Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on January 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ENV26-BCP-OKAN-010 - Construction Services - BC Parks - Kekuli Bay Provincial Park Water and Road Upgrades

Closed
BCENV26-BCP-OKAN-010International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
PIDC Project 1 - Bldg. 3 plumbing, boiler, FA, painting and WWTP
Solicitation # 872281
Solicitation 872281, managed by the Bristol Alliance of Companies for U.S. Immigration and Customs Enforcement, covers a comprehensive series of infrastructure repairs and upgrades at the Port Isabel Detention Center in Los Fresnos, Texas. The project scope encompasses multiple critical systems, including the replacement of boilers across several buildings, the installation of a new fire alarm system in the dining facility, and extensive painting and surface repairs for 11 buildings. Additionally, the contract includes plumbing repairs for Multipurpose Building 3 and significant upgrades to the wastewater treatment plant infrastructure, specifically focusing on replacing worn valves, installing sewage grinders on the influent trough, and utilizing coastal weather resistant materials to ensure long term durability. The project is estimated to have a magnitude between 1.5 million and 2 million dollars and is issued as a task order to 8a MACC IDIQ offerors. Contractors are required to adhere to the TX20260236 wage determination for Cameron County and must comply with strict quality control, safety, and security requirements. The procurement process includes a mandatory site survey and a detailed pricing template broken down by CSI division. Key deadlines include a response deadline of September 10, 2026, with final proposals due by September 24, 2026.
Bristol Alliance of Companies

POSTED

about 15 hours ago

DEADLINE

in 14 days
NAICS: 237110
New
JCSD Intervalley Pipeline Project in CA
Solicitation # jcsd-intervalley-pipeline-project-ca
The JCSD Intervalley Pipeline Project in Fontana, California, involves the demolition, furnishing, installation, testing, and operationalization of approximately 3.3 miles of 42-inch cement mortar lined and coated steel potable water transmission pipeline. The scope of work includes the installation of trenchless crossings, air release valves, blowoff assemblies, valves, fittings, and connections to existing water facilities, as well as the construction of flow control facility components and site improvements. Additional requirements encompass pavement removal and restoration, traffic control, utility coordination, disinfection, startup, and commissioning to ensure a complete and operational system. Garney Pacific, Inc. is soliciting quotes from subcontractors and suppliers for various trade scopes, including steel pipe welding, trenchless construction, electrical and instrumentation, and the supply of aggregates, ready-mix concrete, and steel pipes. All subcontractors must utilize union labor and be prepared to provide a 100% Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by September 18, 2026, at 2:00 PM PT. The project is open to various set-aside categories, including Small Business, Women-Owned Small Business, and HUBZone certified entities.
Garney Pacific, Inc.

POSTED

about 15 hours ago

DEADLINE

in 9 days
NAICS: 237110
New
Seeking MBE/DBE/WBE Subcontractors and Suppliers for South Marsham Street Green Infrastructure Project (Romney, WV)
Solicitation # seeking-mbedbewbe-subcontractors-suppliers-south-marsham-street-green-infrastructure-project-romney
Harbel, Inc. is soliciting bids from MBE, DBE, and WBE subcontractors and suppliers for a targeted green-street retrofit project in downtown Romney, West Virginia. The project involves the improvement of approximately 343.59 linear feet of South Marsham Street between Gravel Lane and US Route 50. The scope of work includes the installation of approximately 1,450 square feet of permeable pavement, eight vegetated stormwater management cells, and the treatment of approximately 1.7 acres of impervious surface within a 3.3-acre drainage area. Additional requirements include necessary drainage, underdrain, inlet, pipe, and downspout work, as well as limited curb, sidewalk, ADA, apron, crossing, and traffic-calming improvements to integrate the BMP corridor. Landscaping requirements specify the planting of six native trees and approximately 345 native plants or approved equivalents, concluding with final stabilization, cleanup, and restoration. This opportunity is open to various small business designations, including SDB, WOSB, HUBZone, VOSB, and SDVOSB firms, who are encouraged to form consortiums if individual bid items are too large for a single entity to manage. Bids must be submitted by September 17, 2026, at 4:00 P.M. Interested parties must provide their company name and contact information along with a clear indication of their intent to bid. The primary point of contact for this solicitation is Jennifer Wilson, with administrative coordination handled by Jonah Leith.
Harbel, Inc.

POSTED

about 15 hours ago

DEADLINE

in 7 days
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, is a comprehensive infrastructure initiative issued by the Metropolitan Water District of Southern California through James W. Fowler Co. The scope of work involves the furnishing and installation of approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project includes the installation of both contractor-furnished and Metropolitan-furnished valves ranging from 54 to 132 inches, as well as 54 and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the delivery of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The technical scope extends to electrical upgrades, instrumentation and controls, piping systems, welding, disinfection, surface restoration, and the excavation of cobbles and large boulders. This solicitation is open to small businesses, including certified SDVOSB, MBE, and WBE firms, with a bid submission deadline of September 29, 2026. James W. Fowler Co. is providing support to M/W/DBE subcontractors regarding bonding, insurance, and material procurement, and encourages the use of apprentices for the project.
James W. Fowler Co.

POSTED

about 15 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

Kekuli Bay Provincial Park, located 11 km south of Vernon off Highway 97 on Kalamalka Lake, offers vehicle-accessible campsites known for their scenic lake views and accommodation of large RVs. The park features three terraced loops with irrigated lawns and natural vegetation separating the sites. This contract involves upgrades to the park’s water system and campground roads, focusing on replacing and extending water service piping, decommissioning outdated lines, and performing road improvements including removal of failing asphalt and installation of new sub-base, base, and hot mix asphalt layers. The tender requires submission by 2:00 PM local time on February 24, 2026, to the Ministry of Environment and Climate Change Strategy through BC Parks in the Kootenay/Okanagan Region. Attendance at a mandatory site meeting on February 10, 2026, at the park is required in full for all bidders, at which time tender documents will be distributed. Interested parties must confirm attendance via email to the designated contracting authority. The work aims to enhance infrastructure critical to the park’s operations, ensuring improved water service and roadway conditions for visitors.

General Info

Upgrades to Kekuli Bay Park’s water system and roads; mandatory site meeting February 10, 2026.

Agency

Government of Canada → BC Parks - Provincial Services Branch

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → BC Parks - Provincial Services Branch
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → BC Parks - Provincial Services Branch
Office AddressN/A
Contacts
Contracting Authority

Full Description

Show more
Kekuli Bay Park is located off Highway 97, 11km. south of Vernon. The park is situated on a beautiful bay on the west side of Kalamalka Lake, a destination for waterskiing and boating. This park offers vehicle-accessible campsites including four large double sites. The campsites are arranged in three terraced loops to give all sites an unobstructed view of the lake. The sites have large gravel pads great for big RVs. Irrigated lawn landscaped with young trees and a variety of shrubs separates the sites. There is natural vegetation between the different terraces.This tender includes upgrades to the water system and campground roads at Kekuli Bay Provincial Park. In general, the work consists of the following:Water Upgradeso 110m of 25mm PE water service pipingo 75m of 50mm PE water service pipingo Connections at the main and toilet buildingso Decommissioning old water service pipingo Restoration workRoad Upgradeso Sawcut and remove failing asphalt and road structureo 1520 m2 of 75mm Sub-base, 300mm thicknesso 1400 m2 of 25mm Base, 100mm thicknesso 960 m2 of Hot Mix asphalt, 50mm thicknessTenders marked:“Tender for Kekuli Bay Provincial Park – Water and Road Upgrades” WILL BE RECEIVED UNTIL 2:00 PM local time, February 24th, 2026, electronically as the submission requirements to the Ministry of Environment and Climate Change Strategy, BC Parks Kootenay/Okanagan Region.A mandatory site meeting will be held at 10:00 AM Tuesday, February 10th, 2026 on-site at Kekuli Bay Provincial Park. Attendance of this meeting for its entirety is Mandatory for all bidders.Tender documents will be distributed at the site meeting. To ensure document availability, please confirm your attendance at this meeting by email to: kara.heal@gov.bc.ca

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS