. The order, dated 09/28/2026, authorizes a total compensation of $1,642,278.50 for survey services involving McKim & Creed, DRMP, and WSP Geomatics, with a completion date of 8/10/2027.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDOT Task Work Order No. 3 - Contract CAZ57 (WSP USA Inc.): Task Work Order No. 3 under Contract CAZ57 for professional services provided by WSP USA Inc. to the Florida Department of Transportation. The scope involves SR 400 (I-4) from East of SR 46 to East of Dirksen Drive. The total compensation is $4,514,909.03, with a completion date of 10/28/2035. Compensation is structured as lump sums for various service providers including WSP, HDR, RES, BPA, GCM, and Kittelson.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for FDOT Task Work Order No. 7 - WSP USA Inc. (CAZ57): Task Work Order No. 7 issued by the Florida Department of Transportation to WSP USA Inc. for professional services regarding I-4 Project A SR 400 from East of SR 46 to East of Dirksen Drive. The order is dated February 18, 2026, with a completion date of October 28, 2035, and a total compensation limit of $28,183.16.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order 13 - Contract CAZ57 - Geotechnical Services SR 400 (I-4): Task Work Order No. 13 under Contract CAZ57, issued by the Florida Department of Transportation to WSP USA Inc. dated September 29, 2026. The order authorizes geotechnical services for SR 400 (I-4) from SR 434 to West of SR 472, with a total compensation amount of $2,028,115.23 and a completion date of March 26, 2027.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order 4 - Contract CAZ57 - WSP USA Inc.: Task Work Order No. 4 under Contract CAZ57 issued by the Florida Department of Transportation to WSP USA Inc. for professional geotechnical services on SR 400 (I-4) from East of SR 46 to East of Dirksen Drive. The order is valued at $1,720,948.76 with a completion date of 10/28/2035.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Task Work Order Amendment 1 - Contract CAZ57 (WSP USA Inc.): Task Work Order Amendment No. 1 for Contract CAZ57, executed on 02/25/2026 between FDOT and WSP USA Inc. The purpose of this amendment is to redistribute funds between compensation elements for geotechnical services while maintaining the original execution date of 02/04/2026. It includes a revised compensation table adjusting allocations between GEC and Arrive Alive field and lab services.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Task Work Order Amendment 1 - Contract CAZ57 (WSP USA Inc.): Task Work Order Amendment No. 1 for Contract CAZ57 with WSP USA Inc. regarding professional services for I-4 Project A SR 400. The amendment increases the total amount for services by $80,819.23, specifically allocating funds to Geotechnical Services and Geotechnical Field & Lab Services, bringing the total work order value to $299,222.40.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Task Work Order Amendment 1 - Contract CAZ57 (WSP USA Inc.): Amendment No. 1 to Task Work Order No. 5 under Contract CAZ57 for professional services provided by WSP USA Inc. The amendment increases the total amount for services by $100,860.33 to provide additional services for SR 400 (I-4) from East of SR 46 to East of Dirksen Drive. The funds are specifically allocated to Survey Services Authorized - WSP Geomatics.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Task Work Order Amendment 2 - Contract CAZ57 (WSP USA Inc.): Task Work Order Amendment No. 2 for professional services provided by WSP USA Inc. under Contract CAZ57, dated 04/21/2026. The amendment modifies the scope of services for SR 400 (I-4) from East of SR 46 to East of Dirksen Drive and updates compensation elements for geotechnical services. Total authorizations to date are $13,565,636.02.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Task Work Order Amendment - Contract CAZ57 (WSP USA Inc): Task Work Order Amendment for professional services provided by WSP USA Inc under Contract CAZ57. The amendment covers services for SR 400 (I-4) from East of SR 46 to East of Dirksen Drive. It includes a detailed breakdown of compensation adjustments for various entities (WSP, HDR, RES, BPA, GCM, and Kittelson), with a total amendment amount of $3,401,795.77 and total authorizations to date of $13,080,561.21.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Task Work Order Amendment - Contract CAZ57 (WSP USA Inc.): Task Work Order Amendment for professional services provided by WSP USA Inc. under Contract CAZ57, dated May 18, 2026. The primary purpose of this amendment is to redistribute funds between compensation elements, specifically shifting $100,860.33 from Survey Services (WSP Geomatics) to Survey SUE Services (WSP Geomatics) without changing the total task work order amount.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order CAZ57 - I-4 Project A SR 400: Task Work Order dated 02/13/2026 for Contract No. CAZ57 between FDOT and WSP USA Inc. The consultant will provide geotechnical services for I-4 Project A SR 400 from East of SR 46 to East of Dirksen Drive. The total compensation is $218,403.17, with a completion date of 10/28/2035.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order CAZ57 - I-4 (SR 400) BTU Engineering Support: Task Work Order dated 12/08/2025 under Contract CAZ57, authorizing WSP USA Inc. to provide I-4 (SR 400) Beyond the Ultimate (BTU) Engineering Support CSC. The total compensation is limited to $1,232,284.06, with a completion date of 10/28/2035. The document includes a breakdown of lump sum payments for WSP, HDR, GCM, Kittelson, RES, and BPA.
PDF
PDF, High priority: read this firsttask-order-award
HighAI Summary for Task Work Order CN-550000-CAZ57-00050000 - WSP USA Inc.: Task Work Order dated 02/02/2026 under Contract No. CAZ57 for WSP USA Inc. to provide I-4 (SR 400) Beyond the Ultimate (BTU) Engineering Support CSC. The order is valued at $429,880.00 with a completion date of 10/28/2035.
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-CAZ57-00100000: The provided document content is empty or contains no substantive information beyond a placeholder instruction.
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-CAZ57-00150000: The provided document content is empty or contains no substantive information. Only the filename was provided.
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-CAZ57-00170000: The provided document content is empty or contains no substantive information beyond a placeholder instruction.
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-CAZ57-00180000: The document contains a generic disclaimer stating that provided information is accurate and complete, but lacks any specific procurement details, instructions, or contractual terms.
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-CAZ57-00190000: The document contains a single disclaimer stating that all information, dimensions, and specifications are subject to change without notice. It lacks substantive procurement content.
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-CAZ57-00200000: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-CAZ57-00230000: Unreadable document.
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-CAZ57-00270000: The document contains a single disclaimer stating that all information, dimensions, and specifications are subject to change without notice.
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-CAZ57-00310000: The document contains a single disclaimer stating that all information, dimensions, and specifications are subject to change without notice. It lacks substantive procurement content.
PDF
PDF, Low priorityother
LowAI Summary for CN-550000-CAZ57-00320000: The document contains a general disclaimer stating that information is accurate as of the publication date and subject to change without notice. No specific procurement details are provided.